Loading…
Loading…
3,723 results • Best match
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; ANNUAL RATE CONTRACT FOR ON SITE ISO CALIBRATION OF MASTER INSTRUMENTS OF INSTRUMENT WORKSHOP, AT RCF THAL, ON OPEN TENDER BASIS, FOR TWO YEARS; Buyer
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; ONSITE CALIBRATION OF LABORATORY EQUIPMENTS SUCH AS PRECISION BALANCES SIEVES HYGROMETERS MUFFLE FURNACE OVENS AND GLASS WARES IN CC LAB AT RCF LTD THAL O..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; AMC FOR CALIBRATION REPAIRING MAINTENANCE OF MS INDUSTRIAL SCIENTIFIC VENTIS PRO 5 MAKE MULTIGAS DETECTORS AT RCF THAL ON OPEN TENDER BASIS FOR TWO YEARS;..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; CONTRACT FOR CALIBRATION REPAIRING AND MAINTENANCE OF MS INDUSTRIAL SCIENTIFIC T 40 II RATTLER MAKE PORTABLE OXYGEN GAS DETECTORS AT FIRE AND SAFETY IN RC..
Biennial rate contract for quarterly Preventive Maintenance and Breakdown Maintenance with spares required if any of Weighing Machines, Yearly Calibration of Weighing Machines with MDL SB Pipe Shop to be carried out for a period of 2 years.
Provision of approaches for maintenance of equipment’s in tank lorry filling header , in HSD tank farm , at Fire water tanks , deployment of structural steel stands for controllers of EM locks & pipeline works at calibration tower at Haveli Installation
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Manufacturing Unit; E 5435 Overhauling, calibration and testing of ID fan turbine PGD governor of Woodward make in Ammonia-V plant of RCF Trombay Unit; As per sc..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; SERVICE CONTRACT FOR CALIBRATION OF HUMIDITY TRANSMITTER OF GTG WITH MECORD SYSTEMS AND SERVICES PVT LTD, IN SGP, AT RCF LTD THAL, ON PROPRIETARY BASIS, F..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; CONTRACT FOR CALIBRATION, REPAIRING AND MAINTENANCE OF M/S INDUSTRIAL SCIENTIFIC T 40 II RATTLER MAKE OXYGEN GAS DETECTORS, AT FIRE AND SAFETY, IN RCF THA..
74.36.03.058.5 PIPE SS GRTP304L SMLS TPI S40S 40NB, 74.33.05.076.5 PIPE AS A335GRP9 SMLS XS 50NB, 74.33.05.110.5 PIPE AS A335GRP9 SMLS STD 80NB, 74.33.05.260.5 PIPE AS A335GRP9 SMLS XS 200NB, 74.36.07.003.5 PIPE SS A312 TP304L PE NACE S40S 25NB, 74.36.03.074.5 PIPE SS GRTP304L SMLS S40S 50NB, 74.30.05.057.5 PIPE CS A106GRB SMLS S80 40NB, 74.36.03.022.5 PIPE SS GRTP304L SMLS S80S 15NB, 74.33.05.031.5 PIPE AS A335GRP9 SMLS S160 20NB
LT SANDWICH TYPE BUS DUCT, 6.6KV MV Cable Arm, LT Panel, Illumination Power Distribtn syst, Earthing and Lightning protection, EDG with AMF Panel, UPS System, DC Distribution system, Marshalling Panel, LT cables and accessories, Erection Hardware, ... software, Testing Services ,
Custom Bid for Services - Monthly Electrical Maintenance Services for 24 months, Custom Bid for Services - THERMOGRAPHY 4 times in 2 years, Custom Bid for Services - TESTING OF RELAY 2 times in two years, Custom Bid for Services - TESTING INSULATION ... - CALIBRATION OF ... - CALIBRATION OF ...
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; AMC FOR CALIBRATION REPAIRING AND MAINTENANCE OF DRAGER MAKE TOXIC GAS DETECTORS IN FIRE AND SAFETY DEPT AT RCF LTD THAL ON PROPRIETARY BASIS FOR TWO YEAR..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; ON LINE TESTING/CALIBRATION OF THE SAFETY VALVES IN THE METHYL AMINE STORAGE TANKS IN CGP, AT RCF THAL, ON OPEN TENDER BASIS, FOR TWO YEARS; Buyer
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; AMC FOR CALIBRATION REPAIR AND MAINTENANCE OF HONEYWELL MAKE BW SOLO PORTABLE CO METERS IN FIRE AND SAFETY DEPT AT RCF LTD THAL ON PROPRIETARY BASIS FOR T..
