Loading…
Loading…
18,669 results • Best match
Solar Power Plant (Roof Top) for ONGRID System, Single Phase (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6412521 Dated : 04-07-2025 Bid Document 1/9, -- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Solar Power Plant (Roof Top) for ONGRID System, Single Phase (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Bidder Turnover, Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6412964 Dated : 04-07-2025 Bid Document 1/9, -- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Solar Power Plant (Roof Top) for ONGRID System, Single Phase (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Bidder Turnover, Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/7050501 Dated : 28-12-2025 Bid Document 1/8 Number of Auto Extension count 1 Bid to RA enabled No RCM Applicable Yes Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Solar Power Plant (Roof Top) for ONGRID System, Three Phase (V2) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Past Performance, Bidder Turnover, Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2025/B/6478722 Dated : 21-07-2025 Bid Document 1/6, -- Number of days for which Bid would be auto -- extended 7 Past Performance 10 % Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Solar Power Plant (Roof Top) for ONGRID System, Single Phase (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Bidder Turnover, Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6413083 Dated : 04-07-2025 Bid Document 1/9, -- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Solar Power Plant (Roof Top) for ONGRID System, Single Phase (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Experience Criteria, Past Performance, Bidder Turnover, OEM Authorization Certificate, OEM Annual Turnover *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6996491 Dated : 12-12-2025 Bid Document 1/9 Number of Auto Extension count 1 Past Performance 50 % Bid to RA enabled No RCM Applicable Yes Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
SOLAR POWER 2KV, SOLAR PANNEL, SOLAR PANNEL1, BATTERY, INVERTER, TRANSPORT
EPC 20MW AC SOLAR PV PLANT IN DELHI BSES RAJDHANI
Solar System, CCTV
DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING WITH FIVE YEARS COMPREHENSIVE MAINTENANCE CONTRACT OF TOTAL 61 K.W. GRID CONNECTED SOLAR POWER PLANT AND 03 NOS. SOLAR WATER PUMP AT VARIOUS LOCATION IN DABHADI, JALGAON GA BELG
SURVEY,DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING WITH FIVE YEARS COMPREHENSIVE MAINTENANCE CONTRACT OF GRID CONNECTED SOLAR POWER PLANT 20 KW AT DISTRICT PLANNING OFFICE , RAIGAD DIST.RAIGAD STATE OF MAHARASHTRA.
M and R to Amravati Water Supply Scheme. (AMRUT ABHIYAN) Shifting of 33 KV express feeder and 11 KV power supply feeder crossing proposed land for Solar power plant at Simbhora
Design, Manufacture, Supply, Installation, Testing and Commissioinig of Grid Connected Solar Power Plant (with Net Meter) with 5 years Comprehensive Maintenance Contract at Seed Processing Plant, Chikhali, Buldana Capacity 120 kWp.
Design, Manufacture, Supply, Installation, Testing and Commissioning of Grid Connected Solar Power Plant (with Net Meter) with 5 years Comprehensive Maintenance Contract at Seed Processing Plant, Shivani, Akola Capacity 150 kWp.
DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING WITH FIVE YEARS COMPREHENSIVE MAINTAINANCE CONTRACT OF ON GRID CONNECTED SOLAR POWER PLANT (WITH NET METER) AT AJNUJ (SHIRICHI VIHIR) TAL KHANDALA DIST SATARA
DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING WITH FIVE YEARS COMPREHENSIVE MAINTAINANCE CONTRACT OF ON GRID CONNECTED SOLAR POWER PLANT (WITH NET METER) AT BAMBAWADE (NEAR RIVER) TAL PATAN DIST SATARA
DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING WITH FIVE YEARS COMPREHENSIVE MAINTAINANCE CONTRACT OF ON GRID CONNECTED SOLAR POWER PLANT (WITH NET METER) AT DIVASHI BK. (PAVNAI MANDIR) TAL PATAN DIST.SATARA
DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING WITH FIVE YEARS COMPREHENSIVE MAINTAINANCE CONTRACT OF ON GRID CONNECTED SOLAR POWER PLANT (WITH NET METER) AT MENDHOSHI (GAONTHAN 2) TAL PATAN DIST SATARA
Providing consultancy services for preparation of DPR for the installation of SOLAR POWER PLANT under net metering and sale to utility in Nanded Waghala City Municipal Corporation area Nanded (Second Call)
DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING WITH FIVE YEARS COMPREHENSIVE MAINTAINANCE CONTRACT OF ON GRID CONNECTED SOLAR POWER PLANT (WITH NET METER) AT YELEWADI (BARKADE VASTI) TAL MAN DIST SATARA
DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING WITH FIVE YEARS COMPREHENSIVE MAINTAINANCE CONTRACT OF ON GRID CONNECTED SOLAR POWER PLANT (WITH NET METER) AT PALASHI (MANE VASTI) TAL KHATAV DIST SATARA
DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING WITH FIVE YEARS COMPREHENSIVE MAINTAINANCE CONTRACT OF ON GRID CONNECTED SOLAR POWER PLANT (WITH NET METER) AT KURAVALI BK (DATTANAGAR) TAL PHALTAN DIST SATARA
LOOM SOLAR Solar power pack with Solar panel, Warranty 1, LOOM SOLAR Solar power pack with Solar panel, Warranty 1 year
Custom Bid for Services - Deployment of Solar panels for putting up 200 KVA solar plant with net metering arrangement at Haveli Installation Similar Category Design, Supply, Installation, Commissioning and Maintenance of Grid Connected Roof Top Solar Power Plant...
