Loading…
Loading…
15,058 results • Best match
CARRAGE AND REPLACEMENT OF DAMAGE TRANSFORMERS WITHIN 24 HOURS UNDER EDSD-2(BHINGA), EDD SHRAVASTI
CURRENT TRANSFORMER 33 KV RATING, POTENTIAL TRANSFORMER 33 KV RATING
Transformer Tank Assy
FOR SAFE LOADING CARRIAGE AND UNLOADING AND PROPER STACKING OF 10 KVA TO 100 KVA DAMAGED REPAIRED TRANSFORMER FROM DIFFERENT TRANSFORMER REPAIRING WORKSHOP CENTER UNDER EWSC VARANASI TO ELECTRICITY WORKSHOPS CENTRE UNDER EWD PRAYAGRAJ
For repairing of 10 and 16 KVA (Shell Type Core) Damage Transformers at Workshop Naini Dist. Prayagraj under EWD Prayagraj
Replacement of transformer 250 to 400 KVA Transformer at EDSD Ist under EDD Chauri Chaura
REPLACEMENT OF DAMAGED DIST. TRANSFORMERS IN THE AREA OF REPLACEMENT OF DAMAGED DIST. TRANSFORMERS IN THE AREA OF EUDD-1 ALIGARH
Pipe Earthing of Transformers under EDSD Semariyanva under EDD Mehdawal.
Testing of 500 MVA, 400/220 KV Power Transformer at Electricity 400 KV Substation Panki, Kanpur
Oil Testing of Power Transformer installed at various substation under Electy. Trans. Division- Pratapgarh and Fatehpur
CONSTRUCTION OF FIREWALL BETWEEN TWO POWER TRANSFORMER AT 33/11 K.V. S/S, SUDAMAPURI, DISTRICT-SITAPUR
Work of Maintenance and Repair 01 Nos Power Transformer under 33/11 KV Sub-Station Rajapu
Painting of 100 MVA Power Transformer IMP make at 220 KV SS Faridpur Under ETD Bareilly
Replacement/Repairing of LT Cable and Damaged Earthing of Medium Power Transformer under EDD-I, Mainpuri.
Construction of fire wall and Maintenance of Power Transformer Plinth at 33/11 KV SS Araul.
Construction of fire wall and Maintenance of Power Transformer Plinth at 33/11 KV SS Bilhaur.
Transformer Carries under of EDD-Phoolpur
Transformer Maintenance under EDD 1st Mau
Transformer carriage in edsd IIIrd kannnauj
For Replacement of Damaged Gasket and Oil Seal of Various Part of 10 MVA 33/11 KV Power Distribution Transformers and Stopping Leakage of Transformers Oil from Radiators, Bucholz and Others Sides to Save the Transformers, Under EUDD-III, Meerut.
Installation of 11/0.4 KV distribution transformers and capacity increase of 11/0.4 KV distribution transformers under Power Distribution Division-Kopaganj in BP 2025-26
Distribution Transformers augmentation and additional installation of distribution transformers under business plan 2025-26 in the area of EDC-II, Mathura on Semi-turnkey basis
The Work of Construction of Transformers Plinth and fancing and earthing of Transformers of 250 KV AND 400 KV under EDD-IV, Iglas, Distt. Aligarh.
Shifting of Existing 33 KV Line 11 KV Line LT Line and Distribution Transformer and New Construction of 33 KV Line 11 KV Line LT Line and Distribution Transformer at Hamirpur to Rath State Highway 42 Chainage 2.065 to 74.85 Km District Hamirpur
A total of 40 works under the EDD-Mehdawal, respectively, 36 works of capacity increase work of overloaded distribution transformers, 3 works of trolley transformer installation work, work of separation of Pachpokhari Indodutch feeder on semi turnkey
For the Work of Re-Construction of Plinth, Water Level Earthing of Transformer, Wire Mesh Fencing etc. and Related Works of Temporary Shifting from Present site of 630/400 KVA Transformers (2 No.) Under EUDD-V, Meerut.
Execution of work of Loading-Carriage-unloading of damaged distribution Transformers from site of its damage up to Store Centre/Repair Workshop and its proper stacking and Loading-carriage-unloading of repaired/healthy transformer from Store Centr
Current Transformer Ru7403296940 Panki Project (Q3), Current Transformer Ru7403296958 Panki Project (Q3), Potential Transformer Ru7403400127 Panki Project (Q3), Potential Transformer Ru7403400135 Panki Project (Q3)
Current Transformer Ru7403296940 Panki Project (Q3), Current Transformer Ru7403296958 Panki Project (Q3), Potential Transformer Ru7403400127 Panki Project (Q3), Potential Transformer Ru7403400135 Panki Project (Q3)
Current Transformer Ru7403296940 Panki Project (Q3), Current Transformer Ru7403296958 Panki Project (Q3), Potential Transformer Ru7403400127 Panki Project (Q3), Potential Transformer Ru7403400135 Panki Project (Q3)
For repairing of 25, 63 and 100 KVA Damage Transformers at Workshop Naini (New Shed) under EWD Prayagraj
Supply of Copper Delta Wire Size Dia 2.00 mm with ten paper covering special (s) for Distribution Transformer
VARIOUS ELECTRICAL WORK DISTRIBUTION TRANSFORMER CAPACITY ENHANCEMENT STRENGTHENING OF 11 KV LINE, NEW AND REPAIRING OF LT LINES
Supply of Copper Delta Wire Size Dia 2.00 mm with ten Paper covering special s for Distribution Transformer
Supply of Copper Delta Wire Size Dia 2.90 mm with ten Paper covering special (s) for Distribution Transformer
For Increasing Capacity of Existing Distribution Transformer under Business Plan 2026-27 scheme Under EDD- Shahjhanpur Road, Bareilly
Oil testing (DGA, Tan Delta, PPM) of various Transformers under ETD Shahjahanpur
Supply of 42 nos. 63MVA, 132/33KV Power Transformers ESD-617
M1129116001: Silicon Based Transformer Oil for Rectifier Transformer in ESP OF NTPC MEJA
Centrifuging of transformer oil of 40MVA-I transformer at 132KV sub station Sandila
REPLACEMENT OF TRANSFORMER WITH ENERGYD EFFICENT TRANSFORMER AT PRAYAGRAJ UNDER GE (WEST) PRAYAGRAJ
Construction of New Transformer, Capacity Increasing of Transformer and repairing of LT Line
Replace damage transformer with another repair transformer at biwar substation under EDD hamirpur
Repairing of 250 KVA Aluminum, 250 KVA Copper and 400 KVA Damage Transformers at Manjhanpur Workshop Distt Kaushambi Under EWD Prayagraj
for Repairing of 10, 25, 63 and 100 KVA Damage Transformers at Bhadohi Shed B Workshop Distt Mirzapur Under EWD Mirzapur
RISHABH Core Balance Current Transformers (CBCT) (BHEL), Size As per
Construction of 11KV line and Installing Transformers under deposit scheme
Onsite Maintenance of Medium Damaged Distribution Transformers under District Saharanpur
Loading Unloading and Replacement of various capacity damaged distribution transformers
Replacement of burnt/damaged medium power transformers edd siddharth nagar