Loading…
Loading…
2,878 results • Best match
RETARRING
RETARRING
As per BOQ and tender documents
Constn of 12.00 m dia Intake well and pump house , Constn of 14 LL GLSR and Booster pump house, Constn of 35.00 MLD WTP, S/L 700 mm DI K9 PM, Constn of OHSRs, Constn of Electrical Sub Stations , Supplying and erection of pump sets and transformers
Ammeter, Field regulator RHEOSTAT, Single phase kWh meter, Wattmeter Dynamometer type, Clamp on Ammeter, UPS, DC regulated power supply, Semi Automatic Star Delta starter, Automatic Star delta starter, Automatic reverse forward starter, Single phase ... arrangement, Transformer oil ... Current Transformer
HIGH PRESSURE SWITCH- PART NO: FT0051792-005, PROGRAMMED SENSOR/EXTERNAL SMOKE DETECTOR- PART NO: FT0051863-101, TRANSFORMER 415VAC/110VAC-230- PART NO: FT0051815-008, ORI KIT VARIABLE PRESSURE REGULATOR- PART NO: FT0053765- K10
Constructing 2.513Km 11 KV line and Laying 70Mtr 11Kv UG cable from Noorukodi Transformer to Kudassanad Jn and Reconductoring existing LT 3 Ph 5 wire line under Electrical Section, NOORANAD. - Work code 552934112000164
Midterm works to mitigate the effect of flooding Lifting the position of 11kV RMUs and Auxiliary Transformer above flood level replacing LBS with new RMUs and associated activities at 220kV GIS Substation Kaloor
Clearing touchings on HT/LT lines, cutting branches of trees, bamboo clusters, coconut cudjans etc. (125.23 km), clearing and removing creepers and cleaning of transformer stations on AMC basis under Ele. Section , Peermade
Split Air Conditioner including Green AC (Q2), Extra Refrigerant Pipe for Air Conditioners(Accessories) (Q4), Metallic Mount Suitable for Air Conditioner (Accessories) (Q4), automatic line voltage corrector or step type auto transformer (Q3)
Building work
demolishing rcc brick stone rubble earthwork excavation quarry muck filling driving teak piles PCC rcc steel reinforcement plastering spreading
Feeder Control and Relay Panels 33kV 6No 110kV 48 No 220kV 3 Set Transformer Control and Relay Panels 33 11kV 4 No 110 11kV 20 No. 110 33kV 5 Set 220 110kV 3 Set
Construction of 9 M dia well cum pump house, Supply and Laying of 600 mm DI Raw Water Pumping Main, Supply and Erection of 400 KVA Transformer, Raw Water Pump set etc at Thopilkadavu
Malappuram Package No.4 - Supply and Construction of 11 kV Lines using HT ABC,along with Installation of DTRs for Development of Distribution Infrastructure on Turnkey Basis under Dyuthi Special Scheme at Various Locations under EC, Manjeri(Retender)
Please refer Tender document
Demolishing CC Earth work excavation upto 3m lift Quarry muck filling PCC Centering shuttering RCC TMT steel bars Surface excavation Filling earth Supplying stacking spreading 6mm and 40mm metal Hire charges of crane Plastering Fixing foundation bolt
(a)Upgradation of Chooliyat ALP School Eachira Muchilottu Kavu Road with Concrete in MalapattamGP (b)Upgradation of Kayaralam motta- Mecheri transformer- Kayaralam AUP School-Kiliyalam Road with concrete in MayyilGP-General Civil Work(Re-Tender)
JJM 20232024 Kottukaal Grama Panchayath Design and Construction of 6.00 LL capacity of OHSR 2.5 LL Sump pump house Design supply erection commission of CF Pump transformer Power allocationand electrification of pump house at Punnaku
Design, Construction, Commissioning and Maintenance of Intake well, Pump House, Electrical Room, Side Protection work, Approach road, Supply and Erection of Raw Water Pump sets, Transformer, Maintenance of 14 MLD WTP, Road reformation charges etc.
