Loading…
Loading…
15,095 results • Best match
Ward No. 03 Majhola me Anuj Kumar ke makan se Transformer tak Solar Light lagane ka karye.
Majhola Amrit Sarovar me Dr. Vijay Goswami ke makan se Transformer tak Solar Light lagane ka karye.
Ward No-41 Haji Ikram Doodh Dairy se Transformer tak RCC dwara naali va sadak sudhar karye.
1. Supply of Transformer, Dx 807, Part No-24-0046-00 of existing Atomic Absorption spectrophotometer, 2. Supply of Assembly, Power Supply SensAA, Part No-97-2696-00 of existing Atomic Absorption spectro, 3. Supply of Emission Source Hallow Cathode Lamp consisting of combined Six elements Chromium, Iron, 4. Installation of above three spare indented items as mentioned at S. No-1 to 3 to the main existing
Repairing of 11/0.4kv 10,16 and 25 KVA cylindrical Body CRGO Shell Type Damaged Transformer at Jaunpur Workshop Jaunpur Under EWD Varanasi
Repairing of 11/0.4kv 250 KVA (Copper) 400 and 630 KVA Copper wounded Damage Transformer at Gorakhpur Workshop Gorakhpur Under EWD Gorakhpur
Repairing of 11/0.4kv 10,16 and 25 KVA cylindrical Body CRGO cell Type Damaged Transformer at Jaunpur Workshop Jaunpur Under EWD Varanasi.
Repairing of 11/0.4kv 10,16 and 25 KVA cylindrical Body CRGO Shell Type Damaged Transformer at Azamgarh Workshop Azamgarh Under EWD Azamgarh
Repairing of 11/0.4kv 10,16 and 25 KVA cylindrical Body CRGO cell Type Damaged Transformer at Jaunpur Workshop Jaunpur Under EWD Varanasi
Installation of Additional 11/.4 KV 250 KVA DTR MANAS NAGAR, etc place T/F and 250 KVA add. T/F reduce of 630 KVA at in the area of UEDD-VII, VNS under System Augu. Stren. Plan 2023-24
EE EDD-Ist, Chandauli under Electricity Distribution Sub-Division-Ist, installation of PCC poles between STP poles, DTR poles, HT poles at the following places, by installing ABC conductors, to make the line running smoothly and to the old poles.
Installation of Additional 11/.4 KV 250 KVA DTR near Existing 400 KVA Usha Gupta, Bangali Tola, Muslim Girls Inter College Lallapura, etc place area in Uedd-IV and Harsewanand Hospital Newada, etc place Varanasi under Add. BP 2023-24
Repairing and Overhauling of Power Transformer at 33/11 KV Sub Station Chwok, Amaniganj and Centrifusing odf Power Trasformer of 33/11 KV Sub-Station Mumtaj Nagar 2x10, Naka 2x10 and Deokali 1x5 and 1x10 under EDD-Ist, Ayodhya
AS DESCRIBED IN BOQ
REPAIR OF 33 KV VCB PANEL AND PREVENTIVE MAINTENANCE OF TRANSFORMER FOR RESTORATION OF SOLAR POWER PLANT AT CRDC GREATER NOIDA
Supply Installation and commissioning of Test 11KV-33KV /433V Transformer testing Bench (OC, SC, DVDF, HV and TURNS RATIO TEST) for Major workshop center Varanasi under EWD ,Varanasi
Replacement of 40 MVA old Transformer and Erection of 63 MVA 132/33 KV transformer and Strengthening of 132 KV Main Bus Bar along with 132 KV Main Bus Section Isolator at 132 KV S/S Aligarh - V under ETD-I, Aligarh
THE WORK FOR COMMISSIONING AND REPLACEMENT 01 NO. 20 MVA TRANSFORMER BY NEW 40 MVA TRANSFORMER AGAINST INCREASING CAPACITY FROM (2 x 40 plus 1 x 20 MVA) TO (3 X 40 MVA) AT 132 KV SUB-STATION THAKURDWARA UNDER ETD-I, MORADABAD
PROVN OF TROLLY MOUNTED 630 KVA TRANSFORMER AND RETROFIT EMISSION CONTROL DEVICE (RECD) IN DG SET, SPECIAL REPAIR FOR 02 BER TRANSFORMER AND CONVERSION OF BALANCE LT OVERHEAD LINE INTO UG XLPE CABLE THE VARIOUS LOCATION AT AYODHYA UNDER AGE (I) AYD
const. of interlocking and drain back side of Manmohan Ashram from h/o of N.K Mishra via transformer to h/o Rathore from masjid to h/o Roze ali from Transformer to h/o Md Azim at gayatri nagar Faizullaganj fourth ward.
