Loading…
Loading…
2,359 results • Best match
Manning, Operation and Maintenanace of Water Treatment Plants, pumping /Gravity Mains of various diameters, Substations, Power transformers, Pumping stations and Pumpsets under Krishna and Godavari systems for a period of two years.
REPAIR/MAINTENANCE OF HT DISTRIBUTION SYSTEM INCLUDING REPAIRS TO TRANSFORMERS, GODS, LAS EARTHINGS AND ALLIED WORKS AT ZONE II A AND D UNDER AGE E ANDM NO-II OF GE (UTILITY) SECUNDERABAD
TGGENCO - (5*800)YTPS - Extension of 3 Phase power supply from the nearest 11kV TGSPDCL line to the S&T building at Janpahad takeoff point (i.e. ch 100KM) including 63kVA DTR and distribution board at Yadadri Thermal Power Station at Veerlapalem (V), Damercherla (M), Nalgonda Dist.
Shifting of 0.57KM 33KV, 1.57KM 11KV, 0.9KM LT line and 1No.100KVA DTR which are present along vemulawada khaman to Yellamma temple for road widening work carried out by R&B Department, Siddipet in Op.Section Siddipet Town-I, Siddipet Town sub division of Siddipet Division & Circle
Shifting of 33KV 11KV LT lines and DTR structures from TSSPDCL Office Habsiguda Circle Office to DSL Mall at Ramanthapur road Both sides of the road for construction of flyover in Uppal Section of Uppal Sub Division of Habsiguda Division in Habsiguda Circle under Contribution Works
Construction of New District Stores including office building for ADE Stores Indoor Out Door shed DTR stocking plinths Security room Toilets Borewell CC Cameras and Compound wall with security fencing for the establishment of new Gadwal District Store at Gonpad Village in Gadwal Division in Gadwal Circle
Construction of New District Stores including office building for ADE Stores Indoor Out Door shed DTR stocking plinths Security room Toilets Borewell CC Cameras Compound wall with security fenciong for the establishment of new Nagarkurnool District Store at Sreepur V in Nagarkurnool Division in Nagarkurnool Circle
Construction of New District Stores including office building for ADE Stores Indoor Out Door shed DTR stocking plinths Security room Toilets Borewell CC Cameras Compound wall with security fenciong for the establishment of new Narayanpet District Store at Thipraspally V in Narayanpet Division in Narayanpet Circle
Construction of Administrative Building for College of Fisheries Science at Pebbair of Wanaparthy District. Sub work: Providing External Electrification with 11kV/433V 200kVA DTR with OLTC including Switch Yard, HT/LT Panel boards, Cables etc., to the College of Fisheries Science at Pebbair of Wanaparthy District.
Custom Bid for Services - Job Work Order for Supply installation and commission of Single Phase 5 KVA UPS with inbuild isolation Transformer
TSGENCO-HPC and HP-SLBHES- Supply of 105 KL EHV grade transformer oil conforming to IS 335 2018 for SLBHES, Srisailam, Telangana.
OVERHAULING OF 132KV 10/16MVA BHEL MAKE TRANSFORMER BY OUT SIDE AGENCY AT 132KV SUBSTATION OF MANDAMARRI AREA FOR AWS, MANDAMARRI AREA.
TSGENCO - NSHES - Design, manufacturing, supply, transportation, installation, testing and commissioning of 315 KVA transformer with all test reports to NSHES, Nagarjuna Sagar.
Laying of CC road from Transformer entrance of Pamulapeta to Hno 2-3-173 in Division No.1 of Ramagundam Municipal Corporation
Laying of C C Road from Transformer to Plot No.87 in Krishna nagar Vampuguda in Ward No.1 of Kapra Circle,
Laying of CC road from Transformer towards Shiva Durga Ladies Tailor at Krishnanagar in Ward No.15 under SFC Grant 2016-17
Providing of 3 point 5 Core 185 Sq mm cable from Transformer to PSA plant for District Hospital Nagarkurnool in Nagarkurnool District
Laying of cc road from Sri mahalaxmi to Adhinarayana house & Adhinarayana house to Transformer at Bhadraiah Colony in 8th division in JMC
O&M - IDC- Nizamabad Dist., - State Plan - Replacement of 2000 KVA Transformer for Bardipur LI scheme on Konam Cheru in Dichpally(M)
Laying of CC Road from Transformer to Existing CC Road in Kokapet village in Narsingi muncipality Under Municipal General Funds 2019-20
Laying CC Restoration by RMC Near Gineuss School to temple transformer in Chandulal baradari in Dhoodhbowli div,W19,C-10 , CHMRZ, GHMC
Laying of CC road from 30-2-298 to Transformer,Mettugutta Arch opposite street at Nehru Nagar in Madikonda, division No.34
Laying of cc road(20MM) from Transformer to hanuman tempel in wno 15 house in sangareddy municipality under scsp grants 2017-18
Laying of CC road from Cement Shop to Sharma house Near Transformer in Shadnagar Municipality in Ward No. 21 under Pattanapragathi Grants
Fixing of transformer yard fencing with support channels including spreading of gravel and dust at new Examinations building in the University campus
Construction of 2 No's Culverts at Transformer near Inauguration stone and Gudikandi Mallaiah house in ward no.12 under 15th FC Grants
Flood Damage Repairs work for 750 KVA Transformer at Manthani LI Scheme on foreshore of SRSP in Armoor Mandal of Nizamabad Dist.
