Loading…
Loading…
3,920 results • Best match
Numerical Integrated Transformer protection relay (Over Current and Restricted Earth Fault) covering protection either HV or LV side as per RDSO's Spec. no. TI/SPC/PSI/PROTECT/6071 with A & C slip no.
Numerical single pole differential relay for traction transformer as per RDSO Spec No TI/SPC/PSI/PROTCT/6072. Relay type A23R.Over all Dimensions are as per Annexure-1. Accepted make- Firm's self (GK
Pressure Sensor 0-4 bar for Transformer of WAG-9 with accessories (Cable, washer and cannon connectors {Plug and Plug Socket}). Cable must be connected with Plug socket connector to concerning pin wit
Air blast transformer oil cooler (Radiator) with Blower motor for BHEL EMUs to ICF Spec. No. ICF/Elec/014 Rev. A & Drg. No. ICF/SK-9-0-606 Alt 'e'. Accepted Make - OWN
Supply, Installation, Testing and Commissioning of Supply of Control transformer 200 VA, 750V/ 415V for LHB Power Cars and AC Coaches (duly fitted with 2A, 1.2KV fuse link with fuse Base for primary
Dry Type Air Cooled 100VA, 750V / 110V AC Control Transformer, Type-IV, H class insulation 6KV, duly fitted with 2Amps, 1.2KV Fuse Link with Fuse base for primary and 2Amps, 500V Fuse Link
Supply and Installation of 3 Phase HOG Sequence Testing Kit with 60KVA Transformer for inspection of LHB AC and Non-AC coaches with following specifications. 1) HOG Sequence testing kit shall be suita
200 VA, Transformer, 750/110V with fuses and fuse base as per RDSO Spec No. RDSO/PE/SPEC/AC/0203-2020 Rev-0. Brands: BhaskinPackard/Trolex/Trinitron/Abrol/ NACEI/Ramyaa/ Kontact/AskPowertec only
Pressure Sensor 0-4 bar for Transformer of WAG-9 with accessories (Cable, washer and cannon connectors {Plug and Plug Socket}). Cable must be connected with Plug socket connector to concerning pin wit
Supply and Installation of 3 Phase HOG Sequence Testing Kit with 60KVA Transformer for inspection of LHB AC and Non-AC coaches with following specifications. 1) HOG Sequence testing kit shall be suita
TTPS ES Circle EM I Complete preventive maintenance of LT breakers HT breakers HT panels complete service of ABB make 6 6 kV breakers LT panels LT Modules in 6 6 kV Switchgear control room Generator Transformers UATs USTs SSTs floor cleaning in 6 6 k
NCTP S I ES Circle EM I Dn SD I Charges for 2 coats painting in Unit II Power Transformers GT 2 UAT 2A 2B respective NGR NGT GT UAT bus ducts during Unit II Annual Overhauling period for the year 2019 20 at NCTPS I
Supply Erection Testing and Commissioning of 2Nos of Main MV Panel Board for Transformer for Bio CNG Plant at Vazhudhalaimedu Main Road Chinnasekadu in Div 22 Old Div 29 Zone II
COMPREHENSIVE ANNUAL MAINTENANCE CONTRACT FOR MAINTENANCE OF ONE NO. 10 KVA 240 V DC 1PH-1PH ONLINE DOUBLE CONVERSION UPS WITH ISOLATION TRANSFORMER, NUMERIC LEGRAND PREMIUS AVAILABLE AT LT BILLING DATA CENTRE OF MADURAI REGION
Construction of Control room building, Cable duct, revetment wall, approach road, road culvert, yard filling , fencing bore well , metal filling , Transformer plinth and other civil works for establishment of Venkateshwarapuram 33/11KV SS
Fault attending in Boiler auxiliaries motors valve motors soot blower motors and preventive maintenance of Ash Silo Transformer A and B of Unit IV and V period from 08.10.18 to 31.03.19.
External cleaning of electrical equipments such as Power Transformers, Rectifier Transformers, Electronic control panels, LT Switchgear panels, cable trays etc. in ESP I,II and III for the period 08.04.18 to 30.09.18
230 KV CT for MRSS Incomers, 230 KV CT for MRSS Power Transformers
M-31/2020-21 Procurement of 63KVA/22KV/433V EEL-2 Distribution Transformers
Supply of 4000Nos of 63KVA/22KV/433V Energy Efficient Level-2 Distribution Transformers
Supply of 3000Nos of 63KVA/11KV/433V Energy Efficient Level-2 Distribution Transformers.
Procurement of 15000Nos. of 25KVA/11KV/433V Energy Efficient Level- 2 Distribution Transformers.
DPC Aluminium Wire Wound Ready Made HV Coil for 100 KVA Distribution Transformers
Supply of 5000Nos of 16KVA/11KV/433V Energy Efficient Level-2 Distribution Transformers
Supply of 6000Nos of 25KVA/11KV/433V Energy Efficient Level-2 Distribution Transformers
Design, Supply, Installation & Commissioning of" Loss Measurement Test System for Transformers & Rea (Q3)
Repairing and Reconditioning of Sick Distribution Transformers in Electricity Distribution Circles of TANGEDCO
Oil Cooler radiator 165 KW for main transformer 5400 KVA for WAG-7 locomotive to CLW Specn. No. CLW/ES/0-4 Alt-E, CLW Drg. No. CLW/ES/SK-1/0-4/E.
