Loading…
Loading…
3,012 results • Best match
Supply of mechanical Broomers and Engaging of tractors (pulling) for Sweeping of roads with Broomers attached in Narsingi circle -45 SLPZ CMC (ITEM NO.01)
Repair and Overhauling Service - ALL VEHICLES; ALL VEHICLES; Yes; Buyer Premises, Repair and Overhauling Service - Tractors (V1); EICHER CANTER; Yes; Buyer Premises, Repair and Overhauling Service - Tractors (V1); EICHER CANTER 3 TON; Yes; Buyer ... - Tractors (V1); ...
KTPS-V&VI Stages-Civil-O&M-II-Ash pond- Engaging of excavator on hire basis for excavation of bottom ash by mechanical means using excavator of 200 capacity (track machine) and depositing the same in the trucks/tractors from V Stage ash pond towards PVK-5 of SCCL for underground stowing for the period of one month during December and January from ash ponds of V Stage.
Construction of Compound wall, Sump and Providing of Motor at Sanitation Tractor Shed under MGF in Nalgonda Municipal Corporation.
Engaging of Tractors and Labours for desilting of Box type drain from Kargil lake to Kotha cheruvu via Old bus stand (Right side) in Sircilla Town
ENGAGING OF JCB, TRACTOR AND LABOUR FOR SPECIAL SANITATION DRIVE ATVARIOUS AREAS IN GUMMADIDALA MUNICIPALITY UNDER MGF GRANTS 2025-26
Engaging of JCB, Hitachi, Tractors labours for desilting of storm water drains from Old Agriculture market via Ganesh nagar, Venkampeta dobhighat to Kotha cheruvu in Sircilla Town
Procurement of 4 Nos of Tractors with Trailers for improvement of Solid Waste Management activities in Adilabad Municipality, Est.Cost Rs.39.00 Lakhs, SFC / 15th FC Tied Grant
Engaging IRT Vehicle DCM/Tractor with trolley, Labour along with tools and implements for attending filling pot holes, Cross cuttings, Minor CC patches, Repairs to catch pits & Replacing of covers and road side silt removal etc., for the period of 7 months (01-11-2019 to 31-05-2020)) for Ward-11, (Redhills-75), Cir-12, KZ, GHMC. (With Material) (Item No.06)
Engaging of JCB, blade tractor for ground levelling and bush clearance and gravel formation and stone dust and barricading and laying of sand bags and white wash for steps and engaging of labours for bathukamma nimajjanam point in div nos.14,15,16 and markandeyanagar dam side point and Polasa Sharada point of MCK Est. cost of Rs. 4.00 Lakhs under MGF
Engaging IRT Vehicle DCM/Tractor with trolley, Labour along with tools and implements for attending filling pot holes, Cross cuttings, Minor CC patches, Repairs to catch pits & Replacing of covers and road side silt removal etc., for the period of 7 months (01-11-2019 to 31-05-2020) for Ward-12, (Asifnagar-72), Cir-12, KZ, GHMC (Item No.03)
Engaging of JCB and blade tractor for ground leveling and bush clearance and collection and spreading of stone dust and providing of barricading for public protection and laying of sand bags at bathukamma nimajjanam point sai baba temple and play grounds at various locations at Seetharampoor on occasion of Bathukamma festival in div no.21 Est. cost of Rs. 1.50 Lakhs under MGF
Engaging IRT Vehicle DCM/Tractor with trolley, Labour along with tools and implements for attending filling pot holes, Cross cuttings, Minor CC patches, Repairs to catch pits & Replacing of covers and road side silt removal etc., for the period of 7 months (01-11-2019 to 31-05-2020) for Ward-12, (Guddimalkapur-71), Cir-12, KZ, GHMC (Item No.02)
Engaging IRT Vehicle DCM/Tractor, Labour along with tools and implements for attending filling pot holes, Cross cuttings, Minor CC patches, Repairs to catch pits & Replacing of covers, removal of road side silt and Floating debris in nala etc. for the period of 7 months (1st November 2024 to 31st May 2025) under Redhills-75, Mehdipatnam Circle-12, KZ, GHMC (Item No.6)