Laying of CC road from Adiba Hotel to Transformer in Ward -58,Shastripuram Div in Rajendranagar Circle,-11 GHMC (Rs.11.50 Lakhs)
Restoration and restrengthening of cc road from transformer no 200267943 to NH65 in ward no 121, kukatpally of kukatpally circle-24, GHMC
O&M Estimate for supply, Transportation and Fixing of new 250KVA Transformer for M.Bagareddy Singur Projects, Singur(V),Pulkal(M), Sangareddy dist
Laying of Piped Drain from sumpt o transformer at division no 30 in Badangpet Municipal Corporation under Municipal General funds 2023-24
Construction of Storm Water drains from Transformer to RR Homes at Jillelguda Division No.18 of Meerpet Municipal Corporation under CDP Grants.
Repairs and Restoration of 630 KVA Transformer of DC-2 pumps under L-3 L.I Scheme, Mupparam (V), Nidmanoor (M), Nalgonda District
Taduvai LIS - Emergency repairs to 315KVA Transformer of Taduvai lift irrigation scheme on EnugulaVagu near Taduvai village, Munagala mandal of Suryapet district.
Construction Storm Water Drain from 17-88/1 to Transformer at Ali Nagar, Ward 25 in Jalpally Municipality under Pattana Pragathi Funds
PROVISION OF SPARE TRANSFORMER ON TROLLEY OF CAPACITY 400 KVA AT DGQA COMPLEX UNDER AGE EM NO II OF GE UTILITY SECUNDERABAD
Providing 160KVA Oil immersed outdoor type Transformer along with required switchgear at Telangana State Board for Technical Education and Training ,Masabtank, Hyderabad
Electrical enabling Works for Installation and Commissioning of 500 kVA DG Set and 500 kVA Transformer at General Hospital SS-6 substation
Manning, Operation and Maintenance of (i) 132/6.6 KV Substation having 2 Nos of 10/16MVA Power transformers along with allied equipment required spares at Peddapur 132/6.6 KV substation under EAM Cell-II, Peddapur, Transmission Division No.II, ... KVA transformers , ... auxiliary transformers along ...
Laying of CC Road from Transformer to H.No: 10-214, Transformer to H.No : 10-176/11, H.No :10-176/11 to H.No: 10-176/15/4/ and Pole No: 1215 to Pole No: 1217 in Gayatri Homes Colony Division No : 04 Meerpet Municipal Corporation, Ranga Reddy District ( Reserved for SC) (Recall)
REPAIRS / MAINTENANCE OF HT DISTRIBUTION SYSTEM INCLUDING REPAIRS TO TRANSFORMERS , GODS, LAS EARTHINGS AND ALLIED WORKS AT RESIDENTIAL AND TECHNICAL COMPLEX OF DGQA UNDER AGE E/M NO-II OF GE(UTILITY) SECUNDERABAD.
REPAIRS / MAINTENANCE TO EXTERNAL ELECTRIFICATION SYSTEM COMPRISING HT OH / UG CABLES, VCB, TRANSFORMERS, 4 POLE AND 2 POLE STRUCTURES AND CONNECTED ALLIED WORKS AT AFS BEGUMPET AND ORC ENCLAVE UNDER GE (AF) HAKIMPET
KTPS-VII Stage-ADM-SS-Rewinding and replacement of spares 05 Nos 100KVA and 01 No 250KVA Aluminum winding Distribution Transformers in General Services sub division of SS division of KTPS VII Stage
Carry Out Routine Maintenance with Round the clock services for Operation and Maintenance of 33/11KV substation with connected Distribution Transformers and switchgear at Manikguda pumping station under Asifabad division KB Asifabad segment
Repair to Transformers at Devarakonda ULB Sump, Gagillapur IPS, Pendlipakala WTP ,Kodandapur WTP Filter Bed ,PD Pally WTP and PD Pally Intakewell of AKBR Segment with an Estimate cost of Rs: 50.00 Lakhs
KTPS-VII Stage-ADM-SS-Rewinding and replacement of spares 05 Nos 100KVA and 01 No 250KVA Aluminum winding Distribution Transformers in General Services sub division of SS division of KTPS VII Stage
Construction of Sump cum Pump house including pumping equipment and accessories, Staff Room, Store room, Wash rooms, Compound wall, drilling of 6 1/2" Bore well and Relocation of Transformers at Bowenpally junction
Major Irrigation - Jogulamba Gadwal District - Estimate for procuring of Voltage Transformers ofratio 11 KV / 110 V/ 110V for 11 KV switch gear in Stage - I pumping stations at Dharur Mandal, Jogulamba Gadwal (Dist)
TGGENCO - SOLAR Project - PDPL - Construction of Foundations for Transformers, Inverters, Lightening Arresters, Cable Trench, Switch yard Poles, 33KV HT Panel and Aluminium partition in control room at 12th mile Solar Power Plant, Peddapalli.
Construction of Sump, Reconstruction of Meeting Hall with staff Quarter, Shifting of /Reinstallation of Existing 40KW Solar Plant and Relocation of Transformers at Balamrai - Near Paradise of Secunderabad Cantonment board on NH 44