Supply Fabrication and Erection of Steel materials Paintings Handling and Erection of Department Equipments and materials Supply and erection of Sub Station accessories for erection of 3rd Auto Transformer at Kumbakonam 230 KV SS
Supply and Commissioning of 1250 KVA Transformer and availing of HT Supply for 14000 cum BIO CNG Gas plant 2 units at Pallikaranai old dumping ground in Div 188 Zone 14 for SWM department
TTPS ES Circle MRT I Annual Overhauling of CWP Panels System 6 6 KV HT LT Switchgear System Generator Transformer System External Auxiliary LT Switchgear System in Unit I for the year 2024 2025
NCTPS I Operation Circle O and E FF Overhauling of vertical extended shaft pump in drain oil system of station transformer 1 and overhaul andreconditioning of submergible pump erected in the Raw water Reservoir
TTPS ES Circle MRT I Annual Overhauling of CWP Panels System 6 6 KV HT LT Switchgear System Generator Transformer System External Auxiliary LT Switchgear System in Unit II for the year 2024 2025
EM I Replacement of the leaky radiators by available spare radiators in Generator Transformer R phase Sl No 6004110 84 MVA 230 kV 15.75 kV works of Unit III during the year 2022 2023
ICHP- Overhauling, internal inspection , oil leak arresting by changing of all gaskets , tightness checking of HV LV winding OLTC and allied works in 6.6KV 433V 2MVA capacity service transformer 10 14 in CHS-V.
TTPS ES Circle MRT I Annual Overhauling of CWP Panels System 6 6 KV HT LT Switchgear System Generator Transformer System External Auxiliary LT Switchgear System in Unit III for the year 2025 2026
Providing View cutter for existing TNEB Transformer at Jeganathan street, Market street, Rangasayee street, Bisset road, Loco scheme 1st street and GKM colony 9th street in Division-69, Unit-15, Zone-06.(NNT Scheme)
Oil Cooler radiator 165 KW for main transformer 5400 KVA for WAG-7 locomotive to CLW Specn. No. CLW/ES/0-4 Alt-E, CLW Drg. No. CLW/ES/SK-1/0-4/E.
COMPLETE OVERHAULING OF 100 MVA, 230/110KV, BHEL MAKE, AUTO TRANSFORMER-I, DRYING AT SITE BY SUITABLE METHOD AFTER ATTENDING LEAKS INCLUDING HOT OIL CIRCULATION, GASKET REPLACEMENT WITH REQUIRED MATERIALS AT ACHARAPAKKAM 230KV SS
Construction of control room building with Electrification works, Bore well, Providing Transformer Plinth and various SS structures Plinth foundation, Cable duct, Yard retaining wall, Road, and allied civil works at Valarpuram in Vellore EDC
Construction of control room building with Electrification works, Bore well, Providing Transformer Plinth and various SS structures Plinth foundation, Cable duct and allied civil works for 33 KV SS at Kalambattu in Vellore EDC
WF 2023-24-Attending repair and renewals of 50HP HSC MOTOR UNIT-I Thondikaradu at Sandaipettai Booster Station and 50 HP Auto Transformer Starter Unit-I at Treatment Plant and Other Works Tiruchengode Municipality.
Provision of 2000kVA, 11kV/433V transformer to the newly installed 3PF Super Computers and 300kVA UPS and shifting and re-installation of HT/LT panels to new location in Data Centre at IITM premises
Providing Lightening Arrestor , Supplying an Fixing of Polycarbonate sheet at OTS Genset Roof Top, Fencing for Transformer GENSET for 120 residential building under SFS with Stilt with 5 floors at Kalaivanar Street, Jafferkhanpet, Chennai
Providing Cement Concrete Drainage with RCC Slab in front of Anganwadi building from Thottipalayam Muniyappan kovil to Pillaiyar kovil transformer in Karavalimathapur Panchayat in Sulur block of Coimbatore District under NABARD ASSISTANCE (PHASE II)
Construction of Control Room Building extension ,Providing foundation concrete structure, Equipment Plinth, Plinth for Breaker, Transformer Plinth, Cable Duct and other Civil related works for the establishment of 110 22 kV SS at Maravanmadam
Providing View cutter (Transformer enclosure) at GKM Colony 2nd main road, 1st main road, Venkatesan salai, SRP Colony main road and Ramamoorthy colony main road in Division-68, Unit-16, Zone-6(NNT Scheme)
Wire Rope stainless steel and bulldog grips stainless steel assembly for 60 KVA transformer ,as per RCF specification : EDML 152,rev-A ( one set consist of Wire Rope Stainless Steel-01 no and Bulldog
Air blast transformer oil cooler (Radiator) with Blower motor for BHEL EMUs to ICF Spec. No.ICF/Elec/014 Rev. A & Drg. No. ICF/SK-9-0-606 Alt 'e' or latest. Make/Beand: Self
OIL COOLER RADIATOR 165 KW FOR MAIN TRANSFORMER 5400 KVA FOR WAG-7 LOCO TO CLW DRG.NO.CLW/ES/SK-1/0-4/E AND CLW SPEC.NO. CLW/ES/0-4/E Make/Brand : SELF