Loading…
Loading…
654 results • Best match
ARC FOR OPERATION AND MAINTENANCE OF (I) 500KVA, GENERATORS (II) SUBSTATIONS 33 11 KV II) FEEDER PILLAR BOXES (IV) INDOOR PANELS (V) STREET LIGHT AND BUILDING SECURITY LAMPS (VI)WATER PUMPS WHEEL VALVES AT VARIOUS LOCATIONS etc.
Electrical Up-Gradation of transformer, D.G Set, Electrical Panels
Construction of additional 33kV Bay and Switchyard renovation work to provide power supply to the Chief Engineer(PL-Operation),Pump-Station-6, ITI Road, W/no -10, Holding No. 36, Oil India Limited, Bongaigaon under Bongaigaon ESD-I
Construction of new 33 and 11 KV Substations with construction of new 33 KV Terminal Bays Construction of 33 KV and 11 KV lines for Distribution System Enhancement and Loss Reduction in Nagaon and Morigaon Electrical Circle on turnkey basis
Manpower Outsourcing Services - Minimum wage - Skilled; Others; HIHGLY SKILLED FITTER FOR LINE MAINT, Manpower Outsourcing Services - Minimum wage - Skilled; Others; SKILLED FITTER FOR SUBSTATION MAINTE
Supply, Installation, Testing of 11 KV U.G. cable from 33/11 KV substation to existing 04 nos distribution transformer at Central Institute of Technology Kokrajhar
Providing Civil and E & M Bulk Services and Balance Development for the Under Construction 593 Nos. Residential Quarters (529/Type-II, 38/Type-III, 15/Type-IV, 8/Type-V & 3/Type-VI) at GC, CRPF, Dayapur, Silchar, Assam. (SH: Providing water supply ... of Substation , ...
Extension of 11 kV Feeder (2.260 km) from 33/11 kV substation in Plastic Park, Gellapukhuri, Tinsukia under Tinsukia Electrical Sub Division III of Tinsukia Electrical Circle
Extension of 11 kV Feeder (2.470 kms) from 33/11 kV substation in Plastic Park, Gellapukhuri, Tinsukia under Tinsukia Electrical Sub Division III of Tinsukia Electrical Circle
Construction of 11 KV spur line with AAAC Covered Conductor and Installation of 500 KVA Pad Mounted Substation at Dibrugarh University under Dibrugarh ESD I of Dibrugarh EC APDCL
Construction of new 33_11 kV substation with construction of new 33kV Terminal Bays, Construction of 33kV and 11kV lines for Distribution System Enhancement and Loss Reduction in Kokrajhar Electrical Circle on turnkey basis
Construction of new 33_11 kV substation with construction of new 33kV Terminal Bays,Construction of 33kV and 11kV lines for Distribution System Enhancement and Loss Reduction in Rangia Electrical Circle on turnkey basis
Repair and Maintenance of E and M Installations at Silchar Airport. SH-Job contract for E and M Installations at 11 KV Substation and Kumbha Pump House and allied works for the year 2022-24
Construction of new 33_11 kV substation with construction of new 33kV Terminal Bays,Construction of 33kV and 11kV lines for Distribution System Enhancement and Loss Reduction in Bongaigaon and Barpeta Electrical Circles on turnkey basis
Road Work
Providing Civil and E and Bulk Services and balance development for the under construction 593 nos. residential quarters (529/Type-II, 38/Type III, 15/TYPE-IV, 8/Type-V & 3/Type- VI) at GC, CRPF, Dayapur, Assam, (SH(Civil): Providing water supply ... of substation , ...
Providing Civil and E&M Bulk services and balance development for the under construction 593 nos residential quarters 529/Type-II, 38/Type-III,15/Type-IV, 8/Type-V and 3/Type-VI) at GC, CRPF, Dayapur, Assam. (SH(Civil) Providing water supply line, ... of substation Erection ...
Design, Drawing, Supply, Erection, Testing Commissioning of 132 KV S/C Transmission Line on D/C Towers from Haflong GSS to New Haflong Railway Traction Substation, Assam, India in connection with Railway Electrification Work of Lumding-Badarpur.
Construction of new 33 and 11 kV substation with construction of new 33 kV Terminal Bays Construction of 33 kV and 11 kV lines for Distribution System Enhancement and Loss Reduction in Sivsagar Electrical Circle on turnkey basis.
Construction of new 33 and 11 kV substation with construction of new 33 kV Terminal Bays Construction of 33 kV and 11 kV lines for Distribution System Enhancement and Loss Reduction in Cachar and Badarpur Electrical Circle on turnkey basis.
