Loading…
Loading…
3,134 results • Best match
Procurement Supply and Installation of 9 meter 10 meter and 12 meter Ladder Type and Motorized High Mast Lighting Systems for Hennagara Gram Panchayat FY 2026 27
LED Luminaire (for Flood Light) ( PAC Only ), lighting pole or post and hardware- tubular street light poles ( PAC Only )
Annual maintenance and Repairs of street lights, Dome Lights and UG Cable to Old and New Guest House Premises in Kalaburagi (2025-26) And Annual Maintenance, Repairs of Electrical works & Electrical fittings and Other Electrical Accessories at Afzalpur Guest House in Afzalpur Taluka And Annual Maintenance & Repairs of Electrical works and Electrical fittings at Deval Ganagapur in Afzalpur Taluka Under Head of Account 2059 for the year 2025-26 (Work Reserved for ST Category)
Operation and maintenance of General facility and security at Admin and TA buildings, NATGRID, near STS BSF Road, Bangalore for the year 2025- 26. SH: 1 General upkeeping of various E and M services including street lights, AC units, Substation equipment, Water supply pumpset, DG set, 30 KLD STP, Perimeter CCTV, power fence and other Security systems etc . SH: 2 : Civil day to day maintenance and repairs for all the buildings in NATGRID Campus.
Providing & Servicing of ACs , UPS , Batteries And Annual Electrical Maintenance & Repairs to Street lights , Water Pumps systems and other Essential Electrical works in Judges Quarters , Executive Engineer Quarters and PWD Staff Quarters in Raichur tq , Sindhanur tq , Manvi tq , Lingasugur tq , Devadurga tq , Sirwar town and Maski town (Works Executed and Completed in the year 2024-25 & 2025-26) in Raichur District Under the Head of Account 2216 for the year 2025-26
High Mast Lighting Tower for large area with LED Flood Lighting System (Q3) MSE Relaxation for Years Of Experience Yes | Complete Startup Relaxation for Years Of Experience Yes | Complete Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Bid to RA enabled No RCM Applicable Yes Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2025/B/7033194 Dated : 22-12-2025 Bid Document 1/9 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 1500000 Payment Timelines Payments shall be made to the Seller within 11 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Providing Annual Maintenance-Repair works to Generators, Repairs to EPABX Telephone System, Painting to Transformer Center and Chimney, Street light poles etc., along with Skilled & Unskilled Manpower for Day to Day Routine Operations of (a) Internal Electrification -(b)External Electrification, (c) CCTV System, (D) Solar Power Generation System, (E) EPBAX Telephone System at Suvarna Vidhana Soudha, Belagavi for the year 2025-26.
Providing and Annual Electrical Maintenance, Repairs to DG Set, UPS, Batteries, Street Light, Water Pumps System and Other Essentia Electrical Works in District Court Complex Buildings, IIIrd Addl. Court, Family Court, Consumer Court in Raichur Taluka Civil Court Buildings in Lingasugur Taluka, Devadurga Taluka, Sindhanur Taluka and manvi Taluka in Raichur District Under Head of Account 2059 for the year 2025-26.
Providing LED Lights, Timer machine, Separate Street light electric line and related works to Electrical poles in SC Colonies 1)Hampasagara-01-10, 2)Hampasagara-02-62, 3)Enigibasapura-5, 4)Enigi-9, 5)Gaddikeri-14, 6)Nagalapura thanda-26, 7)Morageri-28, 8)Sonna-25, 9)G Kodihalli-8, villages in Huvinahadagali constituency, Hagaribommanahalli Taluk.(KKRDB FOR THE YEAR 2024-25)
Providing and Fixing of High Mast lights in 1) Gonawatla tanda 2) khairavadagi 3) Nagalapura 4) Chattara 5) Chittapura 6) Sajjalagudda 7) Nagarahala 8) Pulabhavi 9) Gudadnala 10)Yaradona 11) Honnalli 12) Devarabhupura 13) Guragunta 14) Gejjalaghatta 15) Bandebhavi 16) Kachapura 17) Navali 18) Anvari 19) Idanala 20) Goudooru 21) Jawooru in each Village 3 and total 63 Hightmast lights In Lingasugur Taluka Of Raichur District. Under KKRDB MICRO General (RCH251922362) for the year 2025-26.
Installing interlock pavers on both sides of the road from Sarfaraz Jalligeri house to Azim Mulla house 2. Installing mini high-mast lights in Kuratti Peth, Kuratti Farm, and various other areas. 3. Developing Alfatha Youth Association building. 4. Developing the building Alai Devras Majjid in Bhoregar Lane. 5. Developing the Imam Hussain Prayer Hall. 6. Installing interlock pavers from Shirahatti house to Hulappa Palled house, and from Shahbaz house to Maaldaar house At Ward No 10
Procurement of 9meter,10meter,12meter Ladder Type and Motorized Highmast Lights for K Gollahalli Grama panchyath
Procuremnt of Electrical Items,Highmast items and other required materials for the year of 2026-27
Supply and Erection of Highmast Light in 1. Shanshinagar Dod masijid, 2. Wad no. 32 Rahmathnagar tarza dilwala darga, 3. ward no 31 Rahmathnagar masijid Axa compound, 4. ward no. 30 Illal Masijid noor nagar, 5. Gandhinagar, 6. mochicolony,7. Petechmanahalli, 8 Viranjaneya Nagar 2nd Stage and 9.Beedi Colony of Kolar Town
Construction of 40kA temperature rise facility building at HPL CPRI campus Banglore Subwork/Packages: Providing street light cabling and associated works
Appointment of Independent charted engineering agency (out sourced basis) for implementation of energy efficiency project for streetlights by centralized control and monitoring system(CCMS) in Kolar DUDC.
