Loading…
Loading…
4,066 results • Best match
LED Luminaire (for Flood Light), LED Luminaire (For Road and Street Lights) Average Turnover (Last 3 Years) 1 Lakh (s)
Construction of Permanent campus of Central University of Gujarat at Village Kundhela, Dist: Vadodara, Gujarat (Phase-1 Package-III). SH:- C/o Front Boundary wall along with Grill, Gate, Shikhar and Guard Room, Miscellaneous finishing works in ... like street lights , ...
LED WELLGLASS, TUBE LIGHT FITTING, LED STREET LIGHT, LED MIDBAY BOQ Title BOQ ITEM
ARMO of Electrical and mechanical installation and services in CGST and Income tax and Resdl building under AE-E, Surat, Gujarat FY 2023-24 SH- As and when required basis providing LED fixtures street light post top lantern exhaust fan, etc for a residential building of CGST and Income tax
Repair/maintenance to RTU system used for operation of street light at AF Stn Bhuj
Operation and Maintenance Of Electrical Systems/Electrical Installations - PROVIDING, ERECTING & INSTALLATION OF STREET LIGHT POLES
Led Flood Light (Q3), Led Luminaire (For Road And Street Lights)-IS:10322, IS: 16107, IS:16108, IS: 16103, IS:10322 (Q3)
Vadodara Division: Electrical works in connection with replacement of corroded street light poles, improvement of flooring, shed, road, surrounding areas, toilet, bathroom, pit line, slabs etc at CCC, PRTN, improvement of illumination at MEMU Shed, Vadodara Yard and interlocking LC gates having ATVU above 10,000 in ANND - CBY and DB - ARPR sections.
Supply, Installation, Testing and Commissioning of 25 mtr High Mast suitable for 50m/sec wind speed along with luminaries at CW-Pipavav, Gujarat.
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Gujarat Council of Science City; High Mast Pole for Flood Light; Service Provider
Solar Street Lighting System (NTPC) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Turnover Yes Document required from seller Experience Criteria, Past Performance, Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Past Performance 80 % Bid to RA enabled No Type of Bid Two Packet Bid Bid Number : GEM/2025/B/6221505 Dated : 11-06-2025 Bid Document 1/6 Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 1050000 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 31500 ePBG Detail Required No (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : Adijati Vikas Adhikari, Dang - Ahwa Adijati Vikas Adhikari ni Kacheri, Collector Office Compound, Ahwa, Dist. - Dang - 394710 (Adijati Vikas Adhikari, Dang - Ahwa) Splitting
Development of Faculty/Staff Housing with Associated Facilities under Phase-2A. SH Construction of Faculty & Staff Housing consisting of 150 units of Type-B and 32 units of Type-D qtrs. Stilt Area including internal EI internal services firefighting ... CCTV Street lighting Overhead ...
Octagonal Pole (V2) (Q3), LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3) (3 (3 ))
Octagonal Pole (V2) (Q3), LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3) (3 (3 ))
Octagonal Pole (V2) (Q3), LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3) (3 (3 ))
Octagonal Pole (V2) (Q3), LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3) (3 (3 ))
Led Flood Light (Q3), Lighting Pole or Post and Hardware - Tubular Street Light Poles (V2) (Q3)
Led Flood Light (Q3), Lighting Pole or Post and Hardware - Tubular Street Light Poles (V2) (Q3)
Electric Cabling Service - PROVIDING, ERECTING & INSTALLATION OF STREET LIGHT POLES AT DHARAMPUR NAGARPALIKA AREA; DHARAMPUR; VALSAD
As per BOQ
High Mast Lighting Octagonal Tower for Small area with LED Flood Lighting System (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Turnover Yes | Complete Document required from seller Experience Criteria, Bidder ... category High Mast Lighting ...
High Mast Lighting Octagonal Tower for Small area with LED Flood Lighting System (V2) (Q2) MSE Exemption for Turnover Yes | Complete Startup Exemption for Turnover Yes | Complete Document required from seller Experience Criteria, Past Performance, ... category High Mast Lighting ...
High Mast Lighting Octagonal Tower for Small area with LED Flood Lighting System (V2) (Q2) MSE Relaxation for Turnover Yes | Complete Startup Relaxation for Turnover Yes | Complete Document required from seller Experience Criteria, Past Performance, ... category High Mast Lighting ...
