Loading…
Loading…
4,049 results • Best match
For Annual Comprehensive Maintenance and Operation Round the Clock for Three Years of Transformers (33/0.4 KV, 2 X 500 KVA and 33/0.4 KV, 1000 KVA), DG Sets (100 KVA, 40 KVA, 30 KVA) Sub Station Yard, Panel, Street Lights and High Mast at RCVP Naronh
Interconnection on 11 KV Line 1 KM from Sub station to Ishapur At Village Mahilawadi from 25 KVA DTR Ramesh Wala to 100 KVA DTR Shaybu kadwe wala for alternat power supply management under Multai R dc 11 KV Line 1.00 km, 11 KV DP 01 No
Annual Maintenance, Preventive/breakdown maintenance and the work of demonstration as well as repairing works(as per requirement)including supply of required spares of CTR make NIFPS installed at Tapovan and 2x10 MVA substations of Amlohri Project.
Survey Supplyand Installation of minor material and replacementof defectiveIsolator, AB switch MaleFemale contact of AB switch along with Augmentation of Bus Bar Conductor at various 33/11 KV Substations on semi turnkey contract basis under CC GWL
Selection of Contractor for providing Operation and Maintenance of existing 120 MLD Capacity Water Treatment Plant at Ramnagra in Jabalpur which includes, Intake well, 33 KV substations at intake location and at treatment plant location, Treatment P
Selection of Contractor for providing Operation and Maintenance of existing 120 MLD Capacity Water Treatment Plant at Ramnagara in Jabalpur which includes Jack Well, Intake well, 33 KV substations at intake location and at treatment plant location,
Detailed Survey, Soil investigation, Designs and preparation of drawings of various civil structures such as sump well, intake well pump houses, RCC bridges and duct, HT substations, staff quarters etc. and for various mechanical and electrical works
Operation of water pump to supply water in substation and residential Prakash nagar colony pathrota in the morning and evening hours at 220 kv substation mpptcl Itarsi as per direction of engineer incharge. along with minor maintenance of water pipe
Painting Work of Fire Protection Hydrant with associated Fire Fighting equipment, Water Headers of Drainage and Dewatering System, Air Washer unit etc at Power House, DG Set Canopy and its associated Structure/Diesel Pipeline installed at SwitchYard
Work for spraying of weed killer solution and cleaning of grass shrub and maintaining of the cleanness of 400 or 220 or33KV switchyard and transformer yard of PH-I and II and III, at SGTPS, MPPGCL, Birsinghpur.
Daily assistance in day to day electrical maintenance work of L.T.,H.T. Switchgear and motor below 30 KWof BTG area, ESP, ETP, 400KV Switchyard, Generator, Soot Blower, DM Plant, Chlorination lant, Transformer and Rectifier etc. of Uni
WorkContractof daytoday routine maintenance of 220kv400kv Switchyard,all HT LT transformers, Overhead line faults,lighting of BOP BTG building in plant,street lighting in plant,to raw water intake and inside colony and colony elect maintenance sstpp
Work for spraying of weed killer and cleaning of grass shrub and maintaining the cleanness of 400 or 220 or 33 KV switchyard and transformer yard of PH-I or II or III, at SGTPS, MPPGCL, Birsinghpur.
Work contract for Complete dismantling of 132 KV switchyard (in dead condition) including shifting of 63 MVA and 40 MVA transformers non useful 220 KV structures and return of dismantled equipments in safe condition to MPPGCL Stores
Deep screening of 40 mm size metals and removal of bushes dry grass and other foreign material including cleaning of jungle in 220 kv and 33 KV 11 kv switchyard of Power House I 3x105 MW Sirmour
Work contract for Inspection preventive maintenance complete servicing and overhauling of 10 set of breaker mechanism of CG make 400KV SF6 Circuit Breaker with and without PIR installed at 400KV Switchyard 2X660MW SSTPP Stage-II MPPGCL Dongalia
Erection work related to installation of 220 kV/ 132 KV/ 33 kV feeder bays/ transformer bay/ Additional/ Augmentation transformer/ Capacitor Bank bay at various 400 kV/ 220 kV/ 132 kV Substations under Jurisdiction of EHT- Constn. Dn., Gwalior
Survey installation testing and commissioning of new 5 MVA 3311KV Substation Mahdeiya under different schemes in the OnM Circle Singrauli
Award of Contract for system strengthening works for survey, installation, testing and commissioning of new 3.15 MVA / 5 MVA / 8 MVA 33/11kV Substation TILAURA under different schemes in (ONM) Circle Satna .
Award of Contract for system strengthening works for survey, installation, testing and commissioning of new 3.15 MVA / 5 MVA / 8 MVA 33/11kV Substation KHAMARIYA under different schemes in (ONM) Circle Satna .
