Loading…
Loading…
2,758 results • Best match
Construction of 710 quarters (i.e. 410 Gade B/C, 41 Grade D/E, 13 Grade F, 246 VOF) and Club house with Swimming pool including Internal Water Supply Sanitary Installations, Drainage, Modular Furniture, Internal Electrical Installations, Lifts, Fire ... OWC, Substation & ...
Construction of Administrative building for IGNOU at Balewadi/ Construction of Additional Two Floors Vertical Extension in Laboratory bldg at CMET, Pashan, Pune. Construction of Indian Institute Information Technology Pune (Phase -1) including ... laying, substation , ...
Operation and maintenance of elect and mech installation at CGO Block A, B and C at Seminary Hills, Nagpur Subwork/Packages: MOEI and fans street light RMO of pump sets substation HT LT panel DG set AC units and Operation and maint of lift and automatic fire alarm system and fire fighting system
(i) Maintenance and operation of DG Sets at Jawaharlal Nehru Custom House Building, Nhava-Sheva, Navi Mumbai for the year 2025-26. (ii) Maintenance of 22KV, 2 x 500KVA Substation at Jawaharlal Nehru Custom House Building, Nhava-Sheva, Navi Mumbai during 2025-26. (iii) Operation & Maintenance of pump sets at Jawaharlal Nehru Custom House Building, Nhava-Sheva, Navi Mumbai during 2025-26. (iv) Maintenance & Operation of Fire Fighting & Fire Alarm system at Jawaharlal Nehru Custom House Building, Nhava-Sheva, Navi Mumbai during 2025-26. (v) Operation & Maintenance of Lifts at Jawaharlal Nehru Custom House Building, Nhava-Sheva, Navi Mumbai, during 2025-26. SH:- Internal electrification works in 3rd floor Lab & Office spaces at JNCH Building, Nhava-Sheva, Tal-Uran, District: Raigad.
1) MOEI & fans, RMO pump set, street light, DG set at Income Tax, Central Excise & ZSI office. SH: Annual comprehensive maintenance for passenger lift at Zoological Survey of India, Akurdi, Pune. 2) MOEI and fans, RMO of pump sets, lifts, substation at IMD main campus and Ramdurg House, Shivajinagar, Pune. SH: Comprehensive maintenance of 8 passenger lifts. 3) MOEI and fans, RMO pump set street light and passenger lift at Income Tax office, Sadhuvasvani, Pune. SH: Comprehensive maintenance of ESCON make lift, comprehensive maintenance of 6 passengers lift at residential complex/ office of Ombudsman for Income Tax department at Pune. 4) MOEI & fans RMO pump sets, DG set compound light at GPOA building, Akurdi, Pune. SH: Comprehensive maintenance of 13 passengers lift at GPOA, Akurdi. Subwork/Packages: As per NIT
Manpower Outsourcing Services - Fixed Remuneration - IT- Technical; IT maintenance engineer; Diploma, Manpower Outsourcing Services - Fixed Remuneration - Machine repair Technician; Mechanic - Machines; Diploma, Manpower Outsourcing Services - Fixed ... - Substation Operator; ... Operator; Substation Operator;
IPMS SIGNAL SPLITTER Yard-12704, V-I_V-I ISOLATOR Yard- 12704, IPMS-19X0.5 SQ.MM MULTI CORE ZH Yard-12704, IPMS- FUSE TERMINALS 2.5 SQ.MM Yard-12704, CABLE GLAND EIPG 16 Yard-12704, 19X0.5 SQ.MM MULTI CORE ZHLS LFH FLEXIBLE CABLES Yard-12704, IPMS- ... LEVEL SWITCH Yard - ... LEVEL SWITCH Yard -12705, ... LEVEL SWITCH Yard -12706, ... LEVEL SWITCH Yard - ...
construction of 710 quarters (i.e. 410 Grade B/C, 41 Grade D/E, 13 Grade F, 246 VOF) and club house with Swimming pool including Internal water supply sanitary installations, drainage, modular furniture, internal electrical installations, lifts, fire ... OWC, Substation & ...
