Loading…
Loading…
2,460 results • Best match
M and R works to Central Workshop and 132 K.V. Sub-Station, Ganeshpuram area for the year 2025-26, Kothagudem Corporate, Bhadradri Kothagudem District, Telangana State.
Erection, testing and commissioning of 33/11KV Sub Station connected with 33KV & 11KV lines at Narsingi (V) in Gandipet (M) of Ibrahimbagh Division in Cybercity Circle
Hyderabad Division - Outsourcing of TSS operators (Monitoring & Data Recording of TSS) at Divitipally (DTP) & Talmadla (TMD) Traction Sub Station (TSS) for a period of 02 years.
Supply delivery of various mandatory spares for 220 KV substation like Metering Current Transformers Individual Current Transformers Inductive voltage Transformers SF6 vacuum Circuit Breaker etc for 220 66 KV sub station at Mallaram under Godavari Drinking Water Supply Scheme phase-I under PCC-III HMWSSB
Switch Yard Maintenance works at JNTUH College of Engineering Jagtial
MOEI AND FANS RMO PUMP SET DG SET SUB STATION AND STRRET LIGHTING AT RP NILAYAM HYDERABAD Subwork/Packages: HIRING OF KIOSK CCTV AND MISC ELECTRICAL ITEMS FOR UDYAN UTSAV AND MANY VVIP FUNCTIONS STARTING FROM 16 DECEMBER 2025 UPTO JANUARY 2026
Erection, testing and commissioning of Switchyard for 2nos. 33/11 KV Sub Stations at i) Kotamarthy (vg) in Yadadri Circle and (ii) Gummadivelli (vg) in Suryapet Circle of Thungathurthy Constituency
Erection, testing and commissioning of Switchyard for 3nos. 33/11 KV Sub Stations at i)Kondapur (vg), (ii) Chowdur (vg), and iii) Rudraram (Vg) of Jadcherla Constituency in Mahabubnagar Circle
Erection, testing and commissioning of Switchyard for 3nos. 33/11 KV Sub Stations at i)Pullur(vg), (ii) Somapuram(vg), and iii)Turukonipally(Vg) of Gadwal Constituency in Gadwal circle
Erection, testing and commissioning of Switchyard for 2nos. 33/11 KV Sub Stations at i) Kusumasamudram(Thirmalapur) (vg) and (ii) Kistapur (Palugu tanda) (vg) in Pargi Constituency in Vikrabad Circle
Erection, testing and commissioning of Switchyard for 3nos. 33/11 KV Sub Stations at i) Naginenipally(vg) (ii) Koratical(vg) (iii) Gandhamalla(vg) in Alair Constituency in Yadadri Bhongiri Circle.
Recall Provdiing and laying of 3.5 core x 150 sq mm from C Hostel sub station LT Panel to MPDB Panel in NRS Hostel in UoH campus
Laying of CC beds for proposed new 33 KV feeder no.03 OHT line from 132 KV sub-station to KCHP, Manuguru, Bhadradri Kothagudem dist, Telangana State
Electrification to 512 houses at Kharmanghat beside Nandanavanam Sub-Station at Meerpet Section in Champapet Subdivision in Champapet Division of Saroornagar Circle under JNNURM (Housing), GHMC, Hyderabad
Providing of parking shed for four wheelers and two wheelers at O/o SE/OMC/Adilabad inthe premises of 132 KV sub Station Mancherial in OMC Adilabad
Construction of Section Office Shed with Pre-Painted Galvalume Trapezoidal Profile Roofing Sheets at 33/11 K.v. Sub Station Nallabelly Premises in Narsampet Division of Warangal Circle
Restoration of damaged Road Cutting by TSSPDCL with RMC from ACP office, Saidabad to Electric Sub Station, Akberbagh via RR Function Hall in Akberbagh, Div-27, GHMC.
Laying Damaged Road from Electrical Sub Station Santosh Nagar to Dr Sadat Rasool Clinic in 39-Santosh Nagar, Santosh Nagar Cirlce-7, CRZ, GHMC Rs. 17.85 Lakhs
Construction of Compound wall at 33/11KV Sub station Madgul in Madgul (V & M) of Amangal Sub Division in Kandukur Division of Rajendranagar Circle (Reserved for ST)
Erection of 33/11KV Sub-Station at Achyuthapuram (V) in Aswaraopeta (M) of Kothagudem Division of Bhadradri Kothagudem Circle under T&D /SI on partial turnkey basis.
Erection of 33/11KV Sub-Station at Gatlanarsingapur (V) in Bheemadevarapally (M) of Hanumakonda Rural Division and Hanumakonda Circle under T&D /SI on partial turnkey basis.
Shifting of power supply connection to EI, B Ed Hostel and Academic Staff College from CFRD transformer to Temporary building sub station transformer on the OU Campus
Providing and laying of 3.5 core x 185 sq mm from Old science complex Sub-station to outdoor AMF Panel at RTGR building, University of Hyderabad campus
Laying of VDCC road from Electrical Sub Station to LIG-19, Huda Colony approaching road under Gudimalkapur-71, ward-12, circle 12 (KZ), GHMC(Reserved for SCs)
Replacement of Tilted 132 KV Bus, Bay and equipment structures at 132 KV Sub Station Sirpur Kagaz nagar in Komuram Bheem Asifabad District under OMC Circle, Adilabad
Providing of footpath from Quarter No.1 to TSCPDCL power Sub Station in Kundanbagh main road in 98-Ameerpet, Circle No. 17 (KZ), GHMC (Item NO.1)
Shifting of power supply of ECE Department building from University College of Engineering Sub-Station to UFRO distribution transformer through under ground cable on the O.U. Campus.
