Loading…
Loading…
529 results • Best match
Conducting survey work on Rupnarayan river from Jossar to Denan for a length of 15.20 km in Block and P.S Kolaghat under East Midnapore Division 2nd Call
Conducting survey work on the 5 nos Canals for Udaipur Khal Kalaichandi Khal Maheshpur Khal,Baharaboni Khal and St.Joshep Hospital Khal in Block Midnapur Sadar Dist. Paschim Medinipur.
Survey works for hiring of miscellaneous supportive survey ancillaries at different work sites throughout the West Bengal for the one year under River Research Institute Irrigation Waterways Department Govt of West Bengal Mohanpur Nadia
Data entry operation for IMIS entry of all information collected during survey work of Schools, Anganwadies Centre, Health Care Institute etc. under Midnapore Division PHE Dte.(15.07.2024 to 14.07.2025)
Conducting survey work on the 4 nos Canals for Khalkona Khal Kamalpur Khal Ballar Khal and Local drainage channel Jamurai to Sandapur in Block Kharagpur I Dist Paschim Medinipur
Drone based survey work to identify and mapping all outfall/drains along both side of the River Ganga, from Kalyani to Diamond Harbor for pollution abatement work, 2nd call
Conversion of Border security fence from Ph-II to new design fence in between BP No. 846/7-S to 860/7-S - 6.080 km, BP No. 860/7-S to 876/2-S -12.20 Kms, BP No.876/2-S to 900/MP - 30.20 km, BP No. 900/MP to 925/MP - 1.00 km, BP No. 978/1-S to ... a topographical survey of ...
Conducting survey work on the 3 nos Canals for Mugdari Khal Sonamukhi Khal Khirai Khal and 1 no River for New Cossye River in Block Debra in Dist Paschim Medinipur
Conducting survey work on the 2 nos Canals for Gobardnan Khal Sila Khal and 3 nos river for Tamal River Parang Riverand Kubai River in Block Keshpur Dist Paschim Medinipur
Custom Bid for Services - Area survey, soil investigation and underground mapping for installation of pipelines and other infrastructure for sourcing Oxygen, Nitrogen and Argon gases from DSP to ASP Similar Category GIS related Survey Services
Survey works using Echo Sounder Total Station in remaining part of Paglar Baor Khal within Mouza Khardasingh and Kantabagan, Block Swarupnagar, North 24 Parganas. 2nd Call of e NIT No. 08 of 2025 26, Sl No. 03
Survey works using Echo Sounder Total Station for Jagannath Khal within G.P.Atpukur and Khasbalanda, Mouza Behari, Atpukur, Kachurhula, Saraberia, Samla,Roykhan and Haldaha, Block Haroa and Minakhan, North 24 Parganas. 2nd Call of e NIT No. 08 of
Construction of (G plus 5) Building for Structural Engineering Laboratory, Geotechnical Engineering Laboratory, Traffic Engineering Laboratory and Class rooms under Civil Engineering Department in the IIEST, Shibpur Campus, Howrah. Subwork/Packages: ... Digital Survey Works (Topographical).
Conversion of Border security fence from phase -ii to new design fence in between BP No 846/7-S to 860/7-S 6.080 kms, BP No 860/7-S to 876/2-S 12.20 Kms, BP No. 876/2-S to 900/MP 30.20 km, BP No. 900/MP to 925/MP 1.00km BP No. 987/1-S to 981/10-S ... a topographical survey of ...
Sub Soil Investigation and Survey work for various jobs of different Divisions under PWDte PW Roads Dte Social Sector in the district of South 24 Parganas District in the year 2023 24
Carrying out bank to bank cross section survey work of Dry Weather Flow Channel (5.950 KM) in KMC under jurisdiction of Calcutta Drainage Outfall Sub Division I of Calcutta Drainage Outfall Division.
Carrying out bank to bank cross section survey work of Suburban Head Cut Channel (7.315 KM) in KMC under jurisdiction of Calcutta Drainage Outfall Sub Division I of Calcutta Drainage Outfall Division.
