Loading…
Loading…
82,777 results • Best match
Electrical work in connection with Provision of Ramp for FOB under Harmonized guideline for Divyangjan Facilities at 54 stations (Total 108 Ramps) and Improvement of sub-station building in different Sub-Station over LJN- DIV.
Work of Construction of Second Circuit 33 kV Line on existing 33 kV Line from 220 kV Sub Station Piran Kaliyar Imlikheda to 33/11 kV Sub Station Dadajalalpur under EDD Bhagwanpur under EDC Roorkee
Maintenance and strengthening work of 11KV overhead lines from 02 nos. sub-station to Jhirkey sub-station (3MVA) with associate branch line 11KV OHL to Banch bastiand Dudhmatia Village near Kathara OCP under Kathara Colliery.
Trimming of tree branches and bush cutting re-standing of conductor of 3.3KV, 6.6KV, 440 OH Line Regional sub station to 2 no sub-station and mines feeder pump house at quarry no 2 KTC.
Part maintenance of 11kV HT OHL by replacement of old, damaged and worn out accessories in the OHL structure from KDH old sub-station to Quarry no. 01 sub-station under Purnadih OCP, NK Area.
Installation of 63- 25KVA Sub Station near house of Gh Hassan Shergojri at Khulbugh Batagund and 63-25KVA Sub Station near house of Ali Mohd Lone and saifudin mir at Batagund for District Pulwama.(BDC)
Day to day maintenance and erection work for 33 KV Overhead line drawn from 132/33 KV Nandira sub-station to 33KV/6.6 KV sub-station of Bhubaneswari OCP for a period of 730 days.
Annual Maintenance Contract for 11kV Overhead line maintenance work from Balanda Sub-station to Ananta Vihar Colony Sub-station of Ananta OCP, Jagannath Area for a period of one year as and when required basis
Safe carriage of with loading and unloading of 01 No. 33/11 KV, 5MVA Transformer (old and used) from 33/11 KV Sub-Station Budhana Mode Khatauli to 33/11 KV Sub-Station Kaniyan (Shamli).
Branch/bush cutting, surface dressing, vegetation removing below the 11 KV O/H line (both feeder) from 4211 Sub-station to Garhi filter plant and 4211 Sub-station to Karo Village under CHP-CPP, PPR.
Testing and Calibration of Switchgears protective relays and measuring equipments from NABL accredited lab installed at 22.5MVA, 33kV/11-3.3kV Old Sub-station and 15MVA, 33kV/6.6kV New Sub-station of KDH OCP, NK Area
Repair and maintenance of 11KV OH line from Dhori Sub-station to CCD Sub-station along with replacement of damaged insulator, stay sets, pole and conductor in jungle area under CCD, G.M. unit, Dhori Area
Work of transportation (Collection from Rajhara Area), Installation and commissioning of 3 MVA, 33KV, 11KV Transformer at main sub-station Kathara and Supplying and erection of earth pit at regional sub-station of Kathara Colliery.
Cleaning of jungle including uprooting of rank vegetation grass, brush wood trees and sampling of girth and removal of Rubbish of 132/33Kv Nandira Sub-station and 33/11kV Balanda Sub-station under Jagannath Area
Re-arrangement, repairing and maintenance of existing 33KV Over head feeder no. F-1, F-13 and F-16 of 132/33KV Sub Station Sub Station, Gevra Area for 120 days within duration of monsoon
One span extension and repair/maintenance of the existing OH Line 6.6 KV OH Line drawn from Main Sub-Station to RWP and installation of GOAB Switch near at Main Sub station under Rajrappa Washery
Constructions fo 33 Kv HT feeder from Balipur 132 KV sub station to Dhora road N H Bada Bypass for 33/11 KV sub station in Sector-8 at Ramganga Nager Scheme Bareilly. Part-B
Shifting of DG shed, pre cast boundary wall , chain link fencing and extension of control room of Jarada sub- station along with extension of cable trench at Jarada sub- station of KOCP of Kaniha Area
RMO of Sub Station no. 1,3,4 and Ortho block at L.N. Hospital, New Delhi. SH Repairing/Servicing of 4 x 80 TR cooling tower for DG sets at Sub Station 4 and other misc works
Work of expansion of proposed storage center at 33/11 KV sub-station, Ayodhya and painting work at 33/11 KV sub-station Kaushalpur, Saket, Durgapuri and Devkali in view of Deep Utsav in Ayodhya.
