Loading…
Loading…
3,566 results • Best match
Carriage of SAL CFC produce 2025-26 from various mouzas under Panchet Division to Joypur Timber Depot and Adhkata Timber Depot both under Joypur Range of Panchet Division.
Road Protection with Bamboo Pilling and other Materials from ZP Road towards H/O Rakib Sarkar beside Dana Pond at Palsa Sansad
Repairing of road with provision of bamboo piling beside Behulakuri pond at ChhatiaMouzaChhatiaJl No 133 Plot No 668 PS No111 of Jagdala Gram Panchayat under Bamangola Dev Block.
Construction of bamboo piling infront of Abul Molla pond Mouza Shikil Jl No 65 Plot No 145 PS No 52 of Bamangola Gram Panchayat under Bamangola Dev Block
Construction of bamboo sanko near the house of Rabi Das at Dakshin Panialguri, Part no-11/264, Sansad no-XVII, JL no-60
Construction of bamboo sanko near the house of Sahadad Ali at Dakshin Dhalkar, Part no-11/259, Sansad no-XIII, JL no-77
Padma River side bamboo pilling Protection wall, Dreasing and Chilchilling work from Kalu sk to house to Sabu sk house at Alaipur Paschim
Supply of Additional Teak Wood Furniture for ASW-SWC Project Yard 3030-3036 (ASW-SWC Project)
Carriage of Forest produce SALfrom various felling sitesCFC Daldali to Bhulaveda Timber Depot for the Felling Season 2021-22, Over 15 Ha. including loading unloading from TruckTracktor as per ITC JPC
BAMBOO FOR TARGET, TARGET TIN SHEET FIG 11, TARGET PAPER FIG 11, SAND BAGS, NAILS IRON, CONNECTING COIL FOR SECURITY
PIONEER SUPPLY CHAIN Bamboo broom conforming to IS 11100 of, PIONEER SUPPLY CHAIN Bamboo broom conforming to IS 11100 of Length 81 centimeter
Unbranded Bamboo broom conforming to IS 11100 of length As, Unbranded Bamboo broom conforming to IS 11100 of length As per IS 11100
Unbranded Bamboo broom conforming to IS 11100 of length As, Unbranded Bamboo broom conforming to IS 11100 of length As per IS 11100
De-launching of existing 400 Ft. Bailey Suspension Bridge reinforced with timber decking, Launching/Erection of new 400 Ft. Bailey Suspension Bridge reinforced with timber decking (galv)
Carriage of CFC produce 2025-26 from various mouzas under Jhargram Division to Gidhni Timber Depot under Gidhni Range and Binpur Timber Depot under Silda Range of Jhargram Division.
Carriage of CFC produce 2024-25 from various mouzas of Medinipur Division to Godapiasal Timber Depot of Godapiasal Range and Baghasole Timber Depot of Medinipur Range under Medinipur Division.
Carriage of CFC produce 2025-26 from various mouzas under Kharagpur Division to Hijli Timber Depot and Panchkahaniya Timber Depot both under Hijli Range of Medinipur Forest Corporation Division.
Carriage of CFC produce 2025-26 from various mouzas under Jhargram Division to Jamboni Timber Depot under Jamboni Range and Kamlasole Timber Depot under Gopiballavpur Range of Jhargram Division.
Carriage of CFC produce 2025-26 from various mouzas under Kharagpur Division to Panchkahania Timber Depot under Nayagram Range and Chandabila Timber Depot under Chandabila Range of Kharagpur Division.
Carriage of Harvested (SAL and PLTN.) produce 2024-25 from various mouzas of Burdwan Division to Ausgram Timber Depot and Orgram Timber Depot of Guskara Range under Burdwan Division.