Panchayath Requirements
Extension of electrical lines from 33KV substation to Residential area with UG cabling at NITK Surathkal. SH: Supplying, Installation, Testing and commissioning of 11KV HV panel, 11KV load break switch panels, Transformers, Out door type feeder ... meters, street lighting , ...
Design and Construction of 14 Nos. Type V Quarters G plus 3 floors for Central University of Karnataka at Kalaburagi, Karnataka including Internal water supply, Sanitary installations, Drainage, Overhead terrace tanks, rain water harvesting, internal ... Panel, street lighting and ...
AS PER BOQ AND TENDER DOCUMENT
Solar Street Lighting System (NTPC) (Q3) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Experience Criteria, Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6481218 Dated : 22-07-2025 Bid Document 1/11, -- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination ITC available to buyer Yes RCM Applicable Yes Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Post Dispatch Name of the Empanelled Inspection Agency/Authority HAL (QC) Auto CRAC Days 60 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 20000 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 3.00 ( ) Duration of ePBG required (Months). 14 2/11 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : OVERHAUL DIVISION, CPC Overhaul Division, Hindustan Aeronautics Limited, Vimanapura Post, Bangalore, 560017. (Overhaul Division, Cpc) Splitting
Roads and Drains and Other Works
Detailed Project report for improvement of building works at Madanayakanahalli CMC in Bangalore Urban District Detailed Project report for improvement of bui1)construction of work of handicapped toilet in chikkabidarakallu, Bhimeswara nagar ... of street lights on ...
Upgradation of Eklavya Model Residential school (EMRS) at Bajjanahalli, Tumkur, District Karnataka. C/o 06 Nos. Class Rooms,1 Office Room and 1 Library icluding internal water supply, sanitary installation, electrical installations, drainage, ... octagonal street light poles.
Estimate for providing Skilled and Unskilled for operation of Day to Day attending complaints and annual Maintenance of Electrical installation such has Switches, Sockets, Modular Plates, Modular PVC boxes, LED tubes, Drivers, Fans, Geysers, ... system, street lights , ...
Providing LED Lights, Timer machine, Separate Street light electric line and related works to Electrical poles in 1. K Veerapura-23, 2. Manvihalli-06, 3. Budanuru-15, 4.Holalu-23, 5. Chikka Kolachi-30, 6.Hiremallanakeri-21, 7.Mylara-25, 8. Koyilaragatti-15, 9. Hagaranuru-15, 10.Halthimlapura-10, 11.Kombli-15, 12. Navali-25, 13. Magala-20, 14. Hyarada-20, 15. Hirehadagali-52, 16. Adavimallanakere-11. 17. Talakallu-10, 18. Uttangi-10, 19. Sogi-10, 20. Sovenahalli-10, 21.Nandihalli-10, 22. Kenchamanahalli-10, 23. Tippapura-10, 24. Upanayakanahalli-10, 25. Shivalinganaalli-10, 26. Naduvinahalli-11, villages in Huvinahadagali Taluk(HOA KKRDB FOR THE YEAR 2024-25)
Construction of CC drain from Gangadhar Hoogar house via Kori house up to Kotagi house, Nalwad Oni from Kattimani house to Matti house, Lakkundi house via Goudar house up to Annigeri house.Sankanagoudar house to Karugall house in Karugalla Oni, and ... Mini High -Mast ... High- Mast lights ...
Installation of new tiles on the entire hostel floor repair of all doors and windows, construction of a wall in the storeroom. Repair of the inner wall of the 01st floor of the hostel installation of 03 tiles installation of 01 solar high mast in the hostel premises construction of a bathroom and 04 toilets upgrading the outer premises grounds of the hostel with red soil at Government Pre-Matric Boys Hostel Nagur village in hungund taluk of bagalkote dist
High Mast Lighting Tower for large area with LED Flood Lighting System (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2025/B/6300182 Dated : 04-06-2025 Bid Document 1/11 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority RITES Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 60 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : Sr. Divisional FInance Manager Second Floor, DRM office Complex, Irwin Road, S W Railway. Mysuru Karnataka 570 001 (Sr.dfm/mys) Splitting
LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6391822 Dated : 27-06-2025 Bid Document 1/7 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Installing Minimast in Polipu Circle in wn9. and Extension of streetlights near Ramanagara new concrete road in wn11. behind Halemarigudi in wn12. and behind al ishan school in wn15. from arif house to ashphak house and from arif house to aslam kaji house. from jahir house to shamsuddin house. and jarandaya road in wn12. near mallar Wajeed Gudde Keri Firoz house and Pakirnakatte Maninetri and Girija house in wn22. from Adil house to Rashid house in wn23
Self Ballasted LED Lamps for General Lighting Service as per IS - 16102 (Q2), Led Luminaire (For Road And Street Lights)-IS:10322, IS: 16107, IS:16108, IS: 16103, IS:10322 (Q3)
LED Batten (Q2), Led Luminaire (For Flood Light)-IS:10322, IS:16107 (Q3), Led Luminaire (For Road And Street Lights)- IS:10322, IS: 16107, IS:16108, IS: 16103, IS:10322 (Q3)
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Supply and Maintenance of 50W AC street lights in Cheeluru Gram Panchayat limits Yadavanahalli Hanumanthanagar Hanumanahalli Road Jakkasandra Devarakaggalahalli Dodda Ku..