Solar Street Lighting System (NTPC) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Turnover Yes Document required from seller Experience Criteria, Past Performance, Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Do you want to show documents uploaded by bidders to all bidders participated in bid? No Past Performance 50 % Bid to RA enabled No Type of Bid Two Packet Bid Bid Number ( ) : GEM/2025/B/6266208 Dated : 23-05-2025 Bid Document 1/8 Time allowed for Technical Clarifications during technical evaluation 2 Days Inspection Required (By Empanelled Inspection Authority/Agencies pre- registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 45000 ePBG Detail Advisory Bank State Bank of India ePBG Percentage(%) (%) 5.00 Duration of ePBG required (Months) ( ) . 14 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b). EMD & Performance security should be in favour of Beneficiary, wherever it is applicable., Beneficiary : EX.ENG. D.P.R. AND B. DIVISION, AHWA Office of the Executive Engineer, R & B Department, District Panchayat Dang, Ahwa, Circuit House Road, Road and Building Department, Dang, 394710, Gujarat (Ex.eng. D.p.r. And B, Division, Ahwa) MII Purchase Preference MII Purchase Preference Yes 2/8 MSE Purchase Preference MSE Purchase Preference Yes 1. If the bidder is a DPIIT registered Startup, the bidder shall be exempted from the the eligibility criteria of "Bidder Turnover" as defined above subject to their meeting of quality and technical specifications. If the bidder is DPIIT Registered OEM of the offered products, it would be exempted from the "
White - LED Based Solar Street Lighting System (Q3) MSE Relaxation for Turnover Yes | Complete Startup Relaxation for Turnover Yes | Complete Document required from seller Experience Criteria, Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate, OEM Annual Turnover, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 5 Bid Number : GEM/2025/B/7005226 Dated : 15-12-2025 Bid Document 1/8 Number of Auto Extension count 1 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 55500 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 2 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and 2/8 Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : TALUKA DEVLOPMENT OFFICER Ahmedabad, Panchayats and Rural Housing Department Gujarat, Ahmedabad District Panchayat, (Tdo Sanand)
High Mast Lighting Octagonal Tower for Small area with LED Flood Lighting System (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Turnover Yes Document required from seller Experience Criteria, Bidder Turnover, ... category High Mast Lighting ...
High Mast Lighting Octagonal Tower for Small area with LED Flood Lighting System (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Turnover Yes Document required from seller Experience Criteria, Bidder Turnover, ... category High Mast Lighting ...
REP/MAINT OF EXT ELECT HIGHMAST LIGHT SOLAR OPTD PERIMETER LIGHT INT STREET LGT, WS PIPELINE INCL VALVE PUMP MTR RO PLANT PKG PRCN PLANT VRF SYSTEM UNSV SUMMER APLNS AC REFG WATER COOLAR DEEP FRZR AND CRT OTHER CONNECTED WKS AT KHAM DWARKA UND GE2
As per BOQ
1) MOEI and fans R M of 315 KVA substation equipment ac unit DG set pump set for office cum lab building at the directorate of MAP Boriavi and Residential at lambhel 2) MOEI and fans RM of pump set street lights etc at offices under SE Vadodara SH- Comprehensive maintenance of split cassette type mounted type air conditioning units at office bldg Boriavi and Vadodara CPWD Offices
Solar Water Heating System as per IS 12976:1990 (Q3), Solar Street Lighting System (NTPC) (Q3) MSE Exemption for Years of Experience and Turnover
Part A) Consultancy Service for planning & Designing of Sewerage, Water supply, Storm Water Drain, Rain Water harvesting, Footpath, Road Street light, Landscaping, Sewage Treatment plant for ICMR - National Institute of Occupational Health, Meghaninagar, Ahmedabad. Part B) Consultancy service for planning & Designing of Renovation and upgradation of Auditorium for IGTR, Industries Road, Phase-IV, Vatva, Ahmedabad, Gujarat.
LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate ... and Street Lights (V2) ...
LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Minimum number of bids required to disable ... and Street Lights (V2) ...
Providing, Supply, Installation, Testing & Commissioning of Highmast Tower at various location at L (Q3)
White - LED Based Solar Street Lighting System (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Turnover Yes | Complete Document required from seller Experience Criteria, Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate, OEM Annual Turnover, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2025/B/6600694 Dated : 22-08-2025 Bid Document 1/7, -- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 39000 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 2 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : PADRA TALUKA PANCHAYAT PADARA TALUKA PANCHAYAT, Department of Panchayati Raj, VADODARA District Panchayats, 2/7 (Tdo Padra) Splitting
LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Bid Number : GEM/2025/B/6495892 Dated : 25-07-2025 Bid Document 1/5 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2025/B/6285589 Dated : 15-06-2025 Bid Document 1/5 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2025/B/6294567 Dated : 13-06-2025 Bid Document 1/5 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2025/B/6297571 Dated : 05-06-2025 Bid Document 1/5 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2025/B/6297590 Dated : 07-06-2025 Bid Document 1/5 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2025/B/6285585 Dated : 15-06-2025 Bid Document 1/5 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Octagonal Pole (V2) (Q3), LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II) (Q2) (3 (3 ))
Octagonal Pole (V2) (Q3), LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II) (Q2) (3 (3 ))
Octagonal Pole (V2) (Q3), LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II) (Q2) (3 (3 ))
Octagonal Pole (V2) (Q3), LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II) (Q2) (3 (3 ))
Octagonal Pole (V2) (Q3), LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II) (Q2) (3 (3 ))
Octagonal Pole (V2) (Q3), LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II) (Q2) (3 (3 ))
Octagonal Pole (V2) (Q3), LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II) (Q2) (3 (3 ))
Octagonal Pole (V2) (Q3), LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II) (Q2) (3 (3 ))