Replacement of 20MVA Transformer by 40MVA Transformer alongwith other associated Works at 132KV S/S Bilsi including Loading of 40MVA T/F at 132KV S/S/ Bisauli, its Carriage from Bisauli to Bilsi and Unloading at 132KV S/S Bilsi under ETD, Budaun
Tender for work of Replacement of damage 5MVA Transformer by healthy 5MVA Transformer with loading unloading and 11KV XLPE cable to resume the supply of area 33/11KV S/s Chathiya,Hardoi of EDSD-I,Shahabad under jurisdiction EE,EDD-I, Hardoi
Supply of Distribution Transformer M-12 H.T. Bushing Rod for 10 100 KVA made of Aluminium Supply of HT Bushing Rod, made of Brass, suitable for 250/400/630 KVA as per reverent IS 3347(Part-III/Sec 2) 1982 with Latest amendment
Increasing Capacity of 03 Nos 250 and 400 KVA. Distribution Transformer installed at different places in the work area of 33/11 KV Sub Station Vikas Nagar, against sanction package No 577 578 and 579 Under Business Plan 2023 24. Under jurisdiction
The work for construction of new LT line by AB Cable increasing capacity from 100 KVA to 250 KVA distribution transformer at 2 nos different places Naugawan school no 2 and Karbala of new Nagar Panchayat Naugawan Pakadiya Pilibhit under s s Rooppur
REPAIR/MAINT TO LT OH LINES, UG CABLES, SERVO VOLTAGE STABILIZERS, ISOLATION TRANSFORMERS AND OTHER CONNECTED ITEMS AT AF STN SARSAWA UNDER GE (AF) SARSAWA
Carriage of various equipment for erection of 13 33 KV 40MVA Transformer bay at 132KV SS Khaga under ETD Fatehpur
PROVISION OF VCB FOR POWER HOUSE (HAPPY HOME) AND 400 KVA TRANSFORMER WITH CONNECTED ACCESSORIES FOR AUDITORIUM COMPLEX AT BAMRAULI.
Replacement of damaged gaskets and Oil Seals of Various Parts of 01 Nos 5 MVA and 01 Nos 10 MVA 33-11 KV Power Distribution Transformers under EUDD 2 GZB
Overhauling and Servicing of OLTC Of 220 KV of Above Voltage Class Transformers installed at Various 220Kv and 400 KV Sub-Stations Under Transmission South-West Zone, Agra
Procurement of Measuring instrument, Aluminum Lug, Industrial Vacuum Cleaner for EMD-lll, EMD-II CTPS and CHP and spares of HT Transformers of Unit 9 DTPS HTPS Kasimpur
Carriage of medium power damaged/repaired distribution transformers of different capacity in the municipal limit of Moradabad Town under the jurisdiction of Electricity Urban Distribution Division-I, Moradabad
Increasing capacity of 25 KVA to 63 KVA distribution transformers in jurisdiction of Electricity Distribution Division- IInd (Amethi), Jagishpur, Tiloi, under Business Plan 2022-23 And 23-24.
WORK OF PROVIDING AND FIXING OF AUXILIARY CONTACTORS AND OVERLOAD RELAYS IN MARSHALLING BOX FOR AUTO - OPERATION OF COOLING FANS OF TRANSFORMERS AT VARIOUS SUBSTATIONS UNDER ETD HAMIRPUR
Repairing work of HT, LT lines, transformers etc. for uninterrupted supply during Durga Puja, Dashara, Historic Bharat Milap and Deepawali festival under 33/11 KV substation Kadipur Pratapgarh.
Repairing work of HT, LT lines, transformers etc. for uninterrupted supply during Durga Puja, Dashara, Historic Bharat Milap and Deepawali festival under 33/11 KV substation Dahilamau Pratapgarh.
Repairing work of HT, LT lines, transformers etc. for uninterrupted supply during Durga Puja, Dashara, Historic Bharat Milap and Deepawali festival under 33/11 KV substation Rupapur Pratapgarh.
Carriage of medium power damaged/repaired distribution transformers of different capacity in the municipal limit of Moradabad Town under the jurisdiction of Electricity Urban Distribution Division-I, Moradabad
Under the Business Plan Year 2024-25 Scheme, the work of changing the packing of power transformers installed at 33/11 KV sub-stations under EUDD-II, MZN
Laying of XLPE cables and centrifuging of transformers oil 05 nos In 33 11 KV newly constructed sub station switch yard area in B TPS HTPS Kasimpur Aligarh
Carriage of medium power damaged/repaired distribution transformers of different capacity in the municipal limit of Moradabad Town under the jurisdiction of Electricity Urban Distribution Division-III, Moradabad.
Carriage of medium power damaged/repaired distribution transformers of different capacity in the municipal limit of Moradabad Town under the jurisdiction of Electricity Urban Distribution Division-II, Moradabad
Repairing work of HT, LT lines, transformers etc. for uninterrupted supply during Durga Puja, Dashara, Historic Bharat Milap and Deepawali festival under 33/11 KV substation Babaganj Pratapgarh.
Work of Capacity enhancement and Regrouping of 10 to 25kva,25 to 63 kva,63 to 100kva and 250 to 400 kva Transformers under Business Plan 2023-24.
Work of Capacity enhancement and Regrouping of 10 to 25kva,25 to 63 kva,63 to 100kva and 250 to 400 kva Transformers under Business Plan 2023-24.
Work of increasing the capacity of new overloaded transformers and replacement of dilapidated ABC under the Business Plan Year 2024-25 Phase-2 under Electricity Distribution Division Mehdawal.
M/o Water Supply (Two Years Annual Repairing of V. T. Motor, Starter, TPMO, Transformers etc. of Network-50, 50 (B), 51, 76, 77 and Village-Hoshiyarpur), Noida.
Work of Capacity enhancement and Regrouping of 10 to 25kva,25 to 63 kva,63 to 100kva and 250 to 400 kva Transformers under Business Plan 2023-24.
Work of shifting of 11 KV, LT lines and transformers hindering road widening in the Pradhan Mantri Gramin Sadak Yojana, on semi turnkey basis under EDD-I Pratapgarh
Carrying out various work for Testing of 33 KV VCB and Power Transformers Marshing Box installed at various 33 KV Substation in the jurisdiction of SE, EUDC, Mathura