OPERATION AND MAINTENANCE OF 11KV SUBSTATION PMCC HIGH MAST LATICE TOWERS MOTORS AND ALL ASSOCIATED PANELS SOLAR PV PLANTS ELECTRICAL MAINTENANCE ROUND THE CLOCK AT LPG BP SARPARA for a period of one year and extendable to another two year
UNIT CONTROL ENGINEER LOGBOOK, FIRE WATER PUMP HOUSE LOG BOOK, C. W. PUMP HOUSE LOGBOOK, ASH SLURRY PUMP HOUSE OPERATOR LOGBOOK, HFO/LDO PUMP HOUSE OPERATOR LOGBOOK, BOILER‘ 0’ MTR. OPERATOR LOGBOOK, FIRING FLOOR OPERATOR LOGBOOK, TG OPERATOR ... LOGBOOK, SWITCHYARD LOGBOOK, ...
Construction of new 33 and 11 kV substation with construction of new 33 kV Terminal Bays, Construction of 33 kV and 11 kV lines for Distribution System Enhancement and Loss Reduction in in North Lakhimpur and Tezpur Electrical Circle on turnkey basis
Composite Long Rod Insulators (POWERGRID) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate, Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled Yes RA Qualification Rule 50% Lowest Priced Technically Qualified Bidders Type of Bid Two Packet Bid Primary product category Composite Long Rod Insulators (POWERGRID) Bid Number : GEM/2025/B/6319112 Dated : 16-06-2025 Bid Document 1/12 Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 616000 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 20 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : Centralized Procurement Cell Power Grid Corporation Of India Limited, Centralized Procurement Cell, Regional Headquarter, Northern Region- III, Plot No 2A/INS02, Awadh Vihar Yojna, Amar Shaheed Path, Lucknow, Uttar Pradesh – 226002 (Power Grid Corporation Of India Limited) Splitting
Supply and Delivery of Tools and Plants for POWERGRID NERTS
Galvanized Steel Barbed Wire for Fencing (V2) as per IS 278 (Q2) MSE Exemption for Years of Experience and Turnover
Manpower Outsourcing Services - Minimum wage - Skilled; Others; Cook, Manpower Outsourcing Services - Minimum wage - Unskilled; Others; As per attached scope of work
Manpower Outsourcing Services - Minimum wage - Skilled; Not Required; Others, Manpower Outsourcing Services - Minimum wage - Unskilled; Not Required; Others
Procurement of Data Collecting Devices (DCDs) for all regions of POWERGRID
Dehumidifier (Q2) MSE Exemption for Years of Experience and Turnover
Ex-works price for INSULATED COMPACT BUCKET FOR 220KV AC TRANSMISSION LINE AND SUBSTATIONWITH BOOM, MOUNTED ON CHASSIS COUPLED WITH PRIME MOVER - As per TS, Ex-works price for INSULATED COMPACT BUCKET FOR 132KV AC TRANSMISSION LINE AND SUBSTATIONWITH BOOM, MOUNTED ON CHASSIS COUPLED WITH PRIME MOVER - As per TS, Ex-works price for INSULATED COMPACT BUCKET FOR 132KV AC TRANSMISSION LINE AND SUBSTATIONWITH BOOM, MOUNTED ON CHASSIS COUPLED WITH PRIME MOVER -As per TS, Freight and Insurance Price for INSULATED COMPACT BUCKET FOR 220KV AC TRANSMISSION LINE AND SUBSTATIONWITH BOOM, MOUNTED ON CHASSIS COUPLED WITH PRIME MOVER, Freight and Insurance Price for INSULATED COMPACT BUCKET FOR 132KV AC TRANSMISSION LINE AND SUBSTATIONWITH BOOM, MOUNTED ON CHASSIS COUPLED WITH PRIME MOVER
Ferrule Printer (Q3) MSE Exemption for Years of Experience and Turnover
Modular Table/Meeting Table/Centre Table (V2) (Q2) ( PAC Only ), Executive Table (V3) (Q2) ( PAC Only ), Revolving Chair (V4) (Q2) ( PAC Only ), Steel Bookcases confirming to IS 7761 (V2) (Q2) ( PAC Only ), Office Chair (V3) (Q2) ( PAC Only ), Steel Shelving Cabinets (Adjustable Type) confirming to IS 3312 (V3) (Q2) ( PAC Only ), Modular Extendable Conference Table (V2) (Q2) ( PAC Only ) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled No Type of Bid Single Packet Bid Bid Number : GEM/2025/B/6307261 Dated : 19-06-2025 Bid Document 1/23 Primary product category Revolving Chair (V4) Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Supply of 33 kV Current Transformers (CTs) for various SS of North-Eastern Region of POWERGRID
