Loading…
Loading…
3,215 results • Best match
Laying of 300 mm Size Type Design CC Drain and 450mm size Culverts from SS-8 Transformer to Electrical pole bearing no.SS80/A2 at Tulasinagar in ward No. 6 of Yelamanchili Municipality Gadapa Gadapaku Mana Prabhutvamu (GGMP / W No - 6)
Supplying and Erection of 250KVA Copper Wound cast Resin Transformer and annual maintenance of H.T&L.T over headlines and power Distribution system of Annamayya Project Dam site near Badanagadda (V) in Rajampet (M) of Kadapa District for the year 2018-19
Construction of Storm Water Drain from Existing Drain to Opp. Abbas Talkies Near D.No.9/879 (Abhaya Anjaneya Swamy Temple) to Z.P. High School ( Near Transformer No:SS/49) in ward No.6&7 ( Drain Size 900X900) 325.00 mtrs in Yemmiganur Municipality.
Construction of Kitchen dinning and Amenties block at Grey Hounds Visakhapatnam sub work :: Proposed ancillary works i.e., providing GI Strip, Copper Strip, Re- Location of 250 KVA Transformer 150 Sq.MM UG Cable and Installation of 62.50 KVA Generator Grey Hounds Visakhapatnam
Control Transformer, 415/110V AC, 200VA, suitable for M/s. SIDWAL or M/s. INTEC Corporation Make roof mounted packaged AC unit for three phase electric locomotives and confirming to RDSO Specn. No.-RDSO/2007/EL/SPEC/ 0055 ( Rev.-2).
Laying of 300 mm Size Type Design CC Drain and 450mm size Culverts from SS-8 Transformer to Electrical pole bearing no.SS80/A2 at Tulasinagar in ward No. 6 of Yelamanchili Municipality Gadapa Gadapaku Mana Prabhutvamu (GGMP / W No - 6)
Construction of CC Drain from Transformer to Dr. Riyaz Water Plant, Muthyalamma Well to RB Kambaiah House, Culvert at Bandi Chowdappa House, Chintha Chettu, Balakrishna House & RB Kambaiah House in Ward No.10 of Gooty Municipality Under 15th FCG 2020-21
Construction of CC road in Balighattam ward no.17 of Narsipatnam Municipality, 1.Jalli Manikyam House to Bandaru Sathibabu House. 2.K Raju House to Setti Lakshmi (Dr no 244)House. 3.Transformer to Dasarasa Chinnabulli (Dr no 145) House.
Laying of 300 mm Size Type Design CC Drain and 450mm size Culverts from SS-8 Transformer to Electrical pole bearing no.SS80/A2 at Tulasinagar in ward No. 6 of Yelamanchili Municipality Gadapa Gadapaku Mana Prabhutvamu (GGMP / W No - 6)
Supply and application of EPSILON G4 RTV high voltage insulator coating (HVIC) for 220KV HV bushing of 21 Nos. in service plus 1 spare,42.5MVA,11KV/(200/3)KV M/s.TELK Make generator Transformer at Srisailam Right Bank Power House.
Supply Fixing of 175HP and 375 HP FCMA Modular Transformer Coils and Complete wiring to soft Starters at Ramapuram and supply and fixing of 6322 SKF Bearings for 425 HP Motor at MD Putter Pump House in Tirupati Municipal Corporation.
Maintainance and Repairs of CC Drain and Culvert at Transformer or D.No 1-68-1C-369-A5 near Bharat Gas Godown and 450mm CC Drain from Hand bore to D.No 1-67-8C at 28th election ward Under General funds.
Gudur Municipality - 15th Finance Commission - Renovation of Clariflocculator, Flash mixer, two air blowers and Replacement of filter medium like sand, pebbles etc., at Vemulapalem Water treatment plant and Providing 200 KV Transformer at Vemulapalem head water works in Gudur Municipality
Shifting of LV Bays along with Auxiliary Bus of 50 MVA PTR I 50 MVA PTR II Station Transformer and Erection of new 33 KV PT SET II all works under shutdown condition at 132/33KV SubStation Vijayawada NTR District
Shifting of LV Bays along with Auxiliary Bus of 50 MVA PTR-I, 50 MVA PTR-II & Station Transformer and Erection of new 33 KV PT SET-II, all works under shutdown condition at 132/33KV Sub-Station, Vijayawada, NTR District.
