Loading…
Loading…
21,940 results • Best match
Construction of office Building and 02 Nos T-VI qtrs. i/c IEI Fans FFS FAS Lift Sub Station and DG Set for Income Tax Department at Gorakhpur UP SH Provision of 01 No. Borewell for New Office Building at Income Tax Campus Gorakhpur UP Subwork/Packages: One
Construction of Office Building and 02 Nos T VI Qtrs. i/c IEI Fans FFS FAS Lift Sub Station and DG Set for Income Tax Department at Gorakhpur UP. SH Provision of 01 No Borewell for New Office Building at Income Tax Campus Gorakhpur UP. Subwork/Packages: One
QUANTUM OF WORKS INVOLVED IN Contraction of 11 KV new Line requried for connecting Village on 11 KV Achalgang/Harha Feeder 33/11 KV Sub Station Achalgang, EDSD-III Banthar under Divison-II, Unnao aginest Package No. 90/EDC(U)/D-2 in Business Plan Yea
QUANTUM OF WORKS INVOLVED IN CONSTRUCTION of LT Line, Laying of ABC Conductor at Ambikapuram AN Makaital at shuklaganj Unnao in the area of 33/11 KV Sub Station Shuklaganj, EDSD-I Shuklaganj under EDD-II, Unnao. against 83 AND 85/EDC(U)-D-2 under B
QUANTUM OF WORKS INVOLVED IN Instllation New Transformer and new LT Line, ABC Conductor at Indra Nagar Shuklaganj Unnao. in the area of 33/11 KV Sub Station Shuklaganj, EDSD-I Shuklaganj under EDD-II, Unnao. aginest Pakage No. 78/EDC(U)/D-2 in Busine
29/2024-25/EDCR Shifting connection of M/S Swati Menthol and Alloyed chemicals Ltd. Site at Vill-Shahzad nagar The-Sadar Rampur on 11 KV line to 33 KV modi Xerox Feeder emanation from 132 KV Sub station Panwariya Rampur under Jurisdiction of EDD-Mila
Erection of 11 KV HT Line 0.4 KV LT Over head Line construction of 11 0.4 KV new sub station for feeding temporary power supply for typeIV (Block B) quarters and type III (Block B) quarters in new constructed tower buildings of new colony HTPS Ka
For Installation of 1 No. 250 KVA Transformer Near By Raj Hans Oil Sector-3, Sastri Nagar Feeding from 11 KV Feeder RTO of 33/11 KV Sub-Station, Rangoli to Avoid Low Voltage Problem in Ladies Part, Sector-10, Shastri Nagar, Mrt Under EUDD-III, Mrt.
REPAIR/MAINT/REPLACEMENT OF EXTERNAL LT SUPPLY, LT PANEL BOARD, LT SWITCH GEAR AND ALLIED WORKS AT VARIOUS SUB STATION AND MISC LT INFRASTRUCTURE OF CH CC, CMDC, ECHS, SHO, BASE HOSP, SOI IN THE AREA OF AGE E/M (HOSP) UNDER GE E/M LUCKNOW
Construction of New 250 KVA LT Sub-Station near Petrol pump and errection of double circuit 11 KV underground cable in place of damage cable under 33/11 KV S/S Jankipuram and Sector-I, against Business Plan sanction package No-140, 141/SI/CE/2020-21,
Maintenance of EI & Fans i/c RMO Street Light, Pumps in Residential Area & i/c RMO DG Set, Sub-station in Non-Residential area at BSI, Allahabad during 2022-23. (SH: - Comprehensive Maintenance of IEI & Operation of essential E&M services and comprehenive maintenance of pumps)
QUANTUM OF WORKS INVOLVED FOR INSTALATION OF NEW 11 KV V.C.B. AND REPLACEMENT OF OLD 11 KV XLPE CABLE AT NAVAI AND RAIPUR GADHI FEEDER EMANETING 33/11 KV SUB-STATION AJGAIN UNDER THE BUSINESS PLAN YEAR 2024-25 IN THE AREA OF E.D.S.D.-I, AJGAIN
Increasing capacity of T/F shifting of overhead line and construction of New LT Sub-Station against Business Plan Year 2020-21 sanctioned package No. 170/2019-20 and 25, 27, 28, 29, 30, 31, 32/2020-21, Under the area of EDD-B.K.T. LESA, Lucknow.
