Loading…
Loading…
1,39,790 results • Best match
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
SITC of Grid interactive Roof Top Solar power generation system in CPWD colony, sector-6 D, Gandhinagar. Subwork/Packages: SITC of Solar PV plan
Customised Solar Power Unit, Solar Power Controller Unit, Customised Diesel Generator, Customised Battery Bank, Customised Wind Power Unit, Inverter and Microprocessor, Labour charges
Facility Management Services - LumpSum Based - As per SCC- T; 9030C25D03 1 MW solar power plant Admin Building Cable trench cleaning Fixed Part Item No 00010; Consumables to be provided by service provider (inclusive in contract cost), Facility ... MW solar power plant Admin ...
Construction of 33 Switching Ss at village Dhari 33 KV Reetakhal Road Satpuli for 1.08 MWP Solar Ureda Scheme Construction 33 KV line at vill Dhari Rethakhal Road Satpuli for grid connectivity of solar power plant under EDD Pauri Garhwal
Estimate No. 367/EE/AMT/2021_22, Providing Solar Water Heater, Roof Top Solar Power Plant, CCTV Camera, D.G. Set, L.A., Lan Wan Wiring, EPABX, Sound, Paging, Video Conference System and Water Pump Sets to Proposed 200 Beded Women Hospital at AMRAVAT
Supplying Installation Testing and Commissioning of 25kwp Off Grid solar power plant at 22 BOPs H M Para39 BN Bhim Biswas Jenaraipara FWD B R Para Wansapara D P Para J C Para FWD Kareena Sikander 138 BN Pushparampara New Sewarampara
Replacement of faulty solar modules with new 560Wp or above rating Solar PV modules for a capacity of about 300kW at 3MW Yapaladinni Solar PV Plant, Raichur Dist. including buyback of released faulty modules
Providing Solar Power Pack Material at Nagzari.
Solar power pack with Solar panel (Q3), Solar Street Lighting System (NTPC) (Q3)
Dismantling shifting reinstallation of 315KWP on grid connected roof top solar power plant of Jackson make and maintenace of the system at RPKV school sch B President Estate New Delhi Subwork/Packages: Repairing of existing system installed in various units
Supply, installation and commissioning of Solar PV Maintenance Training Laboratory and Solar Pump Design Set up.
Supply and Installation of Solar Street Lights by Solar PV Module System for Rangpoo, Kalimpong ,G.T.A.
Assets Insurance Service - Standard Fire and Special Peril Policy and Standard Burglary Policy for Raghanesda Phase II 100MW Solar PV Power Plant; Theft/Burglary Cover; Optional
Supply Erection Commissioning of Perc Monocrystiline Solar PV Module Panel of 20 KW and 05 KW capacity
ERECTION AND COMMISSIONING OF 23KM HANGING SOLAR POWER FENCING AND 7KM SOLAR POWER FENCING
Solar Power Plant (Roof Top) for ONGRID System, Single Phase (Q3) MSE Exemption for Years Of Experience Yes | Complete Startup Exemption for Years Of Experience Yes | Complete Document required from seller Experience Criteria, Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 4 Bid Number : GEM/2025/B/6836560 Dated : 30-10-2025 Bid Document 1/11 Number of Auto Extension count 3 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 5 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 686000 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 13720 ePBG Detail Advisory Bank ICICI (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 14 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : AGM Kanhan Area Bank guarantee details Western Coalfields Limited, AGM office Kanhan Area PO- Dungaria Distt.- Chindwara (Madhya Pradesh) 480553 Name of beneficiary and details Name - Western Coalfields Limited, Kanhan Area 2/11 Area- Kanhan Area Bank A/c No/Cust ID of beneficiary - 3085 0500 0297 ICICI Bank Ltd, C/o Anandi Complex, in front of Tehsil office, Junnordeo Road Parasia, Disst : Chhindwara (M.P.) IFSC code- ICIC0003285 Bank Manager Name & Ph no: ANJUMHUSSAIN Ph n: +91-7869964086 BG ADVISING MESSAGE – 760COV/767COV via SFMS Field Number -Particulars 7035 - ICICI0003285 7037- WCL556737160 (Western Coalfield Limited)
Design, manufacture, supply, erection, testing and commissioning of Solar PV Power Plants on turn-key basis as per DNIeT
Design, manufacture, supply, erection, testing and commissioning of Solar PV Power Plants on turn-key basis as per DNIeT
Setting-up of 4.0 MW Ground Mounted Grid Connected Solar PV Plants near Bhatwari District- Uttarkashi, Uttarakhand
INSTALLATION OF SOLAR ENERGY SYSTEM(HYBRID) AT MATIGARA II GP OFFICE AT MATIGARA-II GRAM PANCHAYAT MATIGARA UNDER MATIGARA BLOCK SILIGURI DIST DARJEELING
Restoration works of MMS superstructure at GACL 15MW SPV Project, Charanka, Gujarat
Solar Power Security Light With Pole
1000060524 CHARGE CONTROLLER FOR SOLAR POWER
Solar Power System at IX samsad
Surveillance CCTV Camera Solar Power Based
FD SOLAR POWER SYSTEM 30KVA CAPACITY
PORTABLE SOLAR POWER GENERATOR 500W (Q3)
Solar power Drip Irrigation System (Q3)
Solar Power System at G.P Office
Alternate solar Power Sysptem At GP
Solar Power Project of Ladakh Police.
SOLAR POWER PLANTS AT HPCL LOCATIONS
SOLAR POWER BACKUP WITH Curd Percolator