Loading…
Loading…
1,917 results • Best match
Repair work of 25 numbers of 16m High Mast Lights at 11 FSDs (Mokama, NRPA, Belouri, Katihar, Chanpatia, Phulwarisharif, Gaya, Buxar, Darbhanga, Jaynagar, Saharsa) under Bihar region
Supply, Installation, Testing and Commissioning of 01 Pic High Mast Light at Nagar Panchayat Birpur (Supaul) at muslim tola between ward no 07 and ward no 11
Construction of Roads, Street Lighting, Borewell, Overhead Water Tank, Transformer at Regional Research and Training Centre (RRTC) of ICAR Central Institute of Fisheries Education, Motipur (Bihar)
Lighting Pole or Post and Hardware - Tubular Street Light Poles (V2) (Q3) MSE Exemption for Years of Experience and Turnover
Repair/maint of security/street light, perimeter lights, timer panel and connected items at Zone A at Mil Stn Gaya
Lighting Pole or Post and Hardware - Tubular Street Light Poles (V2) (Q3) MSE Exemption for Years of Experience and Turnover
Lighting Pole or Post and Hardware - Tubular Street Light Poles (V2) (Q3) MSE Exemption for Years of Experience and Turnover
SITC of Street Light along the approach Road from the Project Entrance Gate to the Agricultural land at CUSB Gaya
Procurement Of Lt Ab Cable Of Size [3c X95(phase)+1c X 70(messanger) + 1c X 16 (street Light)] Sqmm
Lighting Pole or Post and Hardware - Tubular Street Light Poles (V2) (Q3) MSE Exemption for Years of Experience and Turnover
REPAIR MAINT OF STREET LIGHTS SECURITY LIGHT CABLES POLES ALLIED WORKS AND AC PLANT AND CONNECTED ITEMS IN MH SIGNAL CENTRE OF DANAPUR UNDER GE DANAPUR CANTT
ARMO of IEI and Fans and street lights for C.R. Apartment at Cassimetha, Darbhanga House, and ITO flats at Pedder Road, Mumbai. SH- Refilling of Fire Extinguishers.
Supply, Installation and Commissioning of 10nos 12 mtr. Solar High mast lighting set with all the accessories under CSR project of NTPC-MTPC, Kanti for FY 2025-26.
PROVN OF 02 X HIGH MAST LAMP AT MH SPL REPAIR REPLACEMENT OF BER REFRIGERATOR AND PROVN OF CERTAIN MINOR WORK IN AGE EM UNDER GE DANAPUR CANTT
Provision of ladies toilets near DSOI, Guard Rest Room near PJ Gate of RIMC, Electric connection to high mast light and drain of 21 Bihar under GE Dehradun
SUPPLY AND INSTALLATION & FITTING OF COMPLETE JOB OF 20 M HIGH MAST LIGHT ON THE TURN LEADING TO THE MARKET FROM THE EAST BYPASS UNDER NAGAR PANCHAYAT ASTHAWAN.
