Loading…
Loading…
7,394 results • Best match
Installation of 12 nos Chemical earth pit at 11KV Main Substation of Bonjemihary colliery under Salanpur Area.
Repairing and extension of electrical substation shed at KC Paul unit of Madhabpur Colliery under Kajora Area
Repairing of two (02) number electric substation in R-III/II seam of Khottadih Colliery, Pandaveswar Area
Installation of underground substation at 38R and 29L at millennium incline of Shankarpur Colliery under Bankola Area .
ewinding/repairing of 1000 KVA, 11KV/3.3KV Power transformer at Millennium Incline surface substation, under Bankola Area
Repair and Maintenance of Control room building of Sitalkuchi 33/11 KV Substation under Mathabhanga division WBSEDCL
Supply and fixing of insulating mat in substation of different underground and opencast mines of Pandaveswar Area.
Trench Cutting to dry Water logged area aound 2 MVA SubStation Laikdih under C V Area BCCL
Construction of New Store Stack Yard partly open and partly shed at Rejinagar 220 KV substation WBSETCL
Construction of 3 nos. substation room along with approach road and boundary wall at Satgram Area HQ
Construction of electrical substation in underground at 5D-6D43EL in Bogra RVI seam at Pure Searsole Colliery
Providing fitting fixing chain linked fencing and some allied works surrounding of 33.33KVA Substation at Kalidaspur Project
Providing APP over grading concrete at Entrance Canopy & Electrical Substation and Miscellaneous works at MMD, Hastings, Kolkata.
Repairing work of abandoned Dormitory Building inside the Harischandrapur 132/33 KV GIS Substation Premises, District - Malda
AMC of EI works incl. Substation and operation of Silent D.G. set at Mal SDH, Malbazar, Jalpaiguri.
Re-routing, transportation and laying of 6.6KV grade, 185 sq. mm, DWAPVC cable of LWF-1,2,3 from -10L and -11L substation to 12L substation for Longwall panel-7 and 7A in R-VI seam, Sector-A at MIC, Jhanjra Area.
MOEI & Fans, substations and street light i/c electric consumption charges for GPRA at Tollygunge, Kol-40. (SH: Overhauling, Dehydration and servicing of Oil type transformer etc as required.)
Augmentation & Improvement of Electrical Substations, Switch Rooms with associated HT/LT switchgear panel, cables, Transformer, Earthing & other safety items under the jurisdiction of SSE/G/KWAE & SSE/G/RPH".
Thorough repair and maintenance of roof by laying APP Membrane and roof shedding of parapet walls and Washroom of Control Room Building at Chalsa 132KV Substation under Jalpaiguri Area Office, WBSETCL
Operation an maintenance of Pumping Machinaries , Sub-Station(11/0.433 KV ,2 x 315 KVA Transformer), Yard Lighting and Gaseous Chlorination system at Head Works Site at Bhaburia mouza under Gourbazar-Ichapur an Jamgara-jagannathpur Water Supply
Construction of Two numbers Electric Sub-Station for WTP and Pit Line and Nine numbers biodigester at different location along with one UV tank at Shalimar Station in Howrah District for South Eastern Railway in West Bengal
2nd call for the work of Laying of 33KV UG Cable of R/L 2.312 km for new 33 KV line from Raghunathganj 132/33 KV GSS to Ahiran 33/11 KV Sub-Station under Raghunathganj Division.
Annual Comprehensive Maintenance of all kind of Electrical Installation an 11kV Sub-station including operation of 160kVA D.G. set of Burdwan Medical College, Nursing Training School , College of Nursing an Tertiary Cancer Care Center including all S
Annual maintenance and repairs for Civil Work at different Depot Sheds, Bildig, Sub-Station Bldgs including HO Building and shed within Nonapukur Workshop. North Zone Phase - I -Belgatchia, Galiff Street, Bag Bazar, Shyambazar, New Town pride hotel
Laying of 33 KV 3 core 400 SQMM XLPE UG cable by micro tunnelling method for drawl of new 33 KV line for Bantala Gangajoara 2nd Circuit of Gangajoara 33 11 KV Sub Station under Garia Division.
Maintenance n repairs for Sanitary n Plumbing Work at different Depots, Sheds, Buildings and Sub-Station Buildings at North Zone (Nilgunge Depot, Central Workshop Complex, Belghoria Dpt, Paikpara Depot, Dum Dum Bus Terminus, Ariadaha Bus Ter. CSTC
Annual Electrical Maintenance of street lights of different roads at Howrah side related to Vidyasagar Setu and routine maintenance of electrical installation of Sub-station at Howrah side under HRBC from 01.01.2025 to 31.12.2025, i.e.12 months
academic building including S P work, glowsign board, UG OH water resorvoir for domestic use, U.G resorvoir for Fire fighting internal road, campus drain, sub station, internal external electrical works at Birla Institute of Technology-(A) Cons
Laying of 33 KV XLPE 3C X 400 Sq.mm Cable for drawal of New 33 KV Kultolia 2nd source from Contai 132 GSS to Kultolia 33/11 KV Sub - Station of Contai Division under Purba Medinipur Region.
