Loading…
Loading…
18,670 results • Best match
Solar power pack with Solar panel (Q3)
Solar power pack with Solar panel (Q3)
Solar power pack with Solar panel (Q3)
Solar power pack with Solar panel (Q3)
Solar power pack with Solar panel (Q3)
Solar power pack with Solar panel (Q3)
Solar power pack with Solar panel (Q3)
Solar power pack with Solar panel (Q3)
Solar power pack with Solar panel (Q3)
Solar power pack with Solar panel (Q3)
Solar power pack with Solar panel (Q3)
Solar power pack with Solar panel (Q3)
Solar power pack with Solar panel (Q3)
Solar power pack with Solar panel (Q3)
Solar power pack with Solar panel (Q3)
Solar power pack with Solar panel (Q3)
Solar power pack with Solar panel (Q3)
Solar power pack with Solar panel (Q3)
Solar power pack with Solar panel (Q3)
Solar power pack with Solar panel (Q3)
Ramsis can be hung from the ceiling in a stable manner Solar charge controller: 24V, 10A, SPV Module:200 Wp, Battery:12V,150 Ah Solar Lamps (Solar Based Home Systems - Solar Power Packs - Ac Models, Ramsis can be hung from the ceiling in a stable ... manner Solar charge ... 10A, SPV Module:200 ... Ah Solar Lamps ... ( Solar Based ... - Solar Power Packs
Ramsis can be hung from the ceiling in a stable manner Solar charge controller: 24V, 10A, SPV Module:200 Wp, Battery:12V,150 Ah Solar Lamps (Solar Based Home Systems - Solar Power Packs - Ac Models, Ramsis can be hung from the ceiling in a stable ... manner Solar charge ... 10A, SPV Module:200 ... Ah Solar Lamps ... ( Solar Based ... - Solar Power Packs
Installation of Solar Energy Based 2 H.P. Submersible Pump and 3 H.P. Solar Energy on Borewell at Village Shelgaon tq. Degloor Dist. nanded
SUPPLY OF SOLAR INVERTER FOR SOLAR PLANT
SURVEY, DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING WITH FIVE YEARS COMPREHENSIVE MAINTENANCE CONTRACT CUMULATIVE CAPACITY OF 80 KW GRID CONNECTED SOLAR POWER PLANT AT VARIOUS GOVERNMENT BUILDING IN MUMBAI SUBURBAN DISTRICT
FOR THE WORK OF SUPPLY, INSTALLATION, TESTING, COMMISSIONING and MAINTAINING ROOF TOP GRID INTERACTIVE PV SOLAR POWER PLANT USING MULTI CRYSTALLINE PV MODULES AT HUMANITY BUILDING IN UNIVERSITY CAMPUS AURANGABAD. CAPACITY 20KWP.
SURVEY, DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING WITH FIVE YEARS COMPREHENSIVE MAINTENANCE CONTRACT CUMULATIVE CAPACITY OF 155 KW GRID CONNECTED SOLAR POWER PLANT AT VARIOUS GOVERNMENT BUILDING IN MUMBAI SUBURBAN DISTRICT
Survey, Design, Manufacture, Supply, Installation, Testing And Commissioning With Five Years Comprehensive Maintenance Contract Of Grid Connected Solar Power Plant 175 Kw At Maharashtra Judicial Academy and Training Centre Uttan, Dist. Thane
DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING WITH FIVE YEARS COMPREHENSIVE MAINTAINANCE CONTRACT OF ON GRID CONNECTED SOLAR POWER PLANT (WITH NET METER) AT MOGRALE (AMJAI SHINDE VASTI) TAL MAN DIST SATARA
FOR THE WORK OF SUPPLY, INSTALLATION, TESTING, COMMISSIONING And MAINTAINING ROOF TOP GRID INTERACTIVE PV SOLAR POWER PLANT USING MULTI CRYSTALLINE PV MODULES AT BIOCHEMISTRY BUILDING IN UNIVERSITY CAMPUS AURANGABAD. CAPACITY 20KWP
DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING WITH FIVE YEARS COMPREHENSIVE MAINTENANCE CONTRACT OF GRID CONNECTED 150 KW SOLAR POWER PLANT WITH REMOTE MONITORING DEVICE AT TALUKA KRIDA SANKUL KOPRI, THANE,MAHARASHTRA
DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING WITH FIVE YEARS COMPREHENSIVE MAINTENANCE CONTRACT OF 150 KWp GRID CONNECTED SOLAR POWER PLANT WITH NET METER AT OPERATION COMMAND CENTRE AND ASCDCL HQ AURANGABAD,
SUPPLY, INSTALLATION, TESTING, COMMISSIONING AND OPERATION MAINTENANCE FOR A PERIOD OF 5 YEARS OF 150 KWP GRID CONNECTED SOLAR POWER PLANT AT OLD ADMINISTRATIVE BUILDING IN VAN ACADEMY PREMISES, CHANDRAPUR DIST CHANDRAPUR
Survey Design, Manufacture Supply, Installation, Testing And Commissioning With Five Years Comprehensive Maintenance Contract Of Grid Connected Solar Power Plant 50 Kw At Late Gangubai Sambhaji Shinde Bahuddheshiy Hall Rambag Dist. Thane
Design Supply Installation Testing and Commissioning with five years comprehensive maintenance contract of Controller Based Ground Mounted Solar Power Plant total 50 KWp capacity for Existing Water Supply Pumps with 112 meter
FOR THE WORK OF SUPPLY, INSTALLATION, TESTING, COMMISSIONING and MAINTAINING ROOF TOP GRID INTERACTIVE PV SOLAR POWER PLANT USING MULTI CRYSTALLINE PV MODULES AT RUSA BUILDING IN UNIVERSITY CAMPUS AURANGABAD. CAPACITY 20KWP
Solar System (Q3)
providing solar system
PRAVIDING SOLAR SYSTEM
SUPPLY SOLAR SYSTEM
Providing Solar Energy Project System At Grampachayat Kameri Tal Walwa
Solar Power Plant (Roof Top) for ONGRID System, Single Phase (Q3) MSE Relaxation for Turnover Yes | Complete Startup Relaxation for Turnover Yes | Complete Document required from seller Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2026/B/7151932 Dated : 27-01-2026 Bid Document 1/10 Number of Auto Extension count 3 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Solar Power Plant (Roof Top) for ONGRID System, Three Phase (V2) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 2 Bid Number : GEM/2025/B/6803010 Dated : 17-10-2025 Bid Document 1/6, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 2 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Solar Power Plant (Roof Top) for ONGRID System, Single Phase (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6862151 Dated : 06-11-2025 Bid Document 1/9 Number of Auto Extension count 1 Bid to RA enabled No RCM Applicable Yes Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 11 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Solar Power Plant (Roof Top) for ONGRID System, Three Phase (V2) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Bidder Turnover, Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 2 Bid Number : GEM/2025/B/6939418 Dated : 02-12-2025 Bid Document 1/7, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 2 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank ICICI (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 15 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : HPCL Petroleum House, NA, Hindustan Petroleum Corporation Ltd, Ministry of Petroleum and Natural Gas (Hpcl)
supply,installation and commisioning of solar energy base pump
Electrification of Rural water supply scheme through Solar Energy
Implementing dual pump small tap water supply scheme based on solar energy. For supply, erection and commissioning of solar photovoltaic submarine pumping system and other ancillary works (With 5 Years AMC)
20 KWp Solar Power Generation Plant
Providing Solar PV Packs At Village Jaldhara Tq Kinwat Dist Nanded