Erection of 33/11KV Sub-Station at Donthapoor (V) in Dharmapuri (M) of Jagityal Division of Operation Circle Jagityal under T&D /SI on partial turnkey basis
R/F R&B Road at Sub Station Reddypally to Pochamma Temple Reddypally (V) Moinabad (M) Ranga Reddy District,Est.Cost Rs.120.00 Lakhs Under CRR 2022-23
Erection of 33/11KV Sub-Station at Galipally (V) in Ellanthakunta (M) of Karimnagar Division in Operation Circle Karimnagar under T&D /SI on partial turnkey basis
Erection of 33/11KV Sub-Station at Anantharam (V) in Karakagudem (M) of Bhadrachalam Division of Bhadradri Kothagudem Circle under T&D /SI on partial turnkey basis.
Maripeda Municipality - Laying of CC Road from Sub Station to Veg and Non Veg Market (via Jarkula Ravi House to Ramnivas Lane) in Maripeda Municipality under SDF
Erection of 33/11KV Sub-Station at Korapally (V) in Jammikunta (M) of Huzurbad Division in Operation Circle Karimnagar under T&D /SI on partial turnkey basis
Surrounding maintenance to public toilets at Ramanthapur Bus stop, CPL Police Station and Electrical sub station in Amberpet division (RE-CALL) (Rs.3.40 lakhs) Item NO.09
Construction of Side Drain from Sub-station Compound Wall to U Gattaiah House at RK-8 Colony in Ward No.06 Naspur Muncipality (Reserved for SC Category)
Repairs and Laying of pre-cast slab for strom water drain at prashant Nagar park near sub station in Ward no. 121 of Kukatpally Circle-24, GHMC
Construction of Indoor sub-station for keeping transformers, electrical controls for 2nd feeder breakers at OCP-III EP-II , RG II area, Godavarikhani- Dist: Peddapalli, Telangana State.
Formation of shed to protect sub station installations at krushibhavan, RG II area, Godavarikhani Dist Peddapalli, TS (Invited under earmarked work WADDERA.SAGARA.UPPARA community are eligible to participate.)
Erection of 33/11KV Sub-Station at Mohammadnagar (V) in Nizamsagar (M) of Banswada Division of Operation Circle Kamareddy under T&D /SI on partial turnkey basis
Bifurcation of 11KV Rolling hills feeder emanating from 33/11KV SEZ Sub Station in White field Section of Kondapur Sub Division in Kondapur Division of Cybercity Circle
Construction Of department SPM shed with 24ft 50ft inside Size in the premises of 132 33 11kv sub station at Ghanpur in Ghanpur division of jangaon Circle
Erection of 33/11 KV sub-station with connected 33KV and 11KV lines at Hardware Park Phase-II near Kancha Imarath(V) in Maheshwaram(M), RR District.
Operation and Maintenance of Sub-station equipment, RMO DG set, Pumpset, IEI fans and Street lights and Annual Maintenance of DG set at CGWB Campus, Tattiannarm, Hyderabad.
Annual Maintenance and Monthly Servicing to the 2Nos of 125KVA DG Sets, 1No of 250KVA DG set and 1 No. of 320KVA DG Sets located in New filing section, C Block Sub station, Administrative Building and Main Control Room Sub Station respectively in the P/o High Court of Hyderabad for the year 2020-2021 i.e. from 01.06.2020 to 31.03.2021. (10 Months)
Erection of new 33/11 KV Sub-Station with 5MVA Power Transformer with 6.9 KM 33 KV line & 8 KM 11 KV line along with civil works like Control Room, Retaining wall, Internal security fencing, Outer security fencing and Bore well, water sump at 33/11 ... KV Sub -Station ... Sub- Station at ...
Erection of 33/11KV Sub-Station (GI) with connected 33KV and 11KV lines at Mogilicherla (V) in Geesugonda (M) of Warangal (T) Division of Operation Circle Warangal & Erection of 33/11KV Sub-Station (GI) with connected 33KV and 11KV lines at Gareebnagar (V) in Geesugonda (M) of Warangal (T) Division of Operation Circle Warangal under T&D/SI Scheme on partial turnkey basis.
Bifurcation of 11KV Jai Bhavani feeder emanating from 33KV/11KV Gaganpahad Sub-Station bylaying of 1.4 KM of 11KV 3*185 Sq. mm UG Cable duly tagging to the existing 11KV feeder at Indus Towers along witherection of new 11KV feeder VCB in 33KV/11KV ... Gaganpahad Sub -Station ... Sub- Station in ...
Custom Bid for Services - Deployment of crane (14Ton- 50feet) service on as and when required basis for switch yard maintenance work at Khammam substation Similar Category Hiring of Earth Moving Equipments, Material Handling Equipments and Cranes (per Hour basis)
Supply of PG Clamps and Terminal Connectors for 220KV Switch yard
OUTSOURCING OF SERVICES FOR 33/11 KV MAIN RECEIVING SUB STATION AND MAINTENANCE SERVICES FOR DAILY ELECTRICAL COMPLAINTS AT DRDL/ASL AREA UNDER GE(I) RND KANCHANBAGH, HYDERABAD