1) MOEI & fans, RMO pump, set, street light, DG set at Income Tax, Central Excise & ZSI office. SH: Annual Comprehensive Maintenance for Passenger Lift at Zoological Survey of India, Akurdi, Pune. 2) MOEI and Fans, RMO of Pump sets, Lift, Substation at IMD main campus and Ramdurg House, Shivajingar, Pune. SH: Comprehensive maintenance of 8 passenger lifts. 3) MOEI and Fans, RMO pump set streetlight and passenger lift at Income Tax office, Sadhuwaswani, Pune. SH: Comprehensive maintenance of ESCON make lift, Comprehensive Maintenance of 6 Passengers Lift at Residential Complex/ office of Ombudsman for Income Tax department at Pune. 4) MOEI and Fans, RMO of Pump sets, Streetlight at ICE House Compelx, Pune. Comprehensive maintenance of 6 Nos. of 13 passenger lift and 1 No. of 6 Passenger lift.
Fall Protection Emergency Rescue Kit
Custom Bid for Services - SF6 BREAKER HEALTH CHECK UP QTY 3, Custom Bid for Services - ISOLATORS HEALTH CHECK UP QTY 6, Custom Bid for Services - LIGHTNING ARRESTORS HEALTH CHECK UP QTY 9, Custom Bid for Services - CURRENT TRANSFORMERS HEALTH CHECK ... kV switchyard QTY ...
Procurement of 5C* 1.5sqmm control cable
Circuit Breakers with Integral Overcurrent Protection (RCBO) as per IS 12640 (Part 2) IEC 61009 - 1 (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2025/B/6876417 Dated : 11-11-2025 Bid Document 1/5 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 245056.5 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Circuit Breakers with Integral Overcurrent Protection (RCBO) as per IS 12640 (Part 2) IEC 61009 - 1 (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2025/B/6876494 Dated : 11-11-2025 Bid Document 1/5 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 248000 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Industrial Safety Belts and Harnesses as per IS 3521 (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days Bid Number : GEM/2025/B/6323369 Dated : 20-06-2025 Bid Document 1/12 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 2433886 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 49000 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 18 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : POWERGRID POWER GRID Corporation OF INDIA Limited, WR-1 RHQ, NAGPUR-440026 (Powergrid Coporation Of India Limited) Splitting
Computer Printer (V2) (Q2), Multifunction Machine MFM (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6568316 Dated : 22-09-2025 Bid Document 1/38 Number of Auto Extension count 3 Bid to RA enabled No Type of Bid Two Packet Bid Primary product category Multifunction Machine MFM (V2) Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 200780 Evaluation Method Item wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 14 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : SR-II POWERGRID CORPORATION OF INDIA LIMITED Account: 10363892935 Current Account IFSC Code- SBIN0006198 State Bank of India TRADE CENTRE, 294, RACE COURSE ROAD, BANGALORE, KARNATAKA, PIN 560001 (Powergrid) Splitting
Air Conditioner-IS 1391
PROTECTION OF TOWER THROUGH BACKFILLING, REVETMENT WALL AND OR GABION WALL
Circuit Breakers with Integral Overcurrent Protection (RCBO) as per IS 12640 (Part 2) IEC 61009 - 1 (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2025/B/6996658 Dated : 15-12-2025 Bid Document 1/6 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 241200 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Circuit Breakers with Integral Overcurrent Protection (RCBO) as per IS 12640 (Part 2) IEC 61009 - 1 (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2025/B/6988998 Dated : 15-12-2025 Bid Document 1/6 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Custom Bid for Services - Outsourcing of Operation and Maintenance activities of 765400 kV Parli PPT
AMC/CMC of Fire Extinguishers - Hazardous; Dry Powder Fire Extinguisher, AMC/CMC of Fire Extinguishers - Hazardous; Carbon Dioxide Fire Extinguisher, AMC/CMC of Fire Extinguishers - Hazardous; Water Based Fire Extinguisher, AMC/CMC of Fire Extinguishers - Hazardous; Foam Based Fire Extinguisher
Monthly Basis Cab and Taxi Hiring Service - Without Fuel - SUV; Mahindra Scorpio, Mahindra Bolero; 2025; 0-25, 000 kms; A/C; 24 Hours
Dslr/Compact/Handheld Camcorder Or Video Cameras (V2) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2025/B/7045738 Dated : 26-12-2025 Bid Document 1/12, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Multifunction Machines MFM (Q2) MSE Exemption for Years of Experience and Turnover
Hydraulically operated ACSR conductor cutter
48V 300AH VRLA Battery Bank
DSLR/COMPACT/HANDHELD CAMCORDER or VIDEO CAMERAS (Q3)
Fabrication of GI stool for the erection of current transformer.