Unbranded Solar power pack with Solar panel, Warranty 2, Unbranded Solar power pack with Solar panel, Warranty 2 year
Unbranded Solar power pack with Solar panel, Warranty 1, Unbranded Solar power pack with Solar panel, Warranty 1 year
Unbranded Solar power pack with Solar panel, Warranty 2, Unbranded Solar power pack with Solar panel, Warranty 2 year
Unbranded Solar power pack with Solar panel, Warranty 2, Unbranded Solar power pack with Solar panel, Warranty 2 year
Unbranded Solar power pack with Solar panel, Warranty 1, Unbranded Solar power pack with Solar panel, Warranty 1 year
Unbranded Solar power pack with Solar panel, Warranty 2, Unbranded Solar power pack with Solar panel, Warranty 2 year
Unbranded Solar power pack with Solar panel, Warranty 2, Unbranded Solar power pack with Solar panel, Warranty 2 year
Unbranded Solar power pack with Solar panel, Warranty 2, Unbranded Solar power pack with Solar panel, Warranty 2 year
LUMINOUS Solar power pack with Solar panel, Warranty 1, LUMINOUS Solar power pack with Solar panel, Warranty 1 year
Solar Power Plant (Roof Top) for ONGRID System, Single Phase (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Experience Criteria, Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2026/B/7078968 Dated : 06-01-2026 Bid Document 1/9, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Past Performance 50 % Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Solar Power Plant (Roof Top) for ONGRID System, Single Phase (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Experience Criteria, Past Performance, Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/7041231 Dated : 24-12-2025 Bid Document 1/8 Number of Auto Extension count 1 Past Performance 50 % Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Solar Power Plant (Roof Top) for ONGRID System, Single Phase (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 2 Bid to RA enabled No RCM Applicable Yes Type of Bid Two Packet Bid Bid Number : GEM/2025/B/6719149 Dated : 23-09-2025 Bid Document 1/9 Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 194642 ePBG Detail Required No (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : EDUCATION OFFICER General Administration Dept Z P Satara 415001, Rural Development Department, Zilla Parishad Satara, (Anis Musa Naikwadi) Splitting
Solar Power Plant (Roof Top) for ONGRID System, Three Phase (V2) (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/7059528 Dated : 31-12-2025 Bid Document 1/6 Number of Auto Extension count 1 Bid to RA enabled No RCM Applicable Yes Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 15 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Installation Solar Power Plant
Procurement and construction of new 5 KWp on-grid roof mounted solar power plant with buyback of existing 1 KWp solar panel system, with the facility of net metering at Indian Oil, Aviation Fuel Station, Aurangabad, Maharashtra.
Solar power pack with Solar panel (Q3)
Solar power pack with Solar panel (Q3)
Solar power pack with Solar panel (Q3)
Solar power pack with Solar panel (Q3)
Solar power pack with Solar panel (Q3)
Solar power pack with Solar panel (Q3)
Solar power pack with Solar panel (Q3)
Solar power pack with Solar panel (Q3)
Solar power pack with Solar panel (Q3)
Solar power pack with Solar panel (Q3)
Solar power pack with Solar panel (Q3)