Survey works for framing proposal for Construction of R.C.C bridge and culvert over 4 main canal, village canal and Pastubi Khal at different 5 five nos location in Mouza Gokulchak, Jalchak, Maligram and Ragpur, Block and PSPingla, DistPaschim Me
Carrying out detailed topographical and hydrographical survey work for Short Cut Diversion Channel from Ch 0.00m at Thalia to Ch. 11650m aBuxi within Amta Bagnan I Block Howrah District under Howrah Irrigation Division.
Carrying Out Cross section Survey Work of Faringachi Khal from Ch. 0.00 Muktarpur ) to Ch. 415.00 (UP Bansai ) for a length of12.65 Km within Mouza Koyeldanga , Mirpur , rameswarpur, Dharmadanga , Omorpur Digha , Kelenoi ,kushodanga
Carrying out bank to bank cross section survey work of Town Head Cut Channel (7.857 KM) in KMC, BMC under jurisdiction of Calcutta Drainage Outfall Sub Division I of Calcutta Drainage Outfall Division
Carrying out bank to bank cross section survey work of Dry Weather Flow Channel from Bantala to Ghusighata (27.080 KM) Under Calcutta Drainage Outfall Sub Division II , III of Calcutta Drainage Outfall Division
Survey works for taking Cross Section and Long Section of River Shilabati from Ch. 39.00 Km to 86.00 Km in connection with Re-excavation / Re-sectioning of River Shilabati in Blocks-Ghatal, Daspur-I Chandakona-I,II, PSs. -Ghatal, Daspur, Chandakona
Survey works using Echo Sounder Total Station of Patharghata Khal within Mouza Nalkora under Ward Nos. 2, 3 and 4, Basirhat Municipality, Block Basirhat I, North 24 Parganas,2nd Call of e NIT No. 08 of 2025 26, Sl No. 01
Soil Exploration and Survey Work for proposed Construction of new RCC Bridges over Darakeswar River at Moyal ,Blook-Khanakul-I,PS-Khanakul and over Rangabati khal at Gurulia Banstala,Block-Goghat-II under LDID
Preparation of Detailed Project Report including Survey work, Soil testing, Design etc. for Construction of Modern Integrated Tamliporia Fish Landing Centre at Vill-Purba Mukundapur,P.O.- Jhaugoria, P.S.-Digha Mohana Coastal, Dist.-Purba Medinipur
Carrying out detailed topographical and hydrographical survey work including Grain Size Analysis of Soil for 15 Nos Khal within Bagnan-I,II, Shyampur-I ,II Block of Howrah District under L.D.C Division for Dredging .
Survey work for Dakatia khal for a length of 45.00 km. by taking cross section across the khal by DGPS OR RTK in Blocks Jangipara, Tarakswar, Dhaniakhali, Haripal under Hooghly Irrigation Division. ( 2nd call)
Carrying out bank to bank cross section survey work of Feeder to Town Head Cut Channel (1.830 KM) in KMC under jurisdiction of Calcutta Drainage Outfall Sub Division I of Calcutta Drainage Outfall Division
Replacement of Border Fencing Phase-I (in between BP No. 798/MP to 830/7-S - 39.00 Km) to single row modular fence including earth work, culvert work, toe walls in various stretches of North Bengal Frontier in the State of West Bengal along ... a topographical survey of ...
Cross sectional survey work in between Ch. 30.00 and Ch 100 (Approx.length2.1 K.M) and inbetween ch .350 and Ch400 ( Approx. length 1.5 K.M ) On Cut-2 drainage channel in P.S and Block - Pandua Dist- Hooghly.
