Loading…
Loading…
15,100 results • Best match
Supply and General maintenance of Isolator Jaw Isolator Blade Transformer Bushing Isolator Clamp CT Clamp etc at various substations under ETD Mainpuri
Construction of road and Drain By HMP in Ward No. 70 Nakha Sport College Road to Umashanker Gupta Transformer and Mazar road.
Work of increasing capacity of transformer in additional BP 2024-25 in area of 33/11 kv sub stations under EDD Siddharthnagar
Replacement of Gaskets of 20MVA Transformer-I (BHEL make) alongwith other associated Works at 132KV Substation Bisalpur, Pilibhit under E.T.D.-II, Bareilly
Centrifuging of Transformer Oil of 315MVA ICT-II alongwith other associated Works at 400KV Substation Bareilly under E.400KV Substation Division, Bareilly
Construction of Interlocking and drain from Tufail Furniture to transformer in front of Ramzan in Ward No-20/10 Moh-Kasaitola/Beldarantola
Online partial discharge test of various transformer and reactor installed at 400 KV Substation Aligarh under Electricity 400 KV Substation Division Aligarh
WARD NO. 2 SINGROSI ME MUNNA PATHAN PUTRA LAIQ KHAN H.NO. 303 KE GHAR SE TRANSFORMER TAK NALI, INTERLOCK KA NIRMAN KARYA.
Providing Vehicle with manpower for Cartage of damaged / repaired transformer in Towns under EE,EDD 2nd Ramnagar UNDER EDC BARABANKI, MVVNL, BARABANKI
Repairing of 250 KVA 33/0.4 KV PME Make damaged station Transformer installed at 220 KV S/S Mirzapur under ETD, Mirzapur
For Installation of 11/0.4KV, 250KVA Transformer and Construction of HT Line at Anand Nagar Kandawa, Varanasi under Business Plan 2019-20.
Shifting work of 250 KVA AND 100 KVA Transformer near Omega hotel to near shelter house railway road under EUDD-III, Muzaffarnagar
REPLACEMENT AND MOUNTING OF NEW/REPAIR 01 NO 5 MVA DAMAGED TRANSFORMER TO SITE BY INVITING RUNNING E TENDER UNDER EDD DIBAI.
Residual Life Assessment Test of 40 MVA, 132 33 KV Transformer Alstom Make at 220 KV SS Atrauli under ETD II Aligarh
Erection and Commissioning of 63MVA Transformer alongwith other associated Works at 132KV S.A.S. Sub Station Bisal Pur, Pilibhit under E.T.D. - II, Bareilly
Construction of 06 nos. new Transformer plinth in different places in thea area of E.D.S.D.-II, under Electricity Distribution Division-I, Unnao.
M/o Sewerage (Two Years Annual Repairing of Non Clog Submersible Motor, Pump, Automatic Starter, Transformer, TPMO etc. at SPS-43), Noida.
WORK OF CAPACITY INCREASING OF TRANSFORMER AND REPLACEMENT OF G.I. WIRE AND OTHER WORK IN ADDITIONAL BUSINESS PLAN UNDER EDD 1 MORADABAD
REPLACEMENT OF 145KV SF-6 CIRCUIT BREAKER AT 132KV SUB STATION GOLA AND ALL ASSOCIATED WORK ON 40MVA TRANSFORMER UNDER ETD LAKHIMPUR.
Drain construction work by RCC from the junction to the transformer in Indrapuram, 100 feet road, zone-3 Tajganj compartment number-77.
Rewinding and Repairing of 63 KVA 1100/0.433 KV Transformer at Aravali Bhawan in Ward No- 50 Panki Shatabdi Nagar Tubewell kapur.
Ward number 28 Chaturvedi Bhavan se Transformer Hote Hue Malin Basti ke vibhinn Galiyon Mein Nali aur CC Sadak Ka Nirman Karya
Construction of Interlocking Road From Dr. Saleem Plot to Transformer/Puliya Moh. Afganan Ward No. 5/6 at Nagar Panchayat Sahaspur Bijnor
FOR SUPPLY OF 02 NOS. DIFFERENTIAL RELAY FOR 132KV TRANSFORMER C and R PANEL AT 132KV SUBSTATION MSKP UNDER ETD-II, KANPUR.