Automotive Vehicles - Retro - Reflective Sheets and Tapes (Traffic Safety) as per IS 14221 (Q4) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2025/B/6693985 Dated : 11-10-2025 Bid Document 1/6, -- Number of days for which Bid would be auto -- extended 10 Number of Auto Extension count 3 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 4 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 454005 Evaluation Method Total value wise evaluation Arbitration Clause Yes ( Arbitration clause document ) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 Arbitration should not be routinely included in contracts Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Heavy duty longspan storage System (Q3) ( PAC Only ) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6318983 Dated : 10-07-2025 Bid Document 1/12 Bid to RA enabled No Type of Bid Two Packet Bid Primary product category Heavy duty longspan storage System Time allowed for Technical Clarifications during technical evaluation 4 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 4009514 Evaluation Method Total value wise evaluation Arbitration Clause Yes ( Arbitration clause document ) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 Arbitration should not be routinely included in contracts Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Quad spacer damper, Quad rigid spacer
Bentonite (V2) Conforming to IS 6186 (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6375281 Dated : 04-07-2025 Bid Document 1/7 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 4 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 367620 Evaluation Method Total value wise evaluation Arbitration Clause Yes ( Arbitration clause document ) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 Arbitration should not be routinely included in contracts Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
145kV, 1250 A RIP Bushing with metal parts And Gaskets as per POWERGRID TS- NER, 145kV, 1250 A RIP Bushing with metal parts And Gaskets as per POWERGRID TS-NER, 145KV, 800A RIP or RIS Bushing with Metal parts and gaskets as per POWERGRID TS-NER, 145kV, 1250 A RIP Bushing with metal parts And Gaskets as per POWERGRID TS Draw Lead Type-NR III, 145KV, 800A RIP or RIS Bushing with Metal parts and gaskets as per POWERGRID TS Draw Lead Type- WR II
245kV, 1250A RIP or RIS Bushing for NER Region, 245kV, 1250A, Draw lead type RIP or RIS Bushing for Western Region-II, 245kV, 2000A, Bottom connected RIP or RIS Bushing for Southern Region-I, 245kV, 1250A, Draw Rod Type RIP or RIS Bushing for Southern Region-I, 245kV, 1250A, Draw Rod Type RIP or RIS Bushing for Odisha Project
400 kV 8800 pF CVT 1Ph along with terminal connector, 400 kV 8800 pF CVT 1Ph with terminal connector, 400 kV 4400 pF CVT 1Ph along with terminal connector, 400 kV 4400 pF CVT 1Ph of 31mm per kV creepage with terminal connector, 400 kV 4400 pF CVT 1Ph with terminal connector, 220 kV 4400 pF CVT 1Ph along with terminal connector, 220 kV 4400 pF CVT 1Ph with terminal connector, 132 kV 8800 pf 1ph CVT along with terminal connector, 132 kV 8800 pf 1ph CVT with terminal connector
Composite Office Tables confirming to IS 8126 (V2) (Q2) ( PAC Only ) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2025/B/6307663 Dated : 19-06-2025 Bid Document 1/6 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
400kV, 3000A, 50kA, 1-Phase, 6 core CT, 120 perc extended current rating with terminal connector as per POWERGRID TS, 220kV, 1600A, 40kA, 1-Phase, 120 perc extended current rating with terminal connector as per POWERGRID TS, 220kV, 1600A, 40kA, 1-Phase, 150 perc extended current rating with terminal connector as per POWERGRID TS, 220kV, 1600A, 40kA, 1-Phase CT with 120 perc extended current rating with terminal connector as per POWERGRID TS, 220kV, 1600A, 40kA, 1-Phase CT with 150 perc extended current rating with terminal connector as per POWERGRID TS, 132kV, 1200A, 31.5kA, 1-Phase CT with 120 perc extended current rating with terminal connector as per POWERGRID TS
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 2, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6483196 Dated : 25-07-2025 Bid Document 1/7 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Motorized Hydraulic compressor joint machine, Die set for Zebra conductor, Die set for Moose conductor, Die set for Lapwing conductor, Die set for 7-3.66mm Earth wire, Die set for 7-3.15 mm Earth wire
Portable Power Generators (Q3) MSE Exemption for Years of Experience and Turnover
Laser Range Finder (Q3) MSE Exemption for Years of Experience and Turnover
Manpower Outsourcing Services - Minimum wage - Semi- skilled; As per Bid Document; Others, Manpower Outsourcing Services - Minimum wage - Skilled; As per Bid Document; Others, Manpower Outsourcing Services - Minimum wage - Unskilled; As per Bid Document; Others
Manpower Outsourcing Services - Minimum wage - Skilled; Not Required; Others
420KV, 1250A RIP or RIS BUSHING, BUSHING LIFTING TOOLS & TACKLES MSE Exemption for Years of Experience and Turnover