Making double supply arrangement to 33/11 KV Sub-Station IIPR from existing 33 KV line to 132/33 KV Sub-Station Jawaharpuram to Keshavpuram by taping at Keshevpuram end under Kalyanpur Division, Kesco., Kanpur.
Day to day maintenance and repair work of 11KV HT overhead line for feeder no 1 and 2 of Kedla feeder from Central Sub-station to Kedla Sub-station under Kedla OCP of Hazaribagh area
Replacement of damage/defective 496 KVAR (IS 13925/2012) capacitor cell at 66 KV Grid Sub Station Manimajra installed on Power Transformer (T1) and Power Transformer (T2) at 66 KV Grid Sub Station Manimajra, Chandigarh
Work of Capacity enhancement 5 MVA To 10 MVA of 33/11 KV Sub-station at Dubhar sub station under the area of EDD- IV Ballia on semi-turnkey basis (under Business plan 2024-25)
Construction of 3.14 Km 33 KV line from 33/11 KV Sub Station Baram to 33/11 KV Sub Station Didihat for proper completion of Didihat - Baram 33 KV line Under Electricity Distribution Division Dharchula
Maintenance and repairing work of 33 kV, 11 kV, 3.3 kV panels and transformer of Main Sub-station and Shantinagar Sub-station for a period of one year (265 working days) at LOCP, Lingaraj Area.
Repairing and maintenance of overhead line of Nakrakonda Hospital Sub station to Magazine house and along with workers and staffs colony and 3.3KV Sub station related job at Nakrakonda Kumarihi B Colliery under Bankola Area
Work relate to 33/11 KV Sub-station capacity augmentation of Existing 2X6.3MVA to 3X6.3MVA by installation of new 6.3 MVA PTR with allied work at Ahiran 33/11 KV Sub- Station under Raghunathganj Division.
Safe carriage of with loading and unloading of 01 No. 33/11 KV, 5MVA Transformer (old and used) from 33/11 KV Sub-Station Khatauli Town to 33/11 KV Sub-Station Ishopur Teel (Shamli).
Repair and maintenance of 11KV O/H line Albion sub-station to Karamatand sub-station and Extension 220V O/H line in Mine Periphery and Installation of 40KVA Transformer at Damoda Colliery under Barora Area.
RMO sub-Station including DG sets sub-station at MAMC, New Delhi.Sh Replacement of Existing of Servo Voltage Stabilizer and automatic phase sequence corrector in Pathology Block, Dean Block lift machine room and AC Plant
Renovation of Gravelling work by providing concrete base including other miscellaneous work at 132/ 33 KV Switch Yards of Ramgarh Sub-station (Phase- II) and West Bokaro Receiving Sub-station under GOMD-VII, DVC, Ramgarh
PROVIDING E AND M WORK SERVICES AT HAF GZB SH RMO OF 1 NO 33 KV OUTDOOR TYPE ELECTRICAL SUB STATION IN DOMESTIC AREA AND RMO OF 11/0.433 KV SUB STATION FOR MAFI PROJECT
RMO Sub-Station DG Set & pump sets at AG Office & Residential Colony at Shakti Nagar Jammu during 2025-26. (SH:- Providing Services of operation and routine maintenance of Sub Station, DG Set & Pump Set etc.)