Padlock (General Use) (Q3) MSE Exemption for Years of Experience and Turnover
REPLACEMENT OF POLYMER INSULATOR STRINGS (CLR) WITH POLYMER INSULATORS (CLR)
Custom Bid for Services - HIRING OF BOOM LIFTER Similar Category Hiring of Special Purpose Mining or Earth Moving Machines (Monthly Basis) Hiring of Earth Moving Equipments, Material Handling Equipments and Cranes (per Hour basis) Hiring of Special Purpose Mining or Earth Moving Machines (Monthly Basis) Hiring of Earth Moving Equipments, Material Handling Equipments and Cranes (per Hour basis)
Monthly Basis Cab and Taxi Hiring Service - Without Fuel - SUV; Mahindra Bolero, Mahindra Marazzo, Mahindra Scorpio; 2020; 75, 000-1, 00, 000 kms; A/C; 12
Leasing of Electric Vehicles (Long Term) - Wet Lease; TATA NEXON EV OR TATA NEXON MAX EV OR EQUVIVALENT; 2400 KMs per Month and 24 Hours; 36 Months Lease; White
Annual Maintenance service-AIR CONDITIONER
Custom Bid for Services - Supply Installation of PTZ cameras
Monthly Basis Cab and Taxi Hiring Service - Without Fuel - SUV; Mahindra Scorpio, Mahindra Bolero, Equivalent or higher model; 2024; 0-25, 000 kms; A/C; 12
Custom Bid for Services - Dark fiber leasing from BHEL to LIC Square in Nagpur Intracity for Two Years, Custom Bid for Services - Dark fiber leasing from BHEL to RBI MOB in Nagpur Intracity for Two Years, Custom Bid for Services - Dark fiber leasing ... Repeater400KV Substation MSETCL ...
HDPE Duct
Manpower Outsourcing Services - Minimum wage - Unskilled; Others; Mali/Gardner Helper
Manpower Outsourcing Services - Minimum wage - Skilled; Others; Electrician, Manpower Outsourcing Services - Minimum wage - Semi-skilled; Others; Mazdoor/Labour, Manpower Outsourcing Services - Minimum wage - Skilled; Others; Mason, Manpower Outsourcing Services - Minimum wage - Unskilled; Others; Mazdoor/Labour
Monthly Basis Cab and Taxi Hiring Service - Without Fuel - SUV; Mahindra Scorpio, Mahindra Scorpio or Higher Model; 2025; 0-25, 000 kms; A/C; 24 Hours
Manpower Outsourcing Services - Minimum wage - Unskilled; Others; Mazdoor/Labour, Manpower Outsourcing Services - Minimum wage - Skilled; Others; Attendant
C/o of short circuit lab, temperature rise lab, impluse lab and LT room and internal road works, retaining wall, septic tank, ug sump, ic water supply, sanitary installation drainage work and providing IEI, EPABX, LT panels and cabling, AC units, ... at substation area, ...
