Loading…
Loading…
68 results • Best match
CONSTRUTION OF RCC DRAIN AND ELECTRIC POLE FROM KALLI KARIGAR HOUSE TO KUSUM AHIRWAR HOUSE AT WARD NO 01 IN NAGAR PARISHAD AJAYGARH DISTT PANNA M.P.
Supply and Installation of 3 HP Solar Pump and 20 Watt Solar Light in Nagarvan Area in front of Katni Girls College
Construction of Helipad at Govt. Kusum College, Seoni Malwa. 1st Call, PAC Rs. 10.05 Lacs on Road and Bridge SOR 25.03.2022 (Ammendment upto date), Completion period 90 days.
Construction of CC road and drain from Bharat Thakur to Kusum Bai and construction of CC road from Kherapati Mata Temple to Community Hall in Subhash Nagar ward, Sagar
Ward 17 kusum kunj colony sthit kankeshwari dukan se lekar hardwaj ji ke makan tak evam durgesh ji ke makan se lekar malviya ji ke makan tak c.c.road nirman kary
Construction of Kusum Kheda To Sultan Nagar Road Length 4.55 Km. PAC Rs. 512.47 Lacs First Call on Road and Bridge wef SOR 25-03-2022 work period 365 days
Construction of Auditorium at Govt. Kusum College, Seoni Malwa in college campus. (Balance work) 5th Call, PAC Rs. 31.78 Lacs on Building SOR 01.08.2014 (Ammendment upto date), Completion period 180 days.
Construction of CC Road Work at Gabbar Kirana, Bhandari Baba, Kusum Verma, Jaroliya, Rajendra Gotam to Shruti vihar, Sanjay Mourya School to Pachwar Ward No.23 Zone 10.File No.332/23X3/6.
Construction of C.C. Road from Gupta Kirana, passing by Parikh house and Kusum Sharma house, and leading towards Advocate Rohit Nema housein Swami Vivekananda Ward, under Division No. 02, Kachhpura. (CM MONIT A plus)
PRIVIDING AND FIXING OF PAVER BLOCK AT E3 KUSUM PARK, AND REPAIRING OF GYM AND INFRONT OF E-564 PARK PROVIDING AND FIXING OF OPEN GYM AND E4 VARISHTH NAGRIK MANDAL PAINTING WORK WARD 45 ZONE 10 (PARSHAD NIDHI )
Construction of CC Top Layer frm Sapna singh house to Bichchna road kusum house to lala house chaitu kol house to sbi bank Jyoti singh house to munni house, samresh house to santosh jarha shop, Behind GM bungle to pani tanki, around krishnacolony wn3
SOLAR WATER PUMPING SYSTEM 7.5 AND 5 HP SOLAR STREET LIGHT 20, 24, AND 30 WATT
Installation of Solar Pump Set at Cattle Breeding Farm, Kiratpur Itarsi (M.P)
Installation Of Solar Pump Set at NKBC, Cattle Breeding Farm, Kiratpur, Itarsi MP
providing laying and jointing new sewer line along with dismanttling of old sewer line from kusum jain girls hostel indrapuri, c sector, ward-67, zone-15
Piperine, Argemone oil, Castor oil, Curcumin, Mineral oil, NEEM OIL, Standard Tricresyl phosphate, sodium carbonate, Dextrose, potassium dichromate, kusum oil, karanj oil, potassium hydrogen pthalate, FAME37 standard FAME mix, methyl undecanoate, nil item
Design, EPC Contract for development of 8 MW Ground Mounted SPV Plant at Sanchi, Dist. Raisen, MP incl evacuation arrangement up to DISCOM substation along with 5 Years Comprehensive OandM of plant under KUSUM-C as perRFPinvited by MPUVNL
Design,Supply,Installation,Testing and Commissioning Including Insurance,Wananty,Spare part and 05 years Operation and Maintenance of Solar PV and single phace 3hp DC solar pump, Discharge 45000 liter per day for 75 mtr head as per NIT