Design, construction commissioning of 4MLD WTP, Providing FHTCs raw/new clear water pump sets, 160 KVA transformer, RWPM and CWPM, construction of compound wall, raw water pump house, gardening of WTP area, road restoration etc..
Supplying and laying distribution system to 3 panchayaths,supplying and erecting centrifugal pump set, 100 KVA transformer with all accessories, supplying and laying 350 mm clear water pumping main, NH/PWD HDD road crossing, Construction, co
Dismantling and replacement of existing old metering panel ( size 1300x1450x300 mm) and 02 No. feeder pillers(size 750x1200x300 mm) and replacement of 95 sq.mm power supply cable from metering panel to transformer at P.F Hut area
Design, Construction, Commissioning and Maintenance of Intake Well, Pump House, Electrical Room, Side Protection Work, Approach Road Bridge, 450mm dia. Raw Water Pumping Main, Supply And Erection Of Raw Water Pump sets, Transformer and Road Reformat
Supply, Installation and Commissioning of various Testing Equipments (Partial discharge analyzer -1 No , SF6 Dew point meter - 1 No,Three Phase Transformer Turns Ratio Testing Kit- 2 Nos)at various power stations of Kerala State Electricity
Providng additional electrical requirements and setting up of Online Examination hall ( Basement floor) - Electrical AC Work.
Construction of foundation of equipment /structures and extension of existing earthmat.
Sreekariyam Flyover utility shifting works-Supply and Erection of Galvanized Steel Tubular Poles (8M meter long 540 SP-11 Swagged type), RMU on Turnkey basis and UG cable laying, LT-ABC construction, Transformer Erection with pillar foundation.
Annual Plan-MUKHATHALA BP PROJECT N O 2 3 / 2 0 2 3 - 2 4 - P A N A K K A L A M TRANSFORMER ELA ROAD AND SIDE WALL IN KURUMANNA WARD OF THRIKKOVILVATTOM GP
State Plan State Plan 2021 2022 Renovation of Electrical structures Panel boards and replacement of of old obsolete transformer at No.1 Pump house near Maharajas College Ground MG Road Ernakulam Renovation of Electrical structures Panel boards
JJM 5th SWSM- WSS to Paippadu,Thrikkodithanam..pts-Suppling,Laying,Testing, TrialRun and Commissioning of 700mm DI K9/711mm MS RWPM from RW Pumphouse at Kattodu to WTP at Morkulangara.VT pumpsets, Transformer,Pressure Filter including road restorati
SUPPLYING, ERECTING RAW WATER PUMP SETS, SUPPLYING AND LAYING RWPM, SUPPLYING AND ERECTING TRANSFORMER AT INTAKE AND WTP SITE ,POWER ALLOCATION ,MAINTENANCE OF EXISTING 9 M DIA WELL CUM PUMPHOUSE, RETAINING WALL AND OPERATORS RESTROOM AT ULLOORPADY
PLUG SPARK 899 001 0004 ZEECO PDPP, TC 32K36 UI 86 FS4 ZEECO PDPP, TC BURNBACK 32K36 UI 5 202 ZN ZEECO PDPP, TC BURNBACK 32K36 UI 6 202 ZN ZEECO PDPP, TRANSFORMER IGNITION TRS 830P ZEECO PDPP
Supply and erection of GALVANIZED STEEL TUBULAR POLES 8 METRE LONG 540 SP11 SWAGED TYPE RMUs on TURNKEY basis and UG Cable laying LT ABC construction Transformer erection with pillar foundation Dismantling of overhead lines under ES Sreekaryam
Jal Jeevan Mission (JJM)-Supply, erection and testing of Clear water pump set from Olari sump to Adatt, Tholur, Avanur, Kaiparambu panchayath-Clear water pump set andTransformer General Civil Work
Ceiling fan capacitor, Ceiling fan regulator open type, 20 Watt LED bulb, Wall fan MPP square type Capacitor, Copper wire 1 Sqmm, Copper wire 1.5 Sqmm, Copper wire 4 Sqmm, Copper wire 6 Sqmm, Street light timer Analog 240 Watt, MCB Double Pole 32 ... light, Transformer wire ... mm, Transformer wire ... mm, Transformer wire ... mm, Transformer wire ... mm, Transformer wire ... mm, Transformer wire ...
