Loading…
Loading…
2,575 results • Best match
laying of pipeline outside the substation land in place of pipeline buried by the farmer in the substation land and shifting of water channel
Creation of 1 no. 33 kv line bay at 220kv substation Samalkha for feeding of proposed 33kv substation Bhodwal Majri in Fy 2024-2025.
Please refer bid document
Construction of Boundary wall at 220 kv Substation Narnaul
Construction of Boundary Wall at 220 kV Substation Jind.
Construction of Boundary wall at 220KV SubStation Badshahpur Gurugram
Erection of 33/11KV substation in STP Behrampur and its associated 33KV feeder circuit line though underground cable from Sector-72 220KV HVPNL Substation, Gurugram.
Creation of 33 KV bay at 132 KV substation Kharekan for feeding 33 KV substation Ahmadpur in FY 2021-22 by HVPN.(Planning Code 3B3683)
Development of Distribution Infrastructure of 11 kV feeders (Urban and Industrial) emanating from 66 kV Sub-Stations Pali, Fci Dhoj of Faridabad Circle, DHBVN under REVAMPED REFORMS-BASED AND RESULTS-LINKED, DISTRIBUTION SECTOR SCHEME.
Annual contract for maintenance of equipments under 220KV Switchyard 5 and 6 and 7 and 8 and removal cutting of grass and wild growth in area under 220KV Switchyard 5 and 6 and 7and8 and its disposal outside the plant area for a period of 02 years
Augmentation of 220KV substation Chormar from (1x100MVA) 220/132KV plus (1x100MVA) 220/33KV transformer to 2x100MVA 220/132 plus 2X 100 MVA 220/132KV plus 2X100MVA 220/33KV transformer in FY 2017-18.(Construction of 01No 220KV and 132KV SF-6 Breaker
RMO EI & Fans, compound lights, substation equipment, wetriser system, sprinkler system, water supply pumps, 125KVA DG Set & 6 nos. 8 passenger lifts at Income Tax Residential Colony, Sector 20, Panchkula (Haryana) (SH: Comprehensive maintenance of Escon make 6 nos. 8 passenger lifts)
Creation of 1 no. 132 kV transformer bay along with 2 no. 33 kV T.F. incomer bay, 1no. 33 kV outgoing bay, 1 no. 33 kV capacitor bank bay and 1 no. 33 kV bay for station transformer at 132 kV substation Jhanswa
Construction of Boundary Wall at 132KV Substation HVPNL Mela Ground.
Extension of controln room building at 132 kv substation Kosli.
Construction of Anti Flood Wall at 132Kv substation HVPNL, Ding.
Construction of rain water harvesting system at 132kv substation Ding.
Extension of control room building at 66 kv Substation Dharuhera.
Construction of 220 kV GIS Substation IMT Phase-III Rohtak
Development of Distribution Infrastructure of 11 kV feeders (Urban and Industrial) emanating from 66 kV Sub-Stations Sector 46, 21D, NH3 of Faridabad Circle, DHBVN under REVAMPED REFORMS-BASED AND RESULTS-LINKED, DISTRIBUTION SECTOR SCHEME
Development of Distribution Infrastructure of 11 kV feeders (Urban and Industrial) emanating from 66 kV Sub-Stations Sector-58, Orient Steel of Faridabad Circle, DHBVN under REVAMPED REFORMS-BASED AND RESULTS-LINKED, DISTRIBUTION SECTOR SCHEME
O and M of CETP with average discharge 21 MLD for one year of Civil Work E and M Installation dual media filters centrifuge online SCADA online monitoring system switch yard, valves complete in all respect and all other works contingent thereto
Creation of 02no 132KV bays at 132KV Substation Sitamai to accommodate the creation of 132KV D/C line from 220KV substation Ramana-Ramani to Sitamai (Civil Work)
Creation of 02no 132KV bays at 132KV Substation Sagga to accommodate the creation of 132KV D/C line from 220KV substation Raman-Ramani to Sagga (Civil Work)
To Create 33 kV bay for feeding 33 kV substation Kishanpura at 132 kV substation Mithi Surera by HVPNL in 1st half of the FY 2024-25
Creation of 33 KV Switching Substation in Sector-78 Faridabad and Erecting of 33 KV feeder with laying of 33 KV TR-XLPE cable emanating from 220 KV Substation sector-78 to 33 KV switching Substation Sector-78 at Faridabad including Three years maint
Creation of 33 KV Switching Substation in Sector-75 Faridabad and Erecting of 33 KV feeder with laying of 33 KV TR-XLPE cable emanating from 220 KV Substation sector-78 to 33 KV switching Substation Sector-75 at Faridabad including Three years mainte
Creation of 33 KV Switching Substation in Sector-80 Faridabad and Erecting of 33 KV feeder with laying of 33 KV TR-XLPE cable emanating from 220 KV Substation sector-78 to 33 KV switching Substation Sector-80 at Faridabad including Three years maint
2x25/31.5 MVA, 66/11 KV GIS Substation with SAS along with associated 66 KV underground transmission line from existing 66/11 KV Substation, Sector-8 to proposed 66/11 KV GIS Substation Technology Park, IMT Manesar. 2x25/31.5 MVA, 66/11 KV GIS Subst
Development of Distribution Infrastructure of 11 kV feeders (Urban and Industrial) emanating from 66 kV Sub-Stations Palla, sector31, Sector37, USA, Green-field, Surajkund of Faridabad Circle, DHBVN under REVAMPED REFORMS-BASED AND RESULTS-LINKED, DI
Fabrication and Installation of Tensile Sheet Parking Shed in Front of Admin Building , Switchyard , and Service Building at RGTPP, KHEDAR, HISAR.