1) Supplying, Erecting, testing and commiss [Supplying, Erecting, testing and commissioning of set of Insertion Type Ultrasonic Flow Meter for CR Filter Plant Bhusawal with one year maintenance for line size 450mm, 350mm, 300mm and 200mm diameter ... CWPRS calibration per ...
1) Supplying, Erecting, testing and commiss [Supplying, Erecting, testing and commissioning of set of Insertion Type Ultrasonic Flow Meter for CR Filter Plant Bhusawal with one year maintenance for line size 450mm, 350mm, 300mm and 200mm diameter ... CWPRS calibration per ...
Digimatic Outside Micrometer Range 400-5 [Digimatic Outside Micrometer Range 400-500 mm, Similar to mitutoyo 340-521, with 4 nos. interchangeable anvils, Resolution 0.001 mm, Flatness 1 micrometer, setting standard 4 (400-475), micrometer head stroke ... NABL calibration certificate. ...
Digital buffer height gauge, Model BHG-3 (CBC).The gauge consists of a foldable track base & a vertical column fitted with a pointer. This column has a verticality bubble and is foldable for compactness. The height readings are displayed on digital ... furnish calibration certificate ...
5 KV Diagnostic insulation tester with 3x3 test leads for earth, guard & line connection 1.5 Meters AC mains chord, Main protected fuse, Calibration certificate from OEM/NABL/Govt. Approved Lab., Three programmable timers, modes for conducting IR, leakage current, PI, DAR, DD, SV & BDV test, CE, CAT-IV 600V, IP 65 compliance with latest IEC/IS standards, 1000V test result storage, Optical isolated RS 232 port & USB port, AC/DC measurement test Voltage 250- 5000V, Insulation resistance upto -10 Tera Ohm, Model no. 5KPI of M/s. Motwane make or its equivalent in Acceptable Makes: Kusam MECO/Fluke/Megger/Metravi/Meco only
1) Supplying, Erecting, testing and commiss [Supplying, Erecting, testing and commissioning of set of Insertion Type Ultrasonic Flow Meter for CR Filter Plant Bhusawal with one year maintenance for line size 450mm, 350mm, 300mm and 200mm diameter ... CWPRS calibration per ...
1) Supplying, Erecting, testing and commiss [Supplying, Erecting, testing and commissioning of set of Insertion Type Ultrasonic Flow Meter for CR Filter Plant Bhusawal with one year maintenance for line size 450mm, 350mm, 300mm and 200mm diameter ... CWPRS calibration per ...
Digimatic Outside Micrometer Range 400-5 [Digimatic Outside Micrometer Range 400-500 mm, Similar to mitutoyo 340-521, with 4 nos. interchangeable anvils, Resolution 0.001 mm, Flatness 1 micrometer, setting standard 4 (400-475), micrometer head stroke ... NABL calibration certificate. ...
1) Supplying, Erecting, testing and commiss [Supplying, Erecting, testing and commissioning of set of Insertion Type Ultrasonic Flow Meter for CR Filter Plant Bhusawal with one year maintenance for line size 450mm, 350mm, 300mm and 200mm diameter ... CWPRS calibration per ...
Pallet Truck (V2) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years Of Experience and Turnover Yes Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from ... Empanelled Inspection Agency /Authority ... 60 Quality Assurance Plan ...
Forklifts (V2) as per IS 6765:2003 and IS 10517 (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC) *In ... Empanelled Inspection Agency /Authority ... RITES Quality Assurance Plan ...
Financial Advisory Services - Onsite; Tax Advisory
Financial Audit Services - Audit report; CA Firm
Custom Bid for Services - Preventive Maintenance for Instron make UTM Mode No 4467 for 1st year, Custom Bid for Services - Preventive Maintenance for Instron make UTM Mode No 4467 for 2nd year, Custom Bid for Services - Preventive Maintenance for ... - Calibration for ... - Calibration for ... - Calibration for ...