Award of Contract for system strengthening works for survey, installation, testing and commissioning of new 3.15 MVA / 5 MVA / 8 MVA 33/11kV Substation SAHPUR under different schemes in (OnM) Circle Satna
Various civil construction works pertaining to feeder bays , augmentation of X-mer, addl. X-merc etc. at various Substation under EHT-Construction Division Bhopal
The contractual work of Pony belt installation and Substation preparation in UG for E1A Panel at Chhatarpur Mine no.-1 of WCL, Pathakhera Area.
Supply and Retrofitting of 04 No’s, 1250 Amp, OMEGA (U-Power) Air Circuit Breakers of LT & DG panel at Substation, Main Office, RBI Bhopal
Various civil construction works pertaining to feeder bays , augmentation of X-mer, addl. X-mer etc. at various Substation under EHT-Construction Division Balaghat.
Various civil construction works pertaining to feeder bays , augmentation of X-mer, addl. X-mer etc. at various Substation under EHT-Construction Division Sagar.
Providing testing and commissioning of Microprocessor based addressable intelligent Automatic Fire Protection and Detection system in 33 KV substation Dhanpuri OCM at Sohagpur Area
Construction of RCC service trenches and allied works for 132 KV MRS substation and miscellaneous civil works for various laboratory buildings at RRCAT Indore
Estimate for 09 No. 33 11 KV Substation Earthing Renovation Requirement in SSTD Plan 2025 26 Phase ll Under O and M Division Zeerapur .
Repairing/checking, calibration and testing of different types of relay (protection system) installed in 33KV, 11KV control panel at main substation of Jhingurda mine
Survey, installation, testing and commissioning of new 5 MVA 33/11Kv Kaneri Substation under different schemes in the area of ONM Circle MPPKVVCL, DINDORI
Survey, installation, testing and commissioning of new 5 MVA 33/11Kv Khadda Substation under different schemes in the area of ONM Circle MPPKVVCL, Shahdol
ESTIMATE FOR 11 KV CONDUCTOR AUGMENTATION FROM Substation RAMNIROOPMATI TO OLD TALINE BALDI ROAD VILLAGE UNDER SARANGPUR DC UNDER O n M DN BIAORA
SUPPLY FOR DRINKINGAND EATRH PIT WATER THROUGH PRIVATE TANKERS FROM DATED 15.03.2025 UP TO DATED 30.06.2025AT VARIOUS EHV SUBSTATION UNDER TESTING DIVISION MPPTCL RATLAM
Survey, installation, testing and commissioning of new 5 MVA 33/11Kv MANIKPUR Substation under different schemes in the area of ONM Circle MPPKVVCL, DINDORI
Work For Construction of New 33/11 KV Substation Rawankhedi, 33 KV Line and 11 KV Line Rawankhedi Under Makdone DC OnM Division Tarana
Name of Work- Febrication Work for new 1x5MVA new Proposed 33/11KV Substation Jhookarjogi at Village Jhookarjhogi under Lateri DC SSTD Scheme-2023-2024
Augmentation 4km of Existing 11KV line Multai 1st feeder on weasel to raccoon conductor Mutai Town Substation to Yadav Dhaba under Multai Town DC
Work of Bifurcation of 33 KV Khapra Feeder from 132 KV Taran to 33/11 KV Kharpa Substation Vijayaganj Mandi DC OnM Division Dewas
Installation/ Preparatory work of 01 no. 2 MVA transformer and erection of 3rd bay at surface substation of Khairaha UG mine of Sohagpur Area
Name of Work- Febrication Work for 1x5 MVA new Proposed 33/11KV Substation Sonjna at Village Sonjna under Lateri DC SSTD scheme 2023--2024
Shifting, Erection, Installation, Wiring, Testing and Commissioning of Electrical Equipment for Proposed 1x10 MVA, 33KV/6.6KV Western Substation at West Turra of Nigahi Project
Estimate for replacement of Burnt/damaged LT Aerial Bunched Cable at belonging to 33/11 KV BTI substation Under W/w Zone Bhind(T)
Estimate for 03 km line augoment of 11 kv Ramgarh feeder emanated from 33 11 kv bus stand substation from rating dabra U Dc
Survey, installation, testing and commissioning of new 5 MVA 33/11Kv KHJRI Substation under different schemes in the area of ONM Circle MPPKVVCL, Chhindwara
PTR augmentation from 5 MVA to 10 MVA at 33/11 kv stadium sharma fourm ,Sagartal and Sewa nagar substation under City Circle Gwalior
Various civil construction works pertaining to feeder bays , augmentation of X-mer, addl. X-mer etc. at various Substation under EHT-Construction Division Indore.
Various civil construction works pertaining to feeder bays , augmentation of X-mer, addl. X-mer etc. at various Substation under EHT-Construction Division Ujjain.
Repairing of boundary wall and roof by replacement of sheet and covering of drain by precast slab in jamuna substation at Jamuna Kotma Area.
Various civil construction works pertaining to feeder bays , augmentation of X-mer, addl. X-mer etc. at various Substation under EHT-Construction Division Jabalpur.