CC Ring-1, CC Ring-2, CC Ring-3, CC Ring-4, CC Ring-5, CC Ring-6, Arcing Horn-1, Arcing Horn-2, Arcing Horn-3, Arcing Horn-4, Arcing Horn-5, Arcing Horn-6, CC Ring-7, CC Ring-8, CC Ring-9, CC Ring-10, CC Ring-11, CC Ring- 12, Arcing Horn-7, Arcing Horn-8, Arcing Horn-9, Arcing Horn-10, Arcing Horn-11, Arcing Horn-12, CC Ring-13, CC Ring-14, Arcing Horn-13, Arcing Horn-14, CC Ring-15, Arcing Horn-15, CC Ring-16, Arcing Horn-16, CC RING-17, CC RING-18, CC RING-19, CC RING-20, CC RING-21, CC RING-22, CC RING-23, CC RING-24, CC RING-25, CC RING- 26, CC RING-27, CC RING-28, CC RING-29, CC RING-30, CC RING-31, ARCING HORN-17, ARCING HORN-18, ARCING HORN-19, ARCING HORN-20, ARCING HORN-21, ARCING HORN-22, ARCING HORN-23, ARCING HORN-24, ARCING HORN-25, ARCING HORN-26, ARCING HORN-27, ARCING HORN-28, ARCING HORN-29, ARCING HORN-30, ARCING HORN-31, CC RING-32, CC RING-33, CC RING-34, CC RING-35, CC RING-36, CC RING-37, CC RING-38, CC RING- 39, CC RING-40, CC RING-41, CC RING-42, CC RING-43, ARCING HORN-32, ARCING HORN-33, ARCING HORN-34, ARCING HORN-35, ARCING HORN-36, ARCING HORN-37, ARCING HORN-38, ARCING HORN-39, ARCING HORN-40, ARCING HORN-41, ARCING HORN-42, ARCING HORN-43, CC RING-44, CC RING-45, CC RING-46, CC RING-47, CC RING-48, CC RING-49, CC RING-50, CC RING-51, CC RING- 52, ARCING HORN-44, ARCING HORN-45, ARCING HORN- 46, ARCING HORN-47, ARCING HORN-48, ARCING HORN- 49, ARCING HORN-50, ARCING HORN-51, CC RING-53, CC RING-54, CC RING-55, CC RING-56, CC RING-57, CC RING- 58, CC RING-59, CC RING-60, ARCING HORN-52, ARCING HORN-53, ARCING HORN-54, ARCING HORN-55, ARCING HORN-56, ARCING HORN-57, ARCING HORN-58, ARCING HORN-59, ARCING HORN-60, CC RING-61, CC RING-62, CC RING-63, ARCING HORN-61, ARCING HORN-62, ARCING HORN-63
High End Laptop - Notebook (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller OEM Authorization Certificate, Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6547506 Dated : 02-09-2025 Bid Document 1/14 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 47000 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 39 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : Engineer RHQ WR-II SAMA-SAVLI ROAD, ADJACENT TO RIYA REVATI RESORT, POWER GRID CORPORATION OF INDIA LTD, VADODARA, GUJARAT-390024 (Rajesh Kumar Singh) Splitting 2/14
Transformer Oil filtration plants (Q3) MSE Exemption for Years of Experience and Turnover
Marvel Mid Back Chair, MINGLE POD PLT PEBBLE 1000X1000 ST, PISA 3 SEATER SOFA, PISA 2 SEATER SOFA, Gain Pro Storage with Glass Door, Meraki Shoe Cabinet Brown Beige, Gain Pro Locker
Light Weight Battery Powered 100 Ton capacity Hydraulic Compression Machine in WR-II- New Navsari, Light Weight Battery Powered 100 Ton capacity Hydraulic Compression Machine in WR-II- Banaskantha, Light Weight Battery Powered 100 Ton capacity Hydraulic Compression Machine in WR-II- Boisar
Supply of Insulation Sleeve and Self fusing Tape for NR 3 and