AS PER TENDER DOCUMENTS
AS PER TENDER DOCUMENTS
CARRIER GAS CYLINDER NITROGEN HAVING THE PURITY OF 99.9992 of Grade 5, CARRIER GAS CYLINDER HYDROGEN GRADE 5.0, PURITY 99.999, CALIBRATION GAS WITH FOLLOWING COMPOSITION: CO: 2 PPM, CO2: 3 PPM, CH4 1%, N2: 20% & BALANCE: H2, CARRIER GAS CYLINDER ARGON GRADE 6, PURITY 99.9997%
1 Repairing of AVL Make Engine Dynamometer Controller No GK0212R F FEM-CON 6260 16 100 0 SAC code 998717 Qty 01 job 2 Charges for Installation of Controller F Fem con and configuration and re calibration of engine dynamometer Make AVL Model Alpha80
Custom Bid for Services - Installation, calibration, testing & commissioning of various instruments & control elements with associated fabrication & installation of mounting- structures, cutting & welding on SS pipe lines, installation of SS tubings &.. Similar Category Piping Erection Service Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2)
AS PER TENDER DOCUMENTS
Toner Cartridges/Ink Cartridges/Consumables for Printers (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller OEM Authorization Certificate, Additional Doc ... Empanelled Inspection Agency /Authority ... ONGC QUALITY ASSURANCE DEPARTMENT ...
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Exemption for Years Of Experience Yes | Complete Startup Exemption for Years Of Experience Yes | Complete Document required from seller Certificate (Requested ... Empanelled Inspection Agency /Authority ... 60 Quality Assurance Plan ...
Toner Cartridges/Ink Cartridges/Consumables for Printers (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller OEM Authorization Certificate, Additional Doc ... Empanelled Inspection Agency /Authority ... ONGC QUALITY ASSURANCE DEPARTMENT ...
V - Belts - Endless Narrow V - Belts for Industrial use as per IS 14261 (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Additional Doc 1 (Requested ... Empanelled Inspection Agency /Authority ... ONGC QUALITY ASSURANCE DEPARTMENT ...
Steel Shelving Cabinets (Adjustable Type) confirming to IS 3312 (V3) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years Of Experience and Turnover Yes Document required from seller Certificate (Requested in ATC) ... Empanelled Inspection Agency /Authority ... 60 Quality Assurance Plan ...
Toner Cartridges/Ink Cartridges/Consumables for Printers (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller OEM Authorization Certificate, Additional Doc ... Empanelled Inspection Agency /Authority ... ONGC QUALITY ASSURANCE DEPARTMENT ...
All in One PC (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 ... Empanelled Inspection Agency /Authority ... RITES Quality Assurance Plan ...
roofing fabrics pbs roll Roofing Fabrics Pbs Roll ( 1000 ) Technical Specifications Specification Specification Name Values Allowed Values Specification Conforming to Indian Standard IS : 1322: 1993: latest Yes - ISI Marked false - CML Number 0 - ... Aglow Quality Control Labotary ...
Set of Digital micrometer consisting 01 [Set of Digital micrometer consisting 01 Nos. each of 1) Outside micrometer Range 0-150mm. 2) Outside micrometer Range 150- 300mm 3) Tubular inside micrometer, Range:- 150-1000 mm. The Specification for each ... and calibration test ...
DESIGN, SUPPLY, ERECTION, TESTING AND COMMISSIONING OF AIR DRYER TEST BED AS PER RDSO's TECHNICAL CIRCULAR NO. RDSO/2011/EL/TC/0108, REV 0 DATED 07.03.2011. AIR DRYER TEST BENCH SHOULD BE PLC BASED MODEL AND THE TEST BENCH SHOULD HAVE DATA ... ENCLOSED. CALIBRATION CERTIFICATE ...
DESIGN, SUPPLY, ERECTION, TESTING AND COMMISSIONING OF AIR DRYER TEST BED AS PER RDSO's TECHNICAL CIRCULAR NO. RDSO/2011/EL/TC/0108, REV 0 DATED 07.03.2011. AIR DRYER TEST BENCH SHOULD BE PLC BASED MODEL AND THE TEST BENCH SHOULD HAVE DATA ... ENCLOSED. CALIBRATION CERTIFICATE ...
Supply of HC LEL Open Path Gas Detector along with all required interconnecting triad cables and glands, calibration kits, alignment kits, etc as per Data Sheet No B650-000-YD- DS-8105, Supply of HC LEL Open Path Gas Detector along with all required ... glands, calibration kits, ... glands, calibration kits, ...
Impedance patches for electroanatomical mapping (NavX Velocity patches) for use with ENSITE velocity, Perclose Proglide Closure device Suture Medicated closure system, TPI lead with balloon tip, Safari wire for TAVI, Goose neck micro snare kit, Bio mechabical vascular closure device for large bore femoral arterial access site closure 14 Fr, Bio mechabical vascular closure device for large bore femoral arterial access site closure 18 Fr, Plug based vascular closure device 8F like angioseal, Coronary cutting Balloon, Coronary scoring balloon
AS PER TENDER DOCUMENTS
AS PER TENDER DOCUMENTS