Project Management Consultancy Services Including Supervision, Monitoring, Quality Control and Preparation of Bill for the works Providing Energy Efficient LED Street lights and its accessories to Kadugodi Division and surrounding areas
Project Management Consultancy Services Including Supervision, Monitoring, Quality Control and Preparation of Bill for the works Providing Energy Efficient LED Street lights and its accessories to Marathalli Division and surrounding areas
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Supply and Maintenance of 50W AC street lights in Cheeluru Gram Panchayat limits Maruthinagar Cheeluru Doddakurubarahalli Jakkasandra Vaderahalli Colony Yadavanahalli H..
Procurement of 9 to 12 Meter Highmast as per the detailed technical spec uploaded in the kppp Portal
Maintenance and operation of E&M services for Residential and Non Residential Buildings at MET office , Bangalore. Subwork/Packages: Repairs to Street Light
Construction of Cement Concrete Road White Topping, Storm water drain, Entrance Gate, Street light work for Road and Allied Work for DOC, Davanagere
LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 2, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6741178 Dated : 13-10-2025 Bid Document 1/7 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6389973 Dated : 27-06-2025 Bid Document 1/8 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority RITES Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6390074 Dated : 27-06-2025 Bid Document 1/8 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority RITES Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
LED Luminaire (for Flood Light) as per IS 10322, IS 16107 (Q3), LED Luminaire (for Road and Street Lights) as per IS 10322, IS 16107, IS 16108, IS 16103, IS 10322 (Q3)
Led Luminaire (For Flood Light)-IS:10322, IS:16107 (Q3), Led Flood Light (Q3), Led Luminaire (For Road And Street Lights)-IS:10322, IS: 16107, IS:16108, IS: 16103, IS:10322 (Q3)
Project Management Consultancy Services Including Supervision, Monitoring, Quality Control and Preparation of Bill for the works Providing Energy Efficient LED Street lights and its accessories to Horamavu Division and HAL Airport Division
350 W LED FITTING FOR HLMS SUITABLE FOR REPLACEMENT OF 2* 400 W HPSV FITTING, 45W, 240VAC, 50HZ, IP66 LED STREET LIGHT WITH INTERNAL DRIVER, SUITABLE FOR OUTDOOR INSTALLATION. POWDER, STREET LIGHT LED FITTING, 100W, AC, 240V, 50HZ. IP66, SUITABLE TO MOUNT ON PIPE, BUILT WITH TOUGHENED, LED FLOOD LIGHT FIXTURE (WP) 200W MAX
Annual maintenance (civil works) of the bungalows of the Hon ble Judges, Additional Registrar Generals Quarters and staff Quarters in the premises of the High Court Dharwad Bench, Dharwad. and annual Electical maintenance of 10 number of judges ... PANs, street lights around ...
Providing LED Lights, Timer machine, Separate Street light electric line and related works to Electrical poles in 1. Basarakodu thanda-27, 2. Magala Thanda-06, 3. Adavimallanakeri thanda-53, 4. Govindapura thanda-01-53, 5. GG thanda-13, 6. Linganayakanahalli thanda-20, 7. Dombarahalli thanda-22, 8. Naduvina thanda-12, 9. Tumbinakeri Dodda thanda-26, 10. Tumbinakeri Sanna thanda-11, 11. Aralihalli thanda-12, 12. Sovinahalli thanda-15, 13. Mudlapura Halethanda-9, 14. Mudlapura Sanna thanda-10, 15. Mudlapura Hosathanda-34, 16. Ankli thanda -34 , 17.KK thanda-90, 18. KM thanda-186, 19. Banyana thanda-24 , villages in Huvinahadagali Taluk(HOA KKRDB FOR THE YEAR 2024-25)
REPAIRS AND MAINTENANCE OF GATE BARRIERS,HANGAR BAY LIGHTS,SUN SHELTER,SHUTTER MOTORS, HIGH MAST LIGHTS, RECHARGE PITS,MICS SECURITY LIGHTS AND ITS ALLIED WORKS AT SDI AND ASTE UNDER GE (AF) MARATHAHALLI