Design, Supply, Installation, Testing, Commissioning with Comprehensive Maintenance Contract (CMC for 5 Years) including Remote Monitoring System (RMS) of Smart Solar Street Light System on the identified existing Electric pole under M.G.S.S.L Yojana
Installation of LED street lights on electric poles in all 13 wards under Nagar Panchayat Barhariya and maintenance for five years. Total number of lights - 1470 (70 watts)
STREET light for road for Pond Ash transportation from Ash dyke stage 1to Chakiya thana Highway NH-31 through township premises
REPAIR / MAINT OF EXISTING EARTH PITS, LIGHTING CONDUCTOR, STREET LIGHT AND CONNECTED ITEMS AT AF STN DARBHANGA UNDER GE AF BIHTA
providing new GI octagonal street light poled and LED liminairies MV panels in sub station room at ESC Hospital Chikhaltham Aurangabad
SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF ENERGY EFFICIENT LED LIGHTS, HIGH MAST TOWERS AND ALLIED WORKS TO COMPLY LUX LEVEL REQUIREMENT AS PER OISD 149 AT MUZAFFARPUR LPG BP
NIGHTLIT--NIGHTLIT LED Luminaire For Road And Street Lighting Rating - 70 Watt Brand: NIGHTLIT--NIGHTLIT (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687701522611
Supply, installation, testing and commissioning of Solar Street Light, Supply, installation, testing and commissioning of Silent DG Set, Supply, installation, testing and commissioning of Solar High Mast Light
Design, Supply, Installation, Testing, Commissioning with Comprehensive Maintenance Contract (CMC for 5 Years) including Remote Monitoring System (RMS) of Smart Solar Street Light System on the identified existing Electric pole under MGSSLY
REPAIR / MAINT OF PERIMETER SECURITY LIGHT, LT CABLE , STREET LIGHT, EARTH PITS, LIGHTING CONDUCTOR AT AF STN DARBHANGA UNDER GE AF BIHTA.
MOEI and fans RM of water supply pump set i c street light at various residential quarter for Central Excise at Aurangabad
Detailed Estimated of Installaion, Operation and Management of 1175 Street Light in Ward No 01 to 26 Ward Nagar Parishad Banka (Bihar)
Design, Supply, Installation, Testing, Commissioning with Comprehensive Maintenance Contract (CMC for 5 Years) including Remote Monitoring System (RMS) of Smart Solar Street Light System on the identified existing Electric pole under M.G.S.S.L Yojana
REPAIR MAINT OF LT FP JBs POLE BOX APFC PANELS VOLTAGE STABILIZER HIGH MAST AREA LIGHTING PUMP HOUSE POWER HOUSE STORE OF EM INSTALLATION AT DANAPUR UNDER GE DANAPUR CANTT
High Mast Lighting Octagonal Tower with Solar Based LED Street Light (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Past Performance, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2026/B/7113618 Dated : 15-01-2026 Bid Document 1/6, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Past Performance 80 % Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 11 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
High Mast Lighting Octagonal Tower with Solar Based LED Street Light (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Past Performance, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2026/B/7113619 Dated : 15-01-2026 Bid Document 1/6, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Past Performance 80 % Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 11 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
High Mast Lighting Tower for large area with LED Flood Lighting System (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
High Mast Lighting Tower for large area with LED Flood Lighting System (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Providing Provision of Lighting in newly developed Goods Yard at Sirari Rly.Station with 20 M High Mast Towers in Kiul-Gaya Section Doubling Project with Electrification in Danapur Division of ECR
High Mast Lighting Tower for large area with LED Flood Lighting System (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
High Mast Lighting Tower for large area with LED Flood Lighting System (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
High Mast Lighting Tower for large area with LED Flood Lighting System (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
High Mast Lighting Tower for large area with LED Flood Lighting System (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
High Mast Lighting Tower for large area with LED Flood Lighting System (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
High Mast Lighting Tower for large area with LED Flood Lighting System (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
High Mast Lighting Tower for large area with LED Flood Lighting System (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
High Mast Lighting Tower for large area with LED Flood Lighting System (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
PROVN OF 03 HIGH MAST LAMPS IN TRG AREA OF BRC DANAPUR AND UPGRADATION OF EXTERNAL ELECTRIC SUPPLY AT ALBERT EKKA ROAD KR ENCLAVE AND CONNECTED AREA UNDER GE DANAPUR CANTT
High Mast Lighting Tower for large area with LED Flood Lighting System (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
High Mast Lighting Tower for large area with LED Flood Lighting System (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
High Mast Lighting Tower for large area with LED Flood Lighting System (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
High Mast Lighting Tower for large area with LED Flood Lighting System (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
High Mast Lighting Tower for large area with LED Flood Lighting System (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
High Mast Lighting Tower for large area with LED Flood Lighting System (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No