Electrical Augmentation of LT and HT System at kalyani University Supply and laying of 2 run 300 sqmm XLPE insulated cable from proposed New sub station to Different Buildings of Kalyani University under Kalyani ES No II
Operation and Guarding of pumping machineries, and 2 x 630 KVA, and 2 x 800KVA sub-station SCADA system and other Electro mechanical installation at Plasto Industrial park Water Supply Scheme under Bankura Mechanical Division, P.H.E. Dte
Operation, and Guarding of pumping machineries and Sub-Station Equipments at CWR site of Puncha and Adjoining Mouzas Sub-Surface Water Based Piped Water Supply Scheme (BRGF Phase-I) under Bankura Mechanical Division, P.H.E. Dte. Block Onda
Providing and installation of Sub-Station Equipment and other electromechanical accessories for source Augmentation works for Barjora water supply scheme (Left out mouzas of Barjora Block under BRGF Phase I)( Zone II) At Damodhar River Bank site
Providing Electro-Mechanical Equipment for 11/0.433 KV Sub-station along with pumping station and disinfection arrangement for GLR-I at Kamgachi under Surface based Water Supply Scheme for Ranaghat-I Block in the District of Nadia.
Maintenance n repairs for Civil Work at different Depots, Sheds, Buildings and sub Station Buildings at Central Zone (Hwh Depot, Salt Lake Depot, Manicktala Depot, CTO / Maidan Tent, Kasba Depot, Ballygunge Bus Terminus, Ultadanga Bus Terminus, CSTC
Construction of Paver Block Road from New Mal Junction Sub-Station to new Creche House via Khal line at Needam TG within Rungamuttee GP, Mal Block in the District of Jalpaiguri. (Length-2050.00 m, Width-3.30 m)
Operation, and Guarding of pumping machineries and Sub-Station Equipments at Intake (Raw water) pumping station near Durgapur Barrage Block Borjora, Dist Bankura under Bankura I ,II and Borjora Block Surface Water Based Piped Water Supply Scheme
Operation maintenance of Clear water Pumping machineries (Capacity of 27.5 MLD), Sub-station (11/0. 433KV, 2 X 500KVA), Sludge pump and other electrical -mechanical accessories at Mathurapur Treatment Plant of Northern Sector under Malda Arsenic A
Supply, Installation, Testing and Commissioning of fire detection and alarm system at central library building, canteen building, sub-station bldg and several areas of other buildings within the college campus of CNMC and H, Kolkata. (Electrical Work
Surveying,Planning,Designing,Const. 2Nos.11KVA IndoorType Sub-Station Building......incl.3months defect liability period 1year maint. i)Ashoknagar ii) Bagna Surface Water Based WS Scheme Habra-Gaighata adjoining mouzas in the District of North 24-Prg
Operation, and Guarding of pumping machineries and Sub-Station equipments at intake and H/L pumping station under Dahala Sub Surface Water Based Piped Water Supply Scheme Block Ranibandh (BRGF Phase I) under Bankura Mechanical Division, PHED
Operation and maintenance of 1 x 315 KVA Sub-Station and other electrical accessories of R.O. based fully automatic drinking water bottling plant at Itahar in the district of Uttar Dinajpur under Malda Mechanical Division, PHE Dte.
Maintenance and repairs for Civil Work at different Depots, Sheds, Buildings and Sub-Station Buildings at SouthZone (Thakurpukur Depot, Taratala Depot, Garia Depot, Lake Dpt, Thakurpukur 3A Bus Terminus, Behala 14 no. Bus Terminus, Sarsuna Bus CSTC
APAS CODE- APAS-01-252-53-0001-Repairing of CC Road from Sub Station More towards Sandip Mandal house at Panchbaga, Mouza- Panchbaga , J.L No.225 Under Junbedia Gram Panchayat Of Bankura-II Panchayat Samiti, Dist.-Bankura.
REPLACEMENT OF THE LEAD ACID BATTERY BANK (YKP-9) ALONG WITH THE RESTORATION OF THE AUTOMATICE FLOAT CUM BOOST BATTERY CHARGER CONTROL PANEL ATTACHED WITH THE 6 KV SWITCHGEAR SYSTEM UNDER 33/6 KV SUB STATION, IGWTP.
Operation, and Guarding of high lift, low lift pumping station and sub-station equipments at CWR site of Lurka and Adjoining Mouzas Water Supply Scheme in the Block-Raipur Dist Bankura under Bankura Mechanical Division, P.H.E. Dte.
Operation, and Guarding of pumping machineries and Sub-Station Equitments at Intake (Raw water) pumping station near Durgapur Barrage Block Barjora, Dist- Bankura under Bankura -I ,II and Barjora Block Surface Water Based Piped Water Supply Scheme
Raising height of existing boundary wall and plumbing works related to installation of Geyser and Aqua guard at Hostel Building of EETI Burdwan in the premises of Hatgobindopur 33 11 Kv Sub Station at Hatgobindopur, Dist.Purba Bardhaman
Operation, and Guarding of high lift, low lift pumping station and sub-station equipments at CWR site of Lurka and Adjoining Mouzas Water Supply Scheme in the Block Raipur Dist Bankura under Bankura Mechanical Division, P.H.E. Dte.
Supply and Installation of 02 NOS. NEW 33/11 KV GIS SUB-STATION AND ASSOCIATED 33 KV and 11 KV LINES THROUGH FULL TURNKEY MODE FOR EXECUTION OF WORK IN JALPAIGURI REGION OF WBSEDCL IN WEST BENGAL