Prevention of water entry into switchyard and control room building during rainy season at 132 KV S/Stn Kundli (Civil Works)
Replacement of 132KV SF6 Breaker controlling 132KV Sonipat-Murthal line at 220KV Substation, Sonipat. Replacement of 132KV SF6 Breaker controlling 132KV Sonipat-Murthal line at 220KV Substation, Sonipat.
Providing and laying Road carpeting at 132 kv substation HVPNL, Rohtak.
Construction of new control room building at 132kv substation, HVPNL, Narnaund.
Construction of new control room building at 132kv substation, HVPNL, Dharsul.
Augmentation of 220 KV Sub Stn Masudpur from 1x100MVA 220 132KV 1x100MVA 220 33KV Transformers to 2x100 MVA 220132KV 2x100MVA 220 33KV transformers in 2017 18 Planning Code 2A2660 1 Rearrangement required as per site condition construction of 1 No
Augmentation of 66 KV Sonda from 1x12.5/16 plus 1x25/31.5 to 2x25/31.5 MVA,66/11 KV TF as per scope of work (Labour work)
Floor tiling of control Room building at 66 kV S/Stn. HVPNL, Babain and providing 3 BHP Single phase submersible Tube Well for drinking water supply at 66 kV S/Stn. HVPNL, Babain
Provision of double bus bar arrangement with extension of 132kV Bus bar along with provision of 132kV Bus coupler bay,Creation of 01 No.132kV line bay for Bhanderi and 01 No. 132kV line bay at 132kV substation Gohana for Jassia-Gohana line bay
S/E for augmentation of 132 kV substation Sec 27 and 28 Hisar from (1x20/31.5 plus 1x20/25) MVA, 132/33kv T/Fs to (1x40/50 plus 1x20/25) MVA, 132/33kV T/Fs by HVPNL in 1 st half of FY 2024-25.
Substation Package-SS73 for (i) Extension of 400/220kV Wardha S/S, (ii) Extension of 400/220kV Seoni S/S, (iii) Extension of 400/220kV Morena S/S and (iv) Extension of 400kV Bina S/S associated with Western Region System Strengthening Scheme (WRSS)-23
Design, Supply and Erection of 66/11 KV Outdoor Substation at Basai Water works, Gurugram, by providing 2 x 12.5/ 16 MVA 66/11 KV transformer and its associated 66KV single circuit line on KRR Design for Double circuit 66 KV towers (DCSS Transmissi
Augmentation of 132 KV Substation Jhojhu Kalan from 1x20/25 MVA, 132/33 KV plus (1x16/20 plus 1x10/16) MVA, 132/11 KV T/Fs to 2x20/25 MVA, 132/33 KV plus (1x16/20 plus 1x10/16) MVA, 132/11 KV T/Fs.
Development of Distribution Infrastructure of 11 kV feeders (Urban and Industrial) emanating from 66 kV Sub-Stations A4, Escorts-1, Escorts-2, Ford of Faridabad Circle, DHBVN under REVAMPED REFORMS-BASED AND RESULTS-LINKED, DISTRIBUTION SECTOR SCH
Providing 33 kv line bay to feed 33 kv substation Mandi CKT-II at bay D-2 (back to back ) along with allied equipments at 132 kv substation Naultha
CREATION OF 1 NO 33 KV OUTGOING BAY AT 132 KB SUBSTATION BHIWANI TO PROVIDE CONNECTIVITY TO NEW 33 KV SUBSTATION CH. BANSI LAL UNIVERSITY IN FY 2022-23.
Lump sum contract for sweeping and cleaning of substations offices and security person for Multi story building of XEN OP Divn UHBVN Bgarh
Annual contract for maintenance of equipments under 220 kV Switchyard 5 6 and 7 8 and removal and cutting of grass and wild growth in area under 220 kV Switchyard 5 6 and 7 8 and its disposal outside the plant area for a period of 02 years 2026 28
Extension of Firefighting Line from Misc Pump House Unit 5 toward cooling tower of Unit 5 and Switchyard area in PTPS Panipat