Laying of 150mm dia AC pipes line from Electric transformer (Shajar Mansion to D.No 45/4/424 and Laying of 110mm dia PVC pipes line from D.No 45/175-1B to canal end in Narasimha Reddy Nagar in ward No.46
Completion of all Civil Works and Electrical works, Construction of drinking water system, Completion of works in dormitories and septic tank, Pipelines, New Transformer to avoid power fluctuations etc., to Dr.B.R.Ambedkar, Gurukulam at Krishnaraopalem (V) of A.Konduru (M) in NTR Distirct
Annual Maintenance of Spillway Radial Gates, 70 KVA Generator and pumps at Sump well and maintenance of 100KVA transformer of Kalyani Dam near A. Rangampeta Village of Chandragiri Mandal in Chittoor District for the year 2021-22. (Item no.01)
Construction of CC road in Balighattam ward no.17 of Narsipatnam Municipality, 1.Jalli Manikyam House to Bandaru Sathibabu House. 2.K Raju House to Setti Lakshmi (Dr no 244)House. 3.Transformer to Dasarasa Chinnabulli (Dr no 145) House.
Shiffting of Transformer from pond area to the front side corner. Filling big water pond beside the Dinning hall complection of Electical Work in toilets, bathrooms & Dormitary to Dr.BR. Ambedkar Gurukulams at Bogole Village and mandal in SPSR Nellore District.
Maintainance and Repairs of CC Drain and Culvert at Transformer or D.No 1-68-1C-369-A5 near Bharat Gas Godown and 450mm CC Drain from Hand bore to D.No 1-67-8C at 28th election ward Under General funds.
Providing CC Road from Electric Pole No. SK 33 near ITI college to Existing transformer Netaji nagar in ward No.13 of Palasa-Kasibugga Municipality (Which is covered in CIIP, S. No.63 in Roads) Under 14FC (BG) - 2017-18
Shifting of LV Bays along with Auxiliary Bus of 50 MVA PTR I 50 MVA PTR II Station Transformer and Erection of new 33 KV PT Set II.All works under shutdown condition at 132 33KV Sub Station Vijayawada NTR District
415/190V, 3 phase, Dry type Natural air-cooled power distributed 5 kVA transformer without filter confirming to ICF specification No. ICF/Elec/906 Rev-1 or latest Type. III and ICF drawing No. ICF/SK3-7-1-070 or latest.
Oil cooler radiator 165 KW for main transformer 5400 KVA as per CLW Spec. no. CLW/ES/O-4, Alt-E or latest and CLW Drg. No. CLW/ES/SK-1/O-4, Alt-E or latest for WAP-4 locomotives.
Online UPS Experience with Gov. Required 5 Year (s) Online UPS ( 16 ) Technical Specifications Specification Specification Name Values Allowed Values GENERIC Rating in KVA (KVA) 1.0 KVA 1.0 KVA Technology MOSFET-PWM with inbuilt isolation transformer ... isolation transformer , ... isolation transformer , ... isolation transformer Input ...
Restoration to HT Lines, LT lines, Transformers lighting, and beatification arrangements to Srisailam dam and its appurtenant works
Microprocessor based Energy Cum Speed Monitoring System (ESMON) for BG AC Electric locomotives as per RDSO Spec. No. ELRS/Spec/SPM/0002 Rev-4, 17th July 2018. Each Microprocessor based Energy Cum Speed Monitoring System (ESMON) consisting of (1) ... Potential Transformer - ... Current Transformer - ...
Providing of 38Nos. skilled persons to assist O&M staff for attending fuse of calls and breakdowns during peak load hours in various operation sections and 10Nos skilled & 5 Nos. semi-skilled persons to work at Transformers & M&P Divisions for the period from 01.08.2019 to 31.03.2020 (8Months) on works contract basis in operation circle, Eluru
APSPCL - Kadapa UMSP (1000 MW) - Completion of certain necessary balance Civil works like oil chambers near transformers, balance compound wall with gate pillars, sanitary fitting items in wash rooms and other internal and external painting items etc. at Pooling Station 2 & 3 at Kadapa Ultra Mega Solar Park (1000 MW), Mylavaram Mandal of YSR Kadapa District, A.P.
Providing of 38Nos. skilled persons to assist O&M staff for attending fuse of calls and breakdowns during peak load hours in various operation sections and 10Nos skilled & 5 Nos. semi-skilled persons to work at Transformers & M&P Divisions for the period from 01.08.2019 to 31.03.2020 (8Months) on works contract basis in operation circle, Eluru
Shifting of 33KV/11 KV/LT lines and Dist. Transformers along the road from Hanuman Circle to Gajulapeta in Vempalli Town for purpose of Road Widening in Vempalli Town under Turnkey basis Wihich taken up by R&B Department under DC works in operation section, Vempalli Town vide WBS No.:D-2023-06-05-21-01-007
APSPCL - Kadapa UMSP (1000 MW) - Completion of certain necessary balance Civil works like oil chambers near transformers, balance compound wall with gate pillars, sanitary fitting items in wash rooms and other internal and external painting items etc. at Pooling Station 2 & 3 at Kadapa Ultra Mega Solar Park (1000 MW), Mylavaram Mandal of YSR Kadapa District, A.P.