COMPREHENSIVE MAINT OF BLDG PORTION OF 33/11/33 KV INSTALLATION AND SUB STATION AT 24 ED AND COMPREHENSIVE MAINT OF B/R PORTION OF PUMP HOUSE AND COMPREHENSIVE MAINT OF BR PORTION OF DG SET INSTALLATION AT 24 ED AND COMPREHENSIVE MAINT OF B/R PORTION
Increasing capacity of T/F, construction of New HT/LT sub-station, and replacement of damage 33 K.V. underground cable, against Business Plan Year 2020-21 sanctioned package No. 26, 52, 53, 54, 74, 83 and 84,/2020-21, in the area of Vikas Nagar S.Div
Civil work for Construction of Foundation of 1 Nos Circuit Breaker and 1 Nos Isolater and Related Trench to Feed all Independent 132 KV Feeders During Synchonization of Different 132 KV Line Sources on Main Bus and Main Bus-2 at 132 KV Sub Station IA
Constrcution of 02 Nos 33/0.4 KV SUB-STATION AND 33 KV LINE FROM 132 KV S S BHARUWA SUMERPUR HAMIRPUR TO SITE BHOURA DANDA PUMP CANAL STAGE-2 NARAYANPUR AND 33 KV LINK LINE FROM VILL- NARAYANPUR TO SITE BHOURA DANDA PUMP CANAL 34.64 KM TURNKEY
MOEI & Fans i/c RMO pump set 125 KVA DG Set, Compact Type Sub station & Fire Fighting equipment & EPABX System & UTRC Gomti Nagar, Lucknow (SH:- Maintenance of EI & Fans, Street light, pump sets i/c operation of pump set, DG Set FAS and Down comer system).
Construction of Office Building for Central Administrative Tribunal (CAT), Lucknow Bench, including Internal Electrical Installation, Fire Fighting System, Fire Alarm, VRV/VRF System, EPABX System, DG Set, Sub-station, Lifts, Water Supply and Horticulture work at Gomti Nagar, Lucknow, (UP). (SH: Providing services of Unskilled Persons)
1 MOEI AND FANS COMPOUND LIGHTS/STREET LIGHT AT CPWD TRAINING INSTITUTE GHAZIABAD 2 MOEI AND FANS COMPOUND LIGHTS SUB STATION AND RMO WTAC STAC UNIT AT CGO 1 AND GPO BUILDING GHAZIABAD SH SITC OF SPLIT AND WINDOW AC WITH ACCESSORIES AND OTHER MISC ELECTRICAL WORKS
RMO of General Pool Office Accommodation including water supply, sanitary installation, internal electrical installations, fire fighting system, fire Alarm, Sub station, DG Sets, Lifts and Mechanical Ventilation at Fazalganj, Kanpur (UP) (SH:- Comprehensive Maintenance and operation of 3 x 250 TR HVAC System) (For 2 years)
MOEI AND FANS, RMO PUMP SET, DG SETS, SUB STATION AND COMPOUND LIGHT IN EPFO AND RESIDENTIAL COMPLEX AT JAGRITI VIHAR MEERUT DURING THE YEAR 2023-24 SH ROUTINE MAINTENANCE OF EI FANS IC OPERATION OF PUMP FOR RESIDENTIAL AND NON RESIDENITAL BUILDING OF EPFO MEERUT
maintenance of 125 KVA dg set 8 passenger lift 2 nos sub station with 2 no transformer and vcb fire alarm and wet riser system in central excise custom building gulistan bhawan gorakhpur SH SITC of intelligent Adressable fire alarm system at custom building gulistan bhawan Gorakhpur
C/o Office Bldg. for Central Excise and Custom, DRI, CBN, NACEN etc i/c water supply, sanitary installation, internal Electrical Installation, Fire Fighting System, Fire Alarm System, Sub station, DG Set, Lift, HVAC and UPS at Vibhuti Khand Gomti Nagar, Lucknow. (SH:- SITC of BMS System)
TENDER NO. 84(W)/EDD-III/18-19 REGARDING Stranthning of 33 KV Mliyana line, ERECTION OF POLE IN LONG SPAN, STRAIGHTING OF POLES, CROSS ARM, RESASSING OF LOSS SAG ETC for 33/11 KV Sub-Station, Maliyana under EDSD-I Maliyana of EDD-III MEERUT
replacement of jar jar wire replacement of damaged Insulators and Cross Arms in 11 KV and LT lines feeding to 44 JB STW Village Sangli fed from 11 KV feeder Senga Sengli emanating from 33 11 KV Sub Station Pipala and Providing of pole support in lo
E-TENDER SPECIFICATION OF TENDER NO-41(W)/18-19 REGARDING CONSTUCTION OF NEW AND OLD LINE AND RELESE NEW CONNECTIONS UNDER DEPOSIT WORK AT 33/11 KV SUB-STATION KARNAWAL, KAITHWARI, ROHTA AND BHOLA IN THE AREA OF EDSD-III, BHOLA UNDER EDD-III, MEERUT.