Construction of bamboo sanko near the house of Arun Biswas (North Side) at Putimari, Part no-11/255, Sansad no-IX, JL no-75
Construction of bamboo sanko near the house of Arun Biswas (South Side) at Putimari, Part no-11/255, Sansad no-IX, JL no-75
Bamboo walling at Krishnagar - Karimpur - Jalangi road between ch. 32.00 kmp and 37.50 km under Krishnagar Sub-Division, P.W.D. during the year 2024-25
Bamboo walling at Krishnagar - Karimpur - Jalangi road between ch. 49.00 kmp and 52.00 km under Krishnagar Sub-Division, P.W.D. during the year 2024-25
Bamboo walling at Krishnagar - Karimpur - Jalangi road between ch. 40.00 kmp and 45.00 km under Krishnagar Sub-Division, P.W.D. during the year 2024-25
Supply & Fitment of yield strength elongation heat transition and water absorption aluminum panel sheet both side 0.5mm skin and PE core (approx 3mm thickness). Colour Royal teak and Nyana teak with
Carriage of (SAL and DEV) harvested CFC produce 2023-24 from different felling sites/coupes of Bankura North Division to Bankura North Timber Depot of Bankura North Range under Ex-Officio Divisional Manager, WBFDCL and DFO, Bankura (N) Division.
Bamboo Mat Board For General Purposes-IS:13958 (Q3)
Maintenance work of Pondby re-excavation and Bamboo piling
Repairing of Bamboo Bridge near Bishnupur Purba Pry. School
Road protection wall by Bamboo pilling at Koyemba village
Bamboo Mats To Be Used As Dunnage In Warehouses
Construction of Bamboo piling near Rabiul house at Baghmara
BAMBOO PILING MADRASHA TOWARDS AJIJUR MASTER HOUSE AT SHYAMPUR .
CC Road fr Saira School road to Bamboo Garden
Bamboo piling at Southern side of purbagram Masjid pukur
Const of Chepti deghi bamboo pyling at Dala sansad
Maintenance of Embankment By Bamboo piling (Double) and Earthwork
Repair and Upgradation of Bamboo Sanko at Lokepith - II
Bamboo pilling at baliara Para and Madhya Para Battala
Repairing of Bamboo Macha verious place of all Sansad
Carriage of CFC produce 2022-23 from different felling sites/mouzas of Onda Range to Chhagulia Timber Depot, Krishnanagar Timber Depot of Onda Range under Ex-Officio Divisional Manager, WBFDCL and DFO, Panchet Division, Bishnupur, Bankura.
Carriage of CFC produce 2022-23 from various Mouzas (Lease Land) of Midnapur Division to Godapiasal Timber Depot under Godapiasal Range, Orgonja Timber Depot Chandrakona Road Range under Divisional Manager, MFCD, WBFDCL.
BURMA TEAK PLANTATION AT MOUZA- DAINTIKRI, JL.NO.-702, PLOT NO- 45,470,471,227,163, 165,609/795, 609/935, 200, 218,168, 346, 173, 188 UNDER LALGARH G.P, BINPUR-I BLOCK,
CONSTRUCTION OF BARRACK FOR DUTY STAFFS INCLUDING OVER HEAD TANK AND RUNNING WATER TAP LINE AT TEAK FOREST IN COOCHBEHAR UNDER COOCHBEHAR DIVISION, COOCHBEHAR, WEST BENGAL
Construction of Bamboo Palisade, Scheme No. 09 (Nine)at Darjeeling Sub-Division, District Darjeeling under RKVY 2023-24.
Construction of Bamboo Palisade, Scheme No.16(Sixteen)at Kurseong Sub-Division, District Darjeeling under RKVY 2023-24.
Construction of Bamboo Palisade, Scheme No.08 (Eight)at Darjeeling Sub-Division, District Darjeeling under RKVY 2023-24.
Construction of Bamboo Palisade, Scheme No.15(Fifteen)at Kurseong Sub-Division, District Darjeeling under RKVY 2023-24.
Construction of bamboo beside the house of Dhiren Barman at Madhya Shibkata Under Majherdabri GP, APD-II PS