Loading…
Loading…
1,588 results • Best match
Cost of dragging and stacking of timber at Chalakudy depot during 24-25
CONSTRUCTION OF CULVERT AND DRAIN IN FOREST COMPOUND AT GOVERNMENT TIMBER DEPOT. CHALAKUDY
PAINTING WORK OF STAFF QUARTERS (DEPO OFFICER QUARTERS) AT GOVERNMENT TIMBER DEPOT CHALAKUDY
Dragging and stacking of timer at Govt timber deport Chettikulam during 23-24
MARKING OF TREES IN 2004 TEAK PLANTATION,KUTTAPPALAM(11.125HA)2ND SILVICULTUTRE THINNING 2019-20
mechanical thinning at 2014 teak plantation pandupara under kannimangalam fs in Kalady Range 2021
The items included in the estimate are teak wood board polishing emblem man coolie
mechanical thinning works at 2012 mechanised teak plantation under Karakkad FS in Kalady Range
Venue arrangement work for the 5th World Teak conference at Hotel Grand Hyatt, Kochi.
Construction of Livelihood Business Incubation center and Bamboo Bazaar Kothamangalam
Tarring
Final Silvicultural thinning in 1974 Teak Elavu plantation, Kannankuzhy(80.49Ha),Charpa Range during 2020-21
mechanical thinning works at 2012 teak plantation bit2 under karakkad fs in Kalady Range 2021
Final thinning in 1978 Teak plantation Kalluvayal under Pulpally FS of Chedleth Range 2019-20
Earthwork PCC RCC teak wood pile quarry muck filling brick work steel rein plastering etc
MARKING FOR FINAL FELLING WORKS IN 1960 VADAMURY BLOCK I TEAK PLANTATION IN ATHIRAPPILLY RANGE
Manandhavady Research Range Weeding works of Experimental Teak Plantation Panniyode and Kozhimoola during 2022-23.
Estimate for the cost of Special tending works at Dhoni under Olavakkode Range
DRAGGING STAKING CLASSIFICATION NUMBERING ETC
ROAD WORK
As per NIT
Marking for second silvicultural thinning in 2005 Chully teak plantation in Athirapilly Range during 21-22
Climber cutting in 1961 Teak plantation Vadamuri,Athirapilly Forest Station in Athirapilly Range during 2021-22
SMC Works at 1976 Teak plantation in Athirapilly Forest Station in Athirapilly Range during 2021-22
Second silvicultural thinning in 2005 Teak plantation Chully(78.8 Ha) in Athirapilly Range during 2021-22
Climber cutting in 1960 Teak Plantation Vadamuri, Athirapilly Forest Station in Athirapilly Range during 2021-22
Final felling of 1948Teak Plantation at Pachila in Kaliyar Range during 2023-24
ROAD WORK
RCC, Laterite masonry, painting work
Stone pitched Graded bund Bamboo planting Agrostological Measures Retaining Wall Cross check
Providing shed for keeping bamboo waste processing machine at KFRI FRC Palappilly.
SMC works at 1967 Teak Elavu plantation in Ezhattumugham Forest Station in Athirapilly Range during 2021-22
Cliber Cutting in 1965 Teak Elavu plantation , Koomullu, Athirappilly Forest Station in Athirappilly Range durig 2021-22
Climber cutting in 1967 Teak Elavu plantation Thadimudi Ezhattumugham Forest Station in Athirapilly Range during 2021-22
Mentioned in Tender Notice
Construction of an orchiderium near the children play area at timber depot vettoor during 2023-24
supply and installation of name boards to indicate different classes of timber lots for e auction
1. CONSTRUCTION 11 KV OH LINE USING PSC/ A TYPE POLE- 1.7 KM,2. ERECTION OF 100 KVA DTR- 1 NO, 3. FITTING AB-1 NO, 4. ERECTION HT PSC POLE-35 NOS,5. ERECTION A POLE- 16 NOS,6. HT DP -4 NOS.
cutting and removing the trees standing in the project site and stacking the timber at suitable locations
During water distribution through the canal, there is a possibility of waste wood logs, and sedimentation accumulating inside the tunnel. This accumulation affects the free flow of water through the tunnel.
As per Tender Notice
Removal of exotic weeds at 1978,1979 teak plantation area of Aralm section in Aralam Wildlife Range during 2021-22
Climber cutting in 1964 Teak plantation (82.72 Ha) Aircool in Athirapilly Forest Station in Athirapilly Range during 2021-22
Final silvicultural thinning bit in 1976 teak plantation(58.4 Ha) Vazhachal Forest Station in Vazhachal Range during 2020-21
demolishing rcc brick stone rubble earthwork excavation quarry muck filling driving teak piles PCC rcc steel reinforcement plastering spreading
2nd year Maintenance of 2020 Teak Plantation at Ezhuthukal Bit II under Nedumgayam FS of Karulai Range during 2021-22
Electrical installation of bamboo processing machine and related work at project site,Venmony,Idukki District.
Civil works for the establishment of Bamboo processing unit and shade house at Venmani, Idukki
Clearing touchings on LT lines, cutting tree branches, bamboo clusters, coconut cudjans, removing creepers etc.