Conducting modern line survey for Construction of DC link Line on DC towers from existing 220kV Bagalkote Sub-Station to 220kV Bilagi Sub-Station for distance of 50kms in Bilagi and Bagalkote Taluk, Bagalkote District
Operation, Maintenance and External services including East Wing Sub-Station at South Block, New Delhi. (SH: Replacement of Acoustic Enclosure (Canopy) of existing 2x500 KVA DG set installed at East Wing Sub-Station, South Block.)
Combined package of Estabishing 2x20MVA 110/11 sub station at Pamanakallur, Kyadigera and 2x20MVA, 110/11kV & 1x20MVA, 110/33kV Sub-Station at Kadlur village along with construction of associated lines and TB in Raichur District.
Erection Testing AND Commissioning of New 33KV Source Line To Be Emanated From Sabang 33 11KV Sub Station to upcoming Gopinathpur 33 11KV Sub Station Under Belda Divison Under Paschim Medinipur Region under DDUGJY Scheme
ERECTION OF SUB-STATION EARTHMAT and EQUIPMENT EARTHING,LAYING OF POWER CABLES AND OTHER ALLIED WORKS FOR THE PROPOSED 33/11 KV SUB-STATION AT KASBA UNDER RAIGANJ DIVISION IN THE DISTRICT OF UTTAR DINAJPUR
Facility Management Services - LumpSum Based - For Maintenance and Renovation work at 33kv Sub Station Girjanagar District Unnao; For Maintenance and Renovation work at 33kv Sub Station Girjanagar District Unnao; Consumables to be provided by service..
Binding and Stitching Services - Binding and Stitching; Supply of logsheet and shutdown book at various sub station under ETD IV Varanasi; Supply of logsheet and shutdown book at various sub station under ETD IV Varanasi
Facility Management Services - LumpSum Based - For Water Logging Work at 33kv Sub Station Baraijalalpur District Sitapur; For Water Logging Work at 33kv Sub Station Baraijalalpur District Sitapur; Consumables to be provided by service provider (inclu..
For Carriage of Transformer trolley from Sub Station to damaged Transformer Plinth/ Four pole/ Double pole and after replacement of damaged transformer by healthy transformer, carriage back transformer trolley to Sub-Station under EUDD thakurganj
ForCarriage of Transformer trolley from Sub Station to damaged Transformer Plinth/ Four pole/ Double pole and after replacement of damaged transformer by healthy transformer carriage back transformer trolley to Sub-Station under the EUDD-Thakurganj
For Carriage of Transformer trolley from Sub Station to damaged Transformer Plinth/ Four pole/ Double pole and after replacement of damaged transformer by healthy transformercarriage back transformer trolley to Sub-Station under the EUDD-Chowk
Separation of overloaded 11 KV Pataraa Feeder (Presently emination from 33/11 KV Sub-Station Medical College) from 33/11 KV Sub-Station Khutahan, Distt.- Gorakhpur on Turnkey Basis under Business Plan Year 2018-19
Separation of overloaded 11 KV Siktour Feeder (Presently emination from 33/11 KV Sub-Station F.C.I. Gorakhpur) from 33/11 KV Sub-Station Sarahri, Distt.- Gorakhpur on Turnkey Basis under Business Plan Year 2018-19
Construction of new 33 KV line from 132/33 KV Sub-Station Purnachapar, Distt.-Deoria to existing 33/11 KV Sub-Station Bhingari Bazar, Distt.- Deoria on Turnkey Basis under Business Plan Year 2019-20
Providing Services of Sub-Station operator (ITI Certificate holder) in shift duties, to carry out the operation and filling of Log Sheet at 132/11 KV Sub-Station SGPGI under E.E.,EUDD-Vrindavan,LESA Lucknow.
Separation of existing overloaded 11 KV Darhata feeder from 33/11 KV Sub-Station Chauk, Distt.-Maharajganj and Separation of existing overloaded 11 KV South feeder from 33/11 KV Sub-Station Nichalaul, Distt. - Maharajganj