Loading…
Loading…
1,39,887 results • Best match
Sinking of Solar Power Submersible Pump near Idga at Barida
DSITC of solar power plants with cumulative capacity of 4
INSTALATION OF SOLAR POWER PACK 1KWP. AT SONPETH TQ.KINWAT DIST.NANDED
Selection of Solar Power Generators under PM KUSUM C scheme
Ultra Light Solar Power Multi Utility Charger with Adjustable Charging
Ultra Light Solar Power Multi Utility Charger with Ajdustable Charging
PROVIDING SOLAR POWER PACKS AT KRUSHNOOR TQ. NAIGAON DIST. NANDED
Providing Solar Power 2 KW at SWM ProjectUlu-I PS
Supply and installation of solar power grid at kaleswar gp
INSTALLATION AND COMMISIONING OF 25KWP GRID TIED SOLAR POWER SYSTEM
Procurement and Installation of 3 X 100KWp Solar Power System
SITC of Solar Power Generation Facility at FFDC Kannauj (U.P.)
6 sqmm Cu EBXL XLPO cable for solar power plants
Solar Based Home Systems (Solar Power Packs): DC Models as per MNRE Specifications (Q3)
TOTAL 30 KW CAPACITY GRID-CONNECTED SOLAR PV POWER PLANT AND 65 KW CAPACITY GRID-CONNECTED SOLAR PV POWER PLANT WITH BATTERY BACK-UP UNDER ROOF-TOP NET METERING SYSTEM AT 4 DIFFERENT LOCATIONS UNDER SOCIAL WELFARE DEPARTMENT, GADCHIROLI DIST
Facility Management Services - LumpSum Based - Operation and Maintenance of 20 MW Solar PV Plant at NTPC Jhanor Gandhar Gas power Plant; Operation and Maintenance of 20 MW Solar PV Plant at NTPC Jhanor Gandhar Gas power Plant; Consumables to be provi..
Design, manufacture, supply, erection, testing, commissioning of grid connected Solar Photovoltaic Power Plants on turn-key basis as per DNIeT
Development and Installation of Solar Plant at Zariat Dingi Cheer.
SITC of SCCTV system for solar plant area in Vijayawada
Necessary Arrangement for Providing Solar Plant to Block Panchayat Building
Repairing of 53 kWP solar plant at CPMG campus, Lucknow
Supply of OPC software for Solar plant at NTPC Faridabad
INSTALATION OF SOLAR PLANT (5KVA OFF GRID ) AT G.P. OFFICE
S.I.T.C. of Roof Top Solar Plant on Grid dashamesh plaza
Installation of 12.50KV Solar Plant in krishi vigyan kendra Hathras
Installation of Roof Top Solar Plant (142kWP) in KUFOS Campus
PROVIDING ADDITIONAL 33KV HT SWITCH YARD AT 1MW SOLAR PLANT.
P/Fixing solar plant at different parks in MC Rajpura
Providing Fixing LED Street Light 10 KW Solar Plant In
Procurement of 33KV CT for Solar Plant, RG-3 Area
REPAIR OF SOLAR PLANT AT SV STATIONS OF BPCL VADINAR
Grid Connected Rooftop Solar plant for PHBPL-Paradip and Balasore
Repair/ maintenance of 2MW Solar Plant at INS Valsura, Jamnagar
Supplying installing and testing solar plant under municipal council gadchandur
O and M OF 10MWp SOLAR PLANT OF TSTPS KANIHA
PROVIDING ADDITIONAL 33KV HT SWITCH YARD AT 1MW SOLAR PLANT
Raising of Road side Plantation Nagur cross - Nagur Solar Plant
Procurement of UPS for 10MW Solar Plant For Talcher Kaniha.
SITC OF SOLAR PLANT AT PUSHKARNA GIRLS HOSTEL (Electrical work)
Up-gradation & Maintenance of 850 KW on grid Solar Plant
PROVISION OF SOLAR POWER GENERATION PLANT AT AFA HYDERABAD
Providing, Erecting and Commissioning Solar Systems under Energy saving at PCMC Building G Zone in Pimpri Prabhag no. 21.
30 KWp ON GRID SOLAR SYSTEM, Additional PV Modules minimum 540Wp
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant