Loading…
Loading…
6,501 results • Best match
Preparation of GIS based Property tax Register by conducting GIS based Multi-Purpose Household Survey, Integration and Technical Handholding Support including Training
Custom Bid for Services - Detailed Geotechnical Investigation work for underground section on alignment between Sarai Kale Khan (SKK) Namo Bharat station to Gurugram border Similar Category GIS related Survey Services Hiring of GIS Implementation Agency for Survey, Software Development and Master Planning related activities
Custom Bid for Services - Detailed Geotechnical Investigation work for underground and Elevated section on revised alignment between Haryana Border to Kherkidaula and Dharuhera Depot Similar Category GIS related Survey Services Hiring of GIS Implementation Agency for Survey, Software Development and Master Planning related activities
Custom Bid for Services - SURVEYOR FOR STS OPERATION- Mother Vessel, Custom Bid for Services - SURVEYOR FOR STS OPERATION- Daughter Vessel Similar Category GIS related Survey Services Survey or Market Research Services/Program evaluation or ... assessment survey services /Feedback ... related Survey Services Survey ... assessment survey services /Feedback
Custom Bid for Services - DGPS Field Survey&Site Mapping Works WP, Custom Bid for Services - DGPS Field Survey&Site Mapping Works YP Similar Category GIS related Survey Services Survey or Market Research Services/Program evaluation or assessment ... assessment survey services /Feedback ... related Survey Services Survey ... assessment survey services /Feedback
Custom Bid for Services - Survey and supervision of containers containerized cargo covering Indias West Zone Ports and associated CFS ICDs and SCIs depot Similar Category GIS related Survey Services Hiring of GIS Implementation Agency for Survey, Software Development and Master Planning related activities Containers Compute Service
Custom Bid for Services - Consultancy services for Preparation of detailed Project which includes services like site clearance, Geotechnical investigation, Topographic survey, Architectural drawings structure analysis and drawings, 3D modelling (Baff.. Similar Category Project Management Consultancy (PMC) Service for NHAI
Conducting Traffic Census nad Axle Load Survey and Topographic Survey at Gobindapur By Pass to Mukundapur Road via Baganchra Bhaluka from 5.50 KM to 19.95 KM of Ranaghat Highway Sub-Division under Nadia Highway Division NoII PW(Roads) Dte
As per BOQ
Formation of 4 lane Bypass Road Road Peddapally District HQ Peddakalva village to Appannapet village from Km 4/0 to 8/0 along with central lighting (Connecting in between JHKR from Km 192/0 to 203/0) along the HMWSSB pipe line in Peddapally District. ... conducting Topographical survey , ...
Formation of 4 lane Bypass Road Road Peddapally District HQ Peddakalva village to Appannapet village from Km 0/0 to 4/0 along with central lighting (Connecting in between JHKR from Km 192/0 to 203/0) along the HMWSSB pipe line in Peddapally District. ... conducting Topographical survey , ...
Formation of 4 lane Bypass Road Road Peddapally District HQ Peddakalva village to Appannapet village from Km 8/0 to 12/0 along with central lighting (Connecting in between JHKR from Km 192/0 to 203/0) along the HMWSSB pipe line in Peddapally ... conducting Topographical survey , ...
Custom Bid for Services - Carrying out depth survey of Riverbedmainline profile at critical washout prone river crossingsHDD portion at perennial type river crossing under WRPL Similar Category GIS related Survey Services Hiring of GIS Implementation Agency for Survey, Software Development and Master Planning related activities
Carrying out survey work and geometric design for improvement of alignment and preparation of along including road sinages at different chainages of NH 55 Location 20nos., along with submission of Road Safety Report from chainage 40.00Kmp to 77.00
Preparation of detailed project report (DPR) of pumping system, pipe distribution network and micro irrigation network design work and command area survey work (Cluster 01 to 06) of Pailani Barrage under Ken Betwa Link Project in Banda district.
Rejuvenation Of Waghadi River and Arunavati River By Nalla Widening and Deepening at village Yerandgaon to Zatala , Parawa to Waghara , Mahalungi Chikani, Parsoda and Kathoda Nalla, Tiwsa, and Yerad , and Pipe Inlet and Survey work of Nalla Deepening
Digital survey work at Coochbehar Industrial Park(Phase I and II) of WBIIDC at Coochbehar of West Bengal showing all permanent and general features i.e. road, pavement, drain, nallah ,water bodies, temple, masjid , electrical towers, O.H.R., pump h
Survey work with DGPS and GIS mapping of JDA land and Preparation of Site Contour Plan marking of existing structures and Physical features, reference points for a period of one year within jurisdiction of JDA Division No.I Jammu
Preparation of detailed project report (DPR) of pumping system, pipe distribution network and micro irrigation network design work and command area survey work (Cluster 01 to 06) of Banda Barrage under Ken Betwa Link Project in Banda district.
Custom Bid for Services - HIRING OF 01 PRIVATE VEHICLE FOR TRANSPORTATION OF PERSONNEL FROM CAMP TO DRILL SITE GEOLOGICAL SURVEY WORK AND ESSENTIAL ADMINISTRATIVE WORK OF RESIDENT GEOLOGIST HURRA KI DHANI PROSPECT DIST JHUNJHUNU RAJASTHAN FOR A PERIO..
Custom Bid for Services - HIRING OF 01 PRIVATE VEHICLE FOR TRANSPORTATION OF PERSONNEL FROM CAMP TO DRILL SITE GEOLOGICAL SURVEY WORK AND OTHER ESSENTIAL ADMINISTRATIVE WORK OF RESIDENT GEOLOGIST ROHIL PROSPECT KHANDELA DIST SIKAR RAJASTHAN FOR A PE..
SURVEY WORK WITH PREPARATION OF D.P.R. FOR CONSTRUCTION OF CHITRANGI TO GADAWA KUDARI DEVI MANDIR U.P. BORDER ROAD (MP-MDR-12-03) LENGTH 44.50 KM. FOR PROPOSED 2-LANE ROAD, UNDER PWD SUB DIVISION CHITRANGI DISTT- SINGRAULI (M.P.)
Digital survey work at Falta Industrial Parks of WBIIDC at South 24 Parganas of West Bengal showing all permanent and general features i.e. road, pavement, drain, nallah ,water bodies, temple, masjid , electrical towers, O.H.R., pump house etc . an
Construction of ROB in lieu of LC No.107T across railway line at Km.493/1-2 of Kazipet-Vijayawada section in Km.0/4-6 of Ramakrishnapuram-Peddagopathi road in Khammam District Sub-work:-Pre survey work
Engagement of consultant for the survey work, preparation of DPR etc for the installation of street light, energy meter, CCMS panels for smart lighting system, Establishment of Command and Control Center for IT infrastructure to monitor Smart light
Survey work with DGPS and GIS mapping of JDA land and Preparation of Site/Contour Plan, marking of existing structures and Physical features, reference points for a period of one year within jurisdiction of JDA Division No.I, Jammu
Custom Bid for Services - Outsourcing of Survey Work including topographical and geological mapping with total station including DGPS control survey Fixing of location of boreholes and Levelling for 08 numbers of M IIA projects comprising 34 point 91..
Custom Bid for Services - 200154477 Hiring of survey team for monthly coal stock verification and other Civil related survey work of VSTPS for the year 2026-28 of VSTPP Similar Category Operation and Maintenance Power House/Power Plant
Appointment of external agency for carrying out different survey worksof Dulanga Coal Mining Project for a period of 3 years
Appointment of external agency for carrying out different survey worksof Chattibariatu for the period of 3 years
Hiring of Consultants - Milestone/Deliverable Based - Structural Design, Topographical Survey, Soil Investigation and Estimate on SSR 2020, Abstract & Yardstick including BOQ and Current Market Rate analysis for Provn of Fmn Amn Storage Facility (FA..