Engaging IRT Vehicle DCM/Tractor with trolley, Labour along with tools and implements for attending filling pot holes, Cross cuttings, Minor CC patches, Repairs to catch pits & Replacing of covers and road side silt removal etc., for the period of 7 months (01-11-2019 to 31-05-2020) for Ward-12, (Mehdipatnam-70), Cir-12, KZ, GHMC (Item No.01)
Engaging IRT Vehicle DCM/Tractor, Labour along with tools and implements for attending filling pot holes, Cross cuttings, Minor CC patches, Repairs to catch pits & Replacing of covers, removal of road side silt and Floating debris in nala etc. for the period of 7 months (1st November 2024 to 31st May 2025) under Mallepally-76, Mehdipatnam Circle-12, KZ, GHMC (Item No.7)
Engaging IRT Vehicle DCM/Tractor with trolley, Labour along with tools and implements for attending filling pot holes, Cross cuttings, Minor CC patches, Repairs to catch pits & Replacing of covers and road side silt removal & floating material in nala etc., for the period of 7 months (01-11-2021 to 31-05-2022) for Ward-11, (Redhills-75), Cir-12, KZ, GHMC
Engaging IRT Vehicle DCM/Tractor with trolley, Labour along with tools and implements for attending filling pot holes, Cross cuttings, Minor CC patches, Repairs to catch pits & Replacing of covers and road side silt removal etc., for the period of 7 months (01-11-2019 to 31-05-2020) for Ward-10, (Ahmednagar-74), Cir-12, KZ, GHMC (Item No.05)
Earmarked for "SC/ST/Waddera/Sagara Labour Cooperative societies and individual" - KTPS V VI Stages- O M-III-Civil-Engaging the tractor and Dozer (D50) along with driver for collecting and clearing of debris, garbage, vegetation and leveling of areas at TGGENCO Housing Colony, New Bombay colony, KSP Camp Colony at Paloncha for the period from April 2025 to March 2026.
Engaging IRT Vehicle DCM/Tractor, Labour along with tools and implements for attending filling pot holes, Cross cuttings, Minor CC patches, Repairs to catch pits & Replacing of covers, removal of road side silt and Floating debris in nala etc. for the period of 7 months (1st November 2022 to 31st May 2023) under Redhills-75, Mehdipatnam Circle-12, KZ, GHMC (Item No.6)
Engaging IRT Vehicle DCM/Tractor, Labour along with tools and implements for attending filling pot holes, Cross cuttings, Minor CC patches, Repairs to catch pits & Replacing of covers, removal of road side silt and Floating debris in nala etc. for the period of 5 months (1st January 2024 to 31st May 2024) under Gudimalkapur-71, Mehdipatnam Circle-12, KZ, GHMC (Item No.2)
Engaging IRT Vehicle DCM/Tractor, Labour along with tools and implements for attending filling pot holes, Cross cuttings, Minor CC patches, Repairs to catch pits & Replacing of covers, removal of road side silt and Floating debris in nala etc. for the period of 7 months (1st November 2022 to 31st May 2023) under Ahmednagar-74, Mehdipatnam Circle-12, KZ, GHMC (Item No.5)
Engaging IRT Vehicle DCM/Tractor with trolley, Labour along with tools and implements for attending filling pot holes, Cross cuttings, Minor CC patches, Repairs to catch pits & Replacing of covers and road side silt removal etc., for the period of 7 months (01-11-2019 to 31-05-2020)for Ward-11, (Mallepally-76), Cir-12, KZ, GHMC. (With Material) (Item No.07)
Engaging IRT Vehicle DCM/Tractor, Labour along with tools and implements for attending filling pot holes, Cross cuttings, Minor CC patches, Repairs to catch pits & Replacing of covers, removal of road side silt and Floating debris in nala etc. for the period of 5 months (1st January 2024 to 31st May 2024) under Mallepally-76, Mehdipatnam Circle-12, KZ, GHMC (Item No.)