Replacement of Gaskets of 20MVA Transformer - II (NGEF make) alongwith other associated Works at 132KV S.A.S. Sub Station Sahaswan under E.T.D. Budaun
Replacement of Complete Gaskets of 40MVA Transformer( EMCO make) along with other associated Works at 132KV Sub Station Budaun under E.T.D., Budaun
Construction of a concrete road from the transformer near Jagdish Vihar Chowk to S.N. Saxena in Ward-23, Indira Nagar, Rajendra Nagar.
e-Procurement of stores- Semi Automatic Transformer Oil Break Down Voltage Testing Machine up to 60 KV for GE E/M Lucknow.
Set of hotel load bushing gaskets (Location A,B,C) for 7775 KVA 3-phase transformer of WAP-7 loco, ABB part
THE WORK OF MAKING NEW EARTHING OF RECTANGULAR SHAPE OF TRANSFORMER NEUTRAL AND LA GRID AT 400KV SUBSTATION DIVISION I MURADNAGAR GHAZIABAD
SPECIAL REPAIR FOR REPLACEMENT OF 02 NOS BER TRANSFORMER AND CONNECTED ITEMS AT DRONACHARITA IN AYODHYA CANTT UNDER AGE (I) AYODHYA CANTT.
Construction of TF Plinth and Transformer Bay for Increasing Capacity 2x63 to 2x63 1x40 MVA at 132 33 KV Sub Station Ballia
Nagar Panchayat Dasna mai ward 13 mai kamele ke pass sarkari transformer se talab tak kude (legecy waste) ke nistrayan ka karya
WARD NO. 21 ME PARSHURAM CHAURAHE SE PURAB TRANSFORMER SE ITI HOTE HUYE INTERLOCKING SADAK TAK CC ROAD V NALI NIRMAN KARY.
Ramrepur ward mein Joshi Ji ke gate se Transformer hote hue Ranjeet Singh ke ghar se Anmol Tripathi ke ghar tak marg
Improvement of side Patri and Drain from h/o Pooja Tiwari to Transformer at Deffence Coony in Ward 28 under Zone 02
S/F of External Electrification of 15 Nos. Pole, Transformer oil Filling and S/I of Mud Pump AT Kisan Bazar Lucknow.
REPAIR / MAINT OF HT CABLE, SWITCH GEAR, TRANSFORMER AND OTHER EQUIPMENTS UPTO 11 KV AT 4 AFSB VARANSI UNDER GE (AF) GORAKHPUR
REWINDING and REPARING OF 200 H.P. Auto Transformer Unit no.03 And Repairing of 180 h.P. Starter Unit no.01 Gujaini Jalkal.
Transportation Installation and Commissioning of 40 MVA 132 33 KV Transformer for increasing capacity of 220 132 KV sub station Atrauli Aligarh
For details of repairing, maintenance of DVDF, Oven, HT, LT Binding Machine etc installed at different transformer repairing workshop under EWD Prayagraj.
M/o Sewerage (Two Years Annual Repairing of Non Clog Submersible Motor, Pump, Automatic Starter Transformer, TPMO etc. at SPS-115) Noida.
Drain and interlocking work from transformer in Lohamandi Zone, Room No. 11 Rui Ki Mandi to Tikam Singh house via Pritam house.
Fabrication and Erection of Single Decker Trolley of Heating Chamber Electricity Transformer Repairing Workshop Sohawal, Akbarpur, Sultanpur and Gauriganj under EWD - Ayodhya.
ARRESTING OIL LEAKAGE FROM 132/33 KV 40 MAT AREVA MAKE TRANSFORMER AT 132KV SUBSTATION MANDUADIH UNDER ELECTRICITY TRANSMISSION DIVISION-I, VARANASI
Block-Gagha Gram Panchayat Mahukol mein Arun Dubey ke Khet (Transformer) se Jai Prakash Gupta ke Ghar Tak CC Road ka Nirman
Construction of TF Plinth and Transformer Bay for Increasing Capacity 2x63 to 2x63 1x40 MVA at 132 KV Sub Station Dohrighat Mau
Ward number 9 Indraprasth Colony Mein mukhya Marg se transformer Yadav medical tatha vibhinn Kacchi sadkon Mein cc sadak aur rcc nali
Construction work of parapet wall of drain from Chairanga temple to transformer in Hariparvat Zone, Room No. 72, Nagla Padi Durga Nagar.
Construction of TF Plinth and Transformer Bay for Increasing Capacity 2x63 to 3x63 MVA at 132 KV Sub Station Mau New Mau