Engineering Study including Road Inventory, Topographical Survey, Traffic Study, Pavement Soil Investigation etc. and submission of Reports for Boinchee Bhastara Majinan Belmuri Road from 0.00 Kmp. to 11.30 km. under jurisdiction of HHD I
Engineering Study including Road Inventory, Topographical Survey, Traffic Study, Pavement Soil Investigation etc. and submission of Reports for Moshat - Dhitpur Road from 0.00 Kmp. to 11.26 km. under jurisdiction of Serampore Highway Sub-Division
Geotechnical Sub Soil Investigation and Topographical Survey by Total Station machine for all wings of Public Works Department (Building and Road works) in the District of Darjeeling and Kalimpong for the year 2025-2026.
Assessment of present cross sectional profile with topographical survey of chemaguri khal at kakdwip Block at south 24 Parganas District under Kakdwip Drainage Division I W Dte to be conducted by River Research Institute
Geotechnical Sub Soil Investigation and Topographical Survey by Total Station machine for all wings of Public Works Department (Building and Road works) in the District of Darjeeling and Kalimpong during the year 2023-2024.
Assessment of present cross sectional profile with topographical survey of Chemaguri khal within kakdwip Block at south 24 Parganas District under Kakdwip Drainage Division I W Dte to be conducted by River Research Institute
Traffic survey, Details Soil investigation, topographical survey Pavement condition Survey(FWD) an Preparation of Detailed Project Report (DPR) for Strengthening of Panrui-Bramhandihi-Koyra Road from 0.00 to 14.83 km, under Birbhum Highway DivisionII
Assessment of present cross sectional profile with topographical survey of Banpahar Khari Kajol Khari and Madhabpur Khari at Bamangola Block at Maldaha District under Maldaha Irrigation Division North Irrigation Circle I I W Dte
NIW for the work Construction of office Building cum Residential Quarters for subsidiary intelligence Bureau at Nuaguda, Nabarangpur. Subwork/Packages: Carrying out soill investigation and topographical survey at SIB at Nuaguda. Dist. Nabarangpur, Odisha
Assessment of present cross sectional profile with topographical survey of Baldeghata Khal within Gaighata Block at North 24 Parganas District under Bidyadhari Drainage Division I W Dte to be conducted by River Research Institute
Assessment of present cross sectional profile with topographical survey of Tepridaha Khari Kuribari Khari and Katabari Khari at Bamangola Block at Maldaha District under Maldaha Irrigation Division North Irrigation Circle I I W Dte
Consultancy Services for carrying out Falling Weight Deflectometer Test over Flexible Pavement, 7 Day TrafficSurvey,Topographical Survey, Axle Load Spectrum Survey, Existing Road Crust profiling as per relevant IRC guidelines for 02 (Two) roads.
Preparation of Detailed Project Report along with Topographical Survey, Soil Investigation, Traffic Survey and Axle Load Survey etc related to the work Belpahari-Banspahari Road from 12.00 KMP to 23.80 Km, Widening and Strengthening
Preparation of Detailed Project Report along with Topographical Survey, Soil Investigation, Traffic Survey and Axle Load Survey etc related to the work Gopiballavpur-Nayagram Road (SH-9) 35.00 Kmp to 41.60 Km Strengthening work
Custom Bid for Services - CPCLY26003 - Fugitive Emission Survey (Leak Detection and Repair - LDAR) at CPCL Manali Refinery Similar Category Repair and Overhauling Service Survey or Market Research Services/Program evaluation or assessment survey services/Feedback...
Providing Detailed Survey Plan and Demarcation of Road / Land on site on Yearly Basis for Year 2022-23
GPSSystem (Q3), GPS For Field Survey Work (Q3)
SURVEY WORK FOR TRANSMISSION MAIN AND DISTRIBUTION SYSTEM
SURVEY WORK FOR TRANSMISSION MAIN AND DISTRIBUTION SYSTEM