Engaging of (118) No of unskilled workers for repairs to pipe line, repairs of bore wells, sluice valve operation, repairs to the street lighting and for water supply tractor tankers for maintenance of water supply and street lighting, Parks in ward No.1 to 33 for the year of 2018-19 under Municipal General Fund. ( period From May -2018 to March-2019)
Engaging IRT Vehicle DCM/Tractor, Labour along with tools and implements for attending filling pot holes, Cross cuttings, Minor CC patches, Repairs to catch pits & Replacing of covers, removal of road side silt and Floating debris in nala etc. for the period of 7 months (1st November 2022 to 31st May 2023) under Mallepally-76, Mehdipatnam Circle-12, KZ, GHMC (Item No.7)
Engaging IRT Vehicle DCM/Tractor, Labour along with tools and implements for attending filling pot holes, Cross cuttings, Minor CC patches, Repairs to catch pits & Replacing of covers, removal of road side silt and Floating debris in nala etc. for the period of 7 months (1st November 2022 to 31st May 2023) under Guddimalkapur-71, Mehdipatnam Circle-12, KZ, GHMC (Item No.2)
Engaging IRT Vehicle DCM/Tractor, Labour along with tools and implements for attending filling pot holes, Cross cuttings, Minor CC patches, Repairs to catch pits & Replacing of covers, removal of road side silt and Floating debris in nala etc. for the period of 7 months (1st November 2022 to 31st May 2023) under Mehdipatnam-70, Mehdipatnam Circle-12, KZ, GHMC (Item No.1)
Engaging IRT Vehicle DCM/Tractor, Labour along with tools and implements for attending filling pot holes, Cross cuttings, Minor CC patches, Repairs to catch pits & eplacing of covers, removal of road side silt and Floating debris in nala etc. for the period of 5 months (1st January 2024 to 31st May 2024) under Mehdipatnam-70, Mehdipatnam Circle-12, KZ, GHMC (Item No.1)
Engaging IRT Vehicle DCM/Tractor with trolley, Labour along with tools and implements for attending filling pot holes, Cross cuttings, Minor CC patches, Repairs to catch pits & Replacing of covers and road side silt removal & floating material in nala etc., for the period of 7 months (01-11-2021 to 31-05-2022) for Ward-12, (Asifnagar-72), Cir-12, KZ, GHMC
Engaging IRT Vehicle DCM/Tractor, Labour along with tools and implements for attending filling pot holes, Cross cuttings, Minor CC patches, Repairs to catch pits & Replacing of covers, removal of road side silt and Floating debris in nala etc. for the period of 7 months (1st November 2024 to 31st May 2025) under Gudimalkapur-71, Mehdipatnam Circle-12, KZ, GHMC (Item No.2)
Engaging of JCB and blade tractor for ground leveling and bush clearance and collection and spreading of stone dust and providing of barricading for public protection and laying of sand bags at bathukamma nimajjanam point Pentakamma cheruvu and play grounds at various locations at Rekurthy on occasion of Bathukamma festival of MCK Est. cost of Rs. 4.00 Lakhs under MGF
Engaging of IRT vehicle (Tractor with Trolley/Tata Ace/DCM) along with Labour and and Supplying of IRT Material for filling Pot Holes, attending SW Drain complaints and Placing of RCC Covers, Metal, Repairs to Footpath at various locations in Old Malakpet, Div-26, GHMC. (for 7 Months) ( Reserved for SC Individuals / Proprietorship Firms / Partnership Firms as per GO MS.No. 59 dt.21.05.2018)
Construction of Toilets and urinals and Supply and delivery of electrical material at Sanitation tractor shed under MGF in Nalgonda Municipal Corporation.
Engaging of JCBs, blade Tractor and other maintenance woks for flood mitigation in lowlying areas in Jagtial town under 15th FC Grants
Repair and Overhauling Service - built up trucks; DOOR HANDLE FOR ASHOK LEYLAND MRS; Yes; Buyer Premises, Repair and Overhauling Service - built up trucks; GROUND SWITCH FOR BEML CFT; Yes; Buyer Premises, Repair and Overhauling Service - Tractors ... - Tractors (V1); ... - Tractors (V1); ... FARMTRAC TRACTOR ; ... - Tractors (V1); ...
