Loading…
Loading…
5,596 results • Best match
Supply and installation of Split Type AC machines transformer and allied electrical works at Directorate of Forest wildlife Headquarters 3rd Floor Bikash Bhawan Salt Lake Kol 91 Supply and installation of AC machines
ENERGISATION BY INSTALLING TRANSFORMER AND OTHER ACCESSORIES FOR EFFECTING 3 PHASE STW SERVICE CONNECTION TO BE INSTALLED UNDER RIDF-XXIV IN THE DISTRICT OF COOCHBEHAR UNDER COOCHBEHAR AI DIVISION AT BANSHRAJAWITHIN BOXIRHAT CCC
ENERGISATION BY INSTALLING TRANSFORMER AND OTHER ACCESSORIES FOR EFFECTING 6 NOS 3-PHASE STW SERVICE CONNECTION TO BE INSTALLED UNDER RIDF-XXI PROGRAMME IN THE DISTRICT OF COOCHBEHAR AT JONGRA WITHIN NEWTOWN CCC
ENERGISATION BY INSTALLING TRANSFORMER AND OTHER ACCESSORIES FOR EFFECTING 6 NOS 3-PHASE STW SERVICE CONNECTION TO BE INSTALLED UNDER RIDF-XIX PROGRAMME IN THE DISTRICT OF COOCHBEHAR AT KASHIYABARI WITHIN NEWTOWN CCC
Pre-Monsoon Maintenance repair work of switchgear, transformer, VCB,H.T. Relay,ACB,MCCB, L.T. Starter, control panel including allied works and operation and running routine maintenance of VT pumps at Kurebhanga pumping stations
URGENT REPLACEMENT OF DAMAGED ELECTRO MAGNETIC RELAYS PROVISION OFEXTERNAL DC POWER SUPPLY OF TRANSFORMER 1 FEEDER PANEL OF BIECCO MAKE HT OCB 6600V 800A WITH OTHER ALLIED WORKS AT BANGUR STP UNDER MDPS.
Construction of Drain at Puyan from Puyan PHC Transformer to towards Ougdhar Panda Eco park outer boundary wall, GP- Haripur JL No- 312 Plot No- 1537, under Dantan II Panchayat Samity, APP-67547636
Construction of Cement Concrete road From Ajghar House to Transformer at ward no- 13 under APAS scheme Booth No-32/16 Scheme ID- APAS/01/032/16/0004 (Mannatoli SSP) within Dalkhola Municipality.
Construction of Cement Concrete road From Ajghar House to Transformer at ward no- 13 under APAS scheme Booth No-32/16 Scheme ID- APAS/01/032/16/0004 (Mannatoli SSP) within Dalkhola Municipality.
Construction of Paddy Go down (5000 MT) at Manbazar Purulia (Balance Work) Construction of Approach Road installation of Transformer and Security Deposit to WBSEDCL under Purulia Division PWD during the year 2019-2020.
Upgradation of CC Road from Naya Busty Electric Transformer to I.J. Pradhan House at Part No 205, within Champasari G.P. under Matigara Development Block (Part No. 25/205) (APAS/01/025/205/0003)
ENERGISATION BY INSTALLING TRANSFORMER AND OTHER ACCESSORIES FOR EFFECTING 3-PHASE MDTW SERVICE CONNECTION TO BE INSTALLED UNDER RIDF-XXI PROGRAMME IN THE DISTRICT OF COOCHBEHAR AT UTTAR PURBA BALAKURA WITHIN SAHEBGANJ CCC
UPGRADATION OF THE FINAL SETTLING TANK AREA BY CLEANING AND REMOVAL OF FLOATING WEEDS, HYACINTHS ETC IN BETWEEN THE OUTFALL THROUGH NORTH-EAST STRETCH TO THE 33KV TRANSFORMER YARD WITHIN FST AT IGWTP
REAR INSULATOR COLLECTOR R PHASE CG2821, REAR INSULATOR COLLECTOR Y PHASE CG2822, REAR INSULATOR COLLECTOR B PHASE CG2823, SIDE CABLE BOX CG2222, DIGITAL PROTECTION RELAY CGP154, EPOXY RESIN CAST POTENTIAL TRANSFORMER 1 CG98N04
Manufacture, testing, supply and delivery of SCADA Compatible 11 KV Outdoor Non-extensible 4 Way 2 nos LBS and 2 nos Feeder Ring Main Unit for oil cooled 630KVA and 315 KVA Transformer
Custom Bid for Services - TESTING AND SERVICING OF VCB, Custom Bid for Services - THIRD HARMONIC TESTING OF LA, Custom Bid for Services - IR AND PI OF HT CABLE VCB XMER, Custom Bid for Services - TESTING OF RELAYS, Custom Bid for Services - ... - TRANSFORMER OIL ... - TRANSFORMER OIL ... - TRANSFORMER RELATED ...