THE 132 KV SUB STATION WHICH IS LOCATED ON KHATAULI BHUDHANA ROAD ON THE DAMEGE 33 KV XLPE CABILE LINE GOING TO TODA AND GOAYLA NH 58 UNDERPASS THE COMPLETE WORK OF CONNECTING WITH THE CLAMP ON THE NEW XLPE ON THE WALL UNDER EDD KHATAULI
For Construction of New 11/0.4 KV, 250 KVA LT Sub-Station and Construction of 11 KV Line and LT Line Near Sri Ajay Singh House Picnic Spot Gate Faridi Nagar in Business Plan Pkg NO-105/2017-18 under the area of EUDD-Munshipulia, LESA Lucknow
sub-station, at different locations in Vyapar Vikas Nidhi 2016-17 against sanction package No-88, 89, 90, 91, 92, 93, 94 and 95/2016-17 and other associated works in the area under EUDD Indira Nagar in the Jurisdiction of S.E., EUDC-9th,LESA, Lucknow
Short tern E-Tender for Supply of 13 Nos. skilled, 25 Nos. semi-skilled and 04 Nos. SSO Skilled Labour (work including of line and sub-station) at 33/11 KV S/S Sahara State and G.P.R.A for 12 Months, Under the area of EDD-B.K.T.
Supply OF Nut and Bolt at 132 KV substation Rudhauli under Electricity Transmission Division-II Basti.
As per tender documents
Refer to Tender Description
Electrical component, Terminal component, Aluminium alloy, Isolator terminal, Double CB, ACSR Zebra Conductor, Isolator Jaw, Double Isolator, Isolator Blade, Double CT Terminal connector, Double Isolator connector, 33kv Isolator Jaw
Various make 11 KV VCB/OCB Testing Work installed at various 33/11 KV Sub-Stations Under EDD-IV, Goverdhan, Mathura
Various make 11 KV VCB/OCB Testing Work installed at various 33/11 KV Sub-Stations Under EDD-II, Kosikalan, Mathura
Work for Running Maintains of Electrical/Mechanical/Protection System of VCB Installed at 33/11 kv sub-stations in EDSD-IV Churiyani, under EDD-I, Fatehpur
Work of removing damaged mechanical relays of incoming and feeders and repairing damaged wiring by removing damaged mechanical relays of incoming and outgoing power sub-stations in the area of work of 33/11 KV power sub-stations of EDD-V, Bulandshahr
For The Re-Construction of Badly Damaged Plinths of 2x400 KVA 11/0.4 KV Sub-Stations in Mohalla Karim Nagar Naala and other Misc. Works in the Area of 33/11 KV Sub-Stations Hapur Road, Under EUDD-III, Meerut, Under EUDC, Meerut.
The work of removing the damaged master relay of 11 KV incoming and feeders installed at the sub-stations and installing new master relay and wiring at 33/11 KV power sub-stations in the jurisdiction EDD-Shikarpur, Bulandshahr by ETD-III, Bulandshahr
Security Manpower Service (Version 2.0) - Substation Premises; Unarmed Security Guard, Security Manpower Service (Version 2.0) - Substation Premises; Armed Security Guard
Online Portable Moisture Measurement Kit (PPM Kit) for various substations in NR-I region, POWERGRID
Increasing Capacity of 33/11 KV Substation Khurrampur from 2x5 MVA to 1x10puls1x5 MVA
Increasing Capacity of 33/11 KV Substation kakori from 2x5 MVA to 1x10puls1x5 MVA
Increasing Capacity of 33/11 KV Substation Mall from 1x10plus1x8 MVA to 2x10 MVA
TESTING, SERVICING, REFILLING AND REPLACEMENT OF WORN OUT PIPE/HORN CLIP ETC. OF FOLLOWING EXTINGUISHERS INSTALLED AT VARIOUS 132 KV SUBSTATIONS UNDER ELECTRICITY, TRANS. DIVISION-I, VARANASI.
Attending the SF6 Gas leakage of 145 KV CB and other miscellaneous work at 132 KV Sub Station Medical College and 220 KV Sub Station Partapur Jagriti Vihar under ETD Meerut
Construction of proposed 33 KV FARIHA Line from 132 KV Sub-Station FARIHA to existing 33/11 KV Sub-Station Fariha with LILO System in District-FIROZABAD, on (Semi-Turnkey Basis)
CONSTRUCTION OF TOILET AT 33/11 KV ELECTRICITY SUB-STATION JAKHLAUN AND ROOF TREATMENT OF QUARTERS AT 33/11 KV ELECTRICITY SUB-STATION TALBEHAT AND OTHER ASSOCIATED CIVIL WORKS DISTRICT-LALITPUR.