Engaging IRT Vehicle DCM/Tractor with trolley, Labour along with tools and implements for attending filling pot holes, Cross cuttings, Minor CC patches, Repairs to catch pits & Replacing of covers and road side silt removal & floating material in nala etc., for the period of 7 months (01-11-2021 to 31-05-2022) for Ward-12, (Guddimalkapur-71), Cir-12, KZ, GHMC. (1st Recall)
Engaging IRT Vehicle DCM/Tractor with trolley, Labour along with tools and implements for attending filling pot holes, Cross cuttings, Minor CC patches, Repairs to catch pits & Replacing of covers and road side silt removal & floating material in nala etc., for the period of 7 months (01-11-2021 to 31-05-2022) for Ward-10, (Ahmednagar-74), Cir-12, KZ, GHMC. (1st Recall)
Engaging IRT Vehicle DCM/Tractor, Labour along with tools and implements for attending filling pot holes, Cross cuttings, Minor CC patches, Repairs to catch pits & Replacing of covers, removal of road side silt and Floating debris in nala etc. for the period of 5 months (1st January 2024 to 31st May 2024) under Asif Nagar-72, Mehdipatnam Circle-12, KZ, GHMC (Item No.3)
Engaging IRT Vehicle DCM/Tractor with trolley, Labour along with tools and implements for attending filling pot holes, Cross cuttings, Minor CC patches, Repairs to catch pits & Replacing of covers and road side silt removal etc., for the period of 7 months (01-11-2019 to 31-05-2020)) for Ward-12, (Vijay Nagar Colony-73), Cir-12, KZ, GHMC. (With Material) (Item No.04)
Engaging of JCB and blade tractor for ground leveling and bush clearance and collection and spreading of stone dust and providing of barricading for public protection and laying of sand bags at bathukamma nimajjanam point chinthakunta canal and play grounds at various locations at chinthakunta on occasion of Bathukamma festival Est. cost of Rs. 2.50 Lakhs under MGF (Reserved for Waddera/Sagara Societies/Individual)
Engaging IRT Vehicle DCM / Tractor with trolly, labour along with tools and implements for attending filling pot holes, Cross cuttings, Minor CC patches, Repairs to catch pits & Replacing of covers, removal of road side silt from the period from 01-12-2020 to 31-05-2021 for the period of 6 months for (76-Mallepally), Ward-11, Circle-12, KZ, GHMC (Item No.07)
Engaging of Tractor, Labour and during rainy day Monsoon labour has to attend/clear water stagnation points, Monsoon labour shall take pot hole filling with BT from Fathullaguda Plant/Chudi Bazar Plant and road silt removal during non rainy days for Monsoon Emergency team from 01-06-2019 to 31-10-2019 in Ward.No.13, Hayath Nagarof Hayath Nagar circle-3, GHMC.(2nd Recall)
Engaging of JCB and blade tractor for ground leveling and bush clearance and collection and spreading of stone dust and providing of barricading for public protection and laying of sand bags at bathukamma nimajjanam point Errakunta cheruvu and Vagu near Dargha and play grounds at various locations at Arepalli on occasion of Bathukamma festival in div no.20 Est. cost of Rs. 2.60 Lakhs under MGF
Engaging IRT Vehicle DCM/Tractor, Labour along with tools and implements for attending filling pot holes, Cross cuttings, Minor CC patches, Repairs to catch pits & Replacing of covers, removal of road side silt and Floating debris in nala etc. for the period of 7 months (1st November 2024 to 31st May 2025) under Asif Nagar-72, Mehdipatnam Circle-12, KZ, GHMC (Item No.3)
Engaging IRT Vehicle DCM/Tractor with trolley, Labour along with tools and implements for attending filling pot holes, Cross cuttings, Minor CC patches, Repairs to catch pits & Replacing of covers and road side silt removal& floating material in nala etc., for the period of 7 months (01-11-2021 to 31-05-2022) for Ward-12, (Mehdipatnam-70), Cir-12, KZ, GHMC (Reserved for STs) (1st Recall)
Engaging IRT Vehicle DCM / Tractor with trolly, labour along with tools and implements for attending filling pot holes, Cross cuttings, Minor CC patches, Repairs to catch pits & Replacing of covers, removal of road side silt from the period from 01-12-2020 to 31-05-2021 for the period of 6 months for (71-Gudimalkapur), Ward-12, Circle-12, KZ, GHMC (Item No.02)
Engaging IRT Vehicle DCM / Tractor with trolly, labour along with tools and implements for attending filling pot holes, Cross cuttings, Minor CC patches, Repairs to catch pits & Replacing of covers, removal of road side silt from the period from 01-12-2020 to 31-05-2021 for the period of 6 months for (75-Redhills), Ward-11, Circle-12, KZ, GHMC (Item No.06)
Engaging of Emergency vehicle (Tata Ace) with driver, labour and Dewatering pumps on hire basis for attending Emergency Rescue operations, SW Drain complaints, water stagnation, filling pot holes, lifting of debris and Engaging Tractor with driver, extra labour, and equipments for carting of accumulated silt during heavy raining days for monsoon period of (5) months for the year 2022 in Pathergatti Div-32, Cir-9, CRZ, GHMC
Engaging IRT Vehicle DCM / Tractor with trolly, labour along with tools and implements for attending filling pot holes, Cross cuttings, Minor CC patches, Repairs to catch pits & Replacing of covers, removal of road side silt from the period from 01-12-2020 to 31-05-2021 for the period of 6 months for (73-Vijay Nagar Colony), Ward-10, Circle-12, KZ, GHMC (Item No.04)