Survey work for Upper Harinakhali khal for a length of 15 KM by taking cross section across the khal at required intervals by DGPS OR RTK in Block - Pursurah under Hooghly Irrigation Division. (2nd call)
Survey works using Echo Sounder Total Station in 2 (two) nos. of drainage channels (Bhadrakhali and 1 Non I and W D Khal) within Mouza Ragunathpur and six others under Ward No. 16, Basirhat Municipality, Block Basirhat- II, North 24 Parqanas. 2nd C
Survey work and Hydrological obsevation on the rivers Bidya, Karatal and Durgaduani for proposed bridge over the river Bidya connecting Gathkhali and Gosaba at three locations and collection of suspended silt for methamatical modelling and installati
Post monsoon beach profile survey work of Digha sea beach from WB Orissa-Bengal border Udaypur Beach to Petuaghat Rasulpur River Mouth including renovation of automatic Weather Station at Digha meteorological Station Old Digha, Purba Medinipur
Survey work for Jora Khal, Y-channel, Hediarbad Khal, Jogendranagar Khal, Karatia River alongwith 9 nos Inlet channel collection of suspended silt load for methamatical modelling and installation of Gauges alongwith BM carry connection at differ
Day to day Survey work using Total Station and Auto level instruments and other moderate instruments, machinery alongwith Surveyor and Surveyor Assistant, Tools and Plants and machinery all complete for providing PHE Services at Action Area
Data Entry Operation for IMIS entry of all information collected during survey work of Schools, Anganwadies Centre Health Care Institution etc under Midnapore Division PHE Dte for the period of 06 months from 01.07.2023 to 30.06.2024
Field survey work in connection with Dredging /De-silting/Removal of river bed materials from river Shilabati from Bandar to Ramdebpur for a length of 23.00Km in Block- Ghatal , Daspur -1 Ghatal Municipality , PS- Ghatal Daspur
Survey work of Gunghir Khal for a length of 7.80 Km in between offtake point from Chandannagar Garh and outfall at Baidyabati Khal within Bhadreswar Municipality Baidyabati Municipality and Pearapur G.P. PS Bhadreswar and Serampore, Dist Hooghly
Dewatering, cleaning of bushes and shurbs, cutting trees before proposed survey work for the upcoming projects at KMDA Land near Mouza- Purba Barisha and Ors., J.L. No. 23, Dist. South 24 Parganas Western side of Keorapukur STP
Day to day Survey work using Total Station Auto level instruments and other moderate instruments, machinery alongwith Surveyor and Surveyor Assistant, Tools and Plants machinery all complete for providing PHE Services at Action Area-I,II , III
Day to day Survey work using Total Station , Auto level instruments and other moderate instruments, machinery alongwith Surveyor and Surveyor Assistant, Tools and Plants ,machinery all complete for providing PHE Services at Action Area-I,II , III
Carrying out bank to bank cross section survey work of Storm Weather Flow Channel (26.626 KM) from Bantala to Ghusighata Outfall in Block Bhangore-I,II, Haroa Under Calcutta Drainage Outfall Sub Division II , III of CDOD
Cross section and Long section survey work for De-siltation of Canal from Kuchitala to Chandpur Bamunia about 12.0 km at P.S- Jibantala, Block-Canning-II G.P-Sarangabad under Canning (1) Sub-Division of Joynagar Irrigation Division.
Day to day Survey work using Total Station Auto level instruments and other moderate instruments, machinery alongwith Surveyor and Surveyor Assistant, Tools and Plants machinery all complete for providing PHE Services at Action Area-I,II , III
Survey work for Augmentation for creation of FHTC (Functional House Hold Tap Connection in connection with Jal Jeevan Mission (JJM) for 10 nos. Mouzas of proposed Augmentation of piped water supply scheme for Beliatore and its adjoining mouzas
Survey work for computation of river depth characteristic by taking cross section at suitable interval by using Acoustic Doppler Current profiler (ADCP) method across the river up to 300.00 M along river Gobadia Kalnagini up to 60.00 M
Survey work of Jagaddal river from Ch. 13.30 KM to 14.60 KM at mouza- Dakshin Surendraganj for computation of river depth characteristic by taking cross secrion at required interval and velocity measurement by using Acoustic Doppler Current Profile
Survey work for Bartir Beel along-with 6 nos connected channel collection of suspended silt load for mathematical modelling and installation of Gauges along with BM carry connection at different points in Barrackpore area in the District North 24