Set consist of (1)Main control PCB K58-B(Part Code: DTWS20640) Qty-10 No's; (2)IGBT Driver PCB H67-B(Part Code: DTWS20646) Qty-4 No's;(3)Power Supply PCB H27-A(Part Code: DTWS20652) Qty-2 No's;(4)Abrotion PCB H27-A(Part Code: DTWS20632) Qty-4 ... No's;(7)Control Transformer UG-70 ... (8)Control Transformer UG-69 ... Main Transformer Coil ...
Construction of major 3ft drain from Uppelli Pentayya tyre scrapping company to existing culvert in r and b road and transformer opposite to Uppelli Pentayya tyre scrapping company to existing culvert in r and b road in williampeta,14th ward of JMC.
Providing Switching and change over arrangments for running of 3Nos of 120HP Motors at newly constructed pump house under AMRUT scheme to 400KVA Transformer switch yard in Nellimarla master pump house under General fund2019-20 in Vizianagaram corportion. Est Cost :4.88 Lakhs
Construction of CC Road from D.No.15/70 To D.No. 15/73 Revenue colony and Laying of CC Road from D.No.15/13 To D.No. 15/14/2 and D.No. 16/187 To P.No: 31/237 (Transformer) Revenue colony in SRIKALAHASTI MUNICIPALITY
REPAIR / MAINT OF HT / LT DISTR SYSTEM AND TRANSFORMER AND VCB/RMUS FEEDER PILLAR BOXES, LT UG CABLE AND OTHER CONNECTED WKS AT INS CIRCARS, NOI, HQ ENC AND OTHER ALLIED AREAS UNDER AGE E/M NO-I OF GE (U-I) VISAKHAPATNAM
Laying of C.C Drains and Culverts from D.no 17/847-c1 to 17/862 , PSR school to transformer at old MLA guest house , D.no 17/1000 to siri sweet shop in Tilaknagar,16th ward, 13th secretariat under general funds in Guntakal Municipality
Repair and Rectification of 75 Hp Clear Water Pump Damaged Section Pipe Removing and Refixing off C.ID/F Pipes and 40 Hp (Raw Water Pump House) Pumps Repairs in SS Tank -2 & New Filter bed 11 Kv Transformer Yard in Ongole Muncipal Corporation
Construction of CC Road from D.No.15/70 To D.No. 15/73 Revenue colony and Laying of CC Road from D.No.15/13 To D.No. 15/14/2 and D.No. 16/187 To P.No: 31/237 (Transformer) Revenue colony in SRIKALAHASTI MUNICIPALITY
Supply Erection Testing and Commissioning of 1No220/132kV 100MVA Auto Transformer at Dr. NTTPS Switchyard and erection of 1no 132kv Bay at Bhavanipuram 132/33kV SS and Connected line to facilitate 132Kv Connectivity to Bhavanipuram SS in NTR Dt on Turn key basis
SRBHES-Replacement of existing damaged window shutters at EL 205.5 M(i.e. at roof level) with new laminated sheet/Acrylic sheet of 4 mm thick on river side main wall and repairs to existing window shutters at transformer side of Power House
Construction of CC road from elec transformer no-SS30/100kVA at kolkat veedhi junction to STL elec pole No- SS 18/A2/2/2 at medara veedhi junction in ward no-22 of salur municipality under 14 th finance grant 17-18
Construction of major 3ft drain from Uppelli Pentayya tyre scrapping company to existing culvert in r and b road and transformer opposite to Uppelli Pentayya tyre scrapping company to existing culvert in r and b road in williampeta,14th ward of JMC.
Annual Maintenance of 75 hp submersible motors,panel boards and other electrical accessories and 250 KVA Transformer at Thummapala Head water works &15 MLD STP Sankaram and 400 KL Sump cum pump House in Anakapalli zone of GVMC for the year 2025-26
Design, supply, retro fitting, testing and commissioning of advanced numerical protection relays along with lock-out relays in place of existing static/ electro mechanical relays for 31.5 MVA ,220KV/6.6KV station transformer 1 & 2 as per the annexure attached along with mandatory spares
Construction of Out fall Drain from D No:20-30-31/3A to D No:20-30-31/5B Donka road at NTR Nagar Near electrical transformer in 12th Ward of Tenali Municipality Under 15th F C Untied Grant 2nd Instalment 2020-21
Protection rubber hose for Potential transformer cable securing as per ID: 35mm, OD: 41mm, Thickness: 3mm of Neoprene & shore hardness: 65 +/-5. Material(Protection rubber hose) minimum 10metres length is required. Note: One Metre sample should be got approved before effecting bulk supply.
Air Conditioner, automatic line voltage corrector or step type auto transformer