Construction and commissioning of 1.5 LL OHSR , supply. laying, testing commissioning of clear water pumping main, construction of approach roads to exiting WTP, supply and erection of 200 KVA transformer and clear water pump set at WTP site in
Drawing 600 mtrs HT ABC using HT pole from Tharatta to Nilami and installing 160KVA Transformer including reconductoring the existing old and aged LT line with LT ABC at Electrical Section Kachani CW-4691-202526-47 under Electrical Div
JJM Vellathooval Commissioning of ongoing scheme Supply laying and fixing of 3 core 150 sq mm Power cable from 11 KV two pole structure to 400 KVA Indoor Transformer at WTP Ellackal Vellathooval and obtaining Statutory Approval from Electrical Inspe
District Panchayat Laying 100mm GI pipe lines in gaps of the newly laid 110 mm PVC pipe in Malanirappu pipe line at Veliyanadu tank compound at culvert near Veliyanadu junction at culvert and transformer near Muringattupara Junction and in Cherukar
KIIFB CWSS to Ponnani Municipality and all Panchayath in Ponnani Taluk Package 3 Raw water and Clear water pump set Transformer Substation building CW Pump set for existing UWSS to Ponnani and RWSS to Ponnani and interlinking of existing CW pumping
Design Construction maintenance of 15 MLD WTP with Plate Settler Technology Lamella 6LL sump 10LL OHSR 9m intake well cum pump house substation buildings 500mm DI K9 350mm DI K9 pumping main Raw water pump sets Transformer Road restoration work
KIIFB WSS to Chazhur,Thaniam and Anthikad Panchayath Construction 12 MLD WTP,250mm DI RWPM ,Renovation of well cum pumphouse,RW and CW Pumpset,250KVA 11KV 433V Transformer,SCADA,12LL OHSR,5.5LL sump cum PH,Pressure Filter,Road restoration works etc.
Realignment of HT and LT Lines due to PWD Road widening work at Kottekad-Mundur road under ES Viyyur using A pole, realignment of existing HT and LT pole with A Pole, realignment of existing transformer DPs and line AB.
Split Air Conditioner including Green AC (Q2), automatic line voltage corrector or step type auto transformer (Q3), Extra Refrigerant Pipe for Air Conditioners(Accessories) (Q4), Metallic Mount Suitable for Air Conditioner (Accessories) (Q4), DRAIN PIPE FOR AIR CONDITIONERS (Accessories) (Q4)
Civil and electrical works of Capacity enhancement of 110kV Substation Mattanchery
General Electrical work
TRIMMER 500 (382664-1), UNIT POWER SUPPLY (NDN3305- 20), VERT ARROW ASSEMBLY (201003-0103), IC SG 1532 (351-1373-010), SYNCHRO CONTROL TRANSFORMER ( 11CT4CDEF148), BEARING TE (SR1-5K), BRUSH FLEX AND TAG (N92063/3), TRANSFORMER STEP DOWN (140139-02), VERTICAL POINTER (NDN7251-06), WHEEL ASSY COMPLETE WITH BEARING PT NO AHO-12 (AHO-A2), METER MECH VERT FAILURE WARNING (NDN9222/5), HORIZONTAL POINTER (NDN7251-07), TRANSISTOR (DT1112), CAPACITOR 180 MFD 10 50 (183-1518-010), DISK FILLER PLUG (CE2-23), ARMATURE ASSY (1230K71G703), WHEEL BALANCE (5468417P001), BEARING BALL (KLNJ1/2ZRYC)