(a)Design, Drawing, Supply, Erection, Testing & Commissioning of 25KV A.C. Single Phase Overhead Equipment , LT supply transformer etc. in connection with LLH- Development of OHE Line, dedicated Road cum Rail truck with pit provision for starting POH of EMU coach at Liluah Workshop of Eastern Railway. (b)Electrical (G) works in connection with Liluah Re-modelling & Re- construction of ICF Bays into LHB compatible Bay of Eastern Railway. (c)Electrical (G) works in connection with Liluah - Infrastructure development of MLR of LHB Coaches of Eastern Railway.
Construction of new 33/11 KV Indoor type GIS Sub-Station with (2x10) MVA transformer within the housing project of The Soul at Rajarhat under Bidhannagar Division-II under Bidhannagar Region through Turnkey Mode.
Construction of Black Top Road from Malatipur Transformer to Anup Nagar High School via National Highway at Malatipur G.P under Chanchal-II Block in the district of Malda. (Length-2700 M, Width- 3.75 M).
Operation and maintenance of Intake Pumping Arrangement, 11 by 0.433KV substation , 800KVA transformer and other electro-mechanical accessories at Intake Point Sultanpur of Southern Sector under Malda Arsenic Area Water Supply Scheme, Phase II
Upgradation of Road from Hirapur WBSEDCL transformer towards Hirapur KK High School under Deriachak GP within Kolaghat P.S. in the District of Purba Medinipur. Mouza - Deriachak, JL no. 318, Plot no. (Start point) -2986
Construction of Surface Drain from Jay Mitra to Samir Ghosh (in front of Transformer) 2) Construction of Surface Drain in front of Pradhan Mantri Jano Aushudhi Kendra .. in Ward No-14 under Dankuni Municipality
ENERGISATION BY INSTALLING TRANSFORMER AND OTHER ACCESSORIES FOR EFFECTING 3 PHASE STW SERVICE CONNECTION TO BE INSTALLED UNDER RIDF-XXIV IN THE DISTRICT OF COOCHBEHAR UNDER COOCHBEHAR AI DIVISION AT BAKSHIKHAMAR WITHIN OKRABARI CCC
Replacement of damaged HT cable (11 KV) along with other allied work located in between existing one no. transformer to HT panel at CWPS, Phase-I under Baranagar Kamarhati 30 MGD water treatment plant.
Supply Installation Testing and Commissioning of 500 KVA 33KV 433V 3 phase 50HZ Dyn11 outdoor ONAN type Transformer and allied works for 2nd Additional Utterbhagh Pumping Station within Block and PSBaruipur DistSouth 24 Parganas
Routine,preventive,breakdown maintenance for regular operation of Electrical substations including LT repairing works (Excluding cost of major materials and transformer oil but including cost of necessary tools etc.) at college Street, Economics,C.U
Operation and maintenance of Pumping Machineries, Sub-Station (11/0.433KV, 2x315KVA Transformer), Yard Lighting and Gaseous Chlorination system at Head Works Site at Bhaburia mouza under Gourbazar-Ichapur and Jamgara-jagannathpur Water Supply Scheme
Repair works of front portion of transformer room_ existing security room_ pathway on the east side of canteen building etc at Govt College of Engineering and Ceramic Technology_ 73_ Abinash Chandra Banerjee Lane_ Kol_10
Repairing , Servicing ,Relay Testing with allied works of 2 Panel HT VCB and overhauling, dehydration ,filtration with necessary testing of 750 KVA oil type transformer at Thanthania DPS under PBPS.(DR.)/S and D.
Repairing with replacement of burnt out spare parts of motor starter panel including Auto transformer and Busbar Panel of 400 amp OCB incomer side of pump unit no.8 at Ultadanga drainage pumping station.
Construction of road and drain including cover Slab from Zomato Kitchen centre to Transformer at Hatiara Metho para in Ward no -13 under Bidhannagar Municipal Corporation( Scheme - PARAY SAMADHAN, Phase VII, UID NO.- NOPPS070173 )
CONSTRUCTION OF CEMENT CONC. ROAD FROM THE TRANSFORMER MORE TO THE HOUSE OF JAGA MITTIR,AT SANSAD-III, AT MOUZA- KOWGACHI ,JL NO- 20 , UNDER KOWGACHI-I GRAM PANCHAYAT ,UNDER BARRACKPORE-I PANCHAYAT SAMITY
Construction of Cable trench, switchyard development, approach road, pathway, Fencing wall , Equipment foundation(VCB, CT and Transformer plinth), drainage system and allied work at Nilganj 33/11KV Sub-station under Barasat Division, 24Pgs(N)
Shifting and laying of 150mm dia and 100m dia D.I. water line due to construction of underground drain from WBSEB transformer to shib Mandir at Milanpally in ward No. 13 under Rajpur Sonarpur Municipality.
ENERGISATION BY INSTALLING TRANSFORMER AND OTHER ACCESSORIES FOR EFFECTING 3 PHASE STW SERVICE CONNECTION TO BE INSTALLED UNDER RIDF-XXIV IN THE DISTRICT OF COOCHBEHAR UNDER COOCHBEHAR AI DIVISION AT PANISALA WITHIN NEWTOWN CCC
Construction of foundations and allied civil works in respect of 3 numbers 132 KV bays and 3 numbers 33 KV bays including foundation of one 50 MVA Transformer at Dhulian 132/33 KV Substation
ENERGISATION BY INSTALLING TRANSFORMER AND OTHER ACCESSORIES FOR EFFECTING 3 PHASE STW SERVICE CONNECTION TO BE INSTALLED UNDER RIDF-XXIV IN THE DISTRICT OF COOCHBEHAR UNDER COOCHBEHAR AI DIVISION AT HARIBHANGA WITHIN NEWTOWN CCC
Annual Maintenance Contract in connection with Electrical repair and maintenance work of electrical installations such as switchgear, transformer, VCB,H.T. Relay, ACB,MCCB, L.T. Starter and control panel including allied works and Manual cleaning
ENERGISATION BY INSTALLING TRANSFORMER AND OTHER ACCESSORIES FOR EFFECTING 3 PHASE MDTW SERVICE CONNECTION TO BE INSTALLED UNDER RIDF-XXIV IN THE DISTRICT OF COOCHBEHAR UNDER COOCHBEHAR AI DIVISION AT CHARALJANI WITHIN TUFANGANJ CCC
Construction of multi-storied building at Tertiary Cancer Care Centre(TCC) at Burdwan Medical Collge and Hospital, Purba Bardhaman-SITC of 2x1000KVA, 11KV/415V Transformer capacity Sub-Station and down side Electrical installation work
AMC in connection with of Electrical repair and maintenance work of electrical installations such as switch gear, transformer, VCB,H.T. Relay ,ACB,MCCB, L.T. Starter and control panel including allied works and operation and
Construction of Road ( Cement Concrete ) from Joy Ghosh to Pukurkona Electric Transformer of Pukurkona Mouza at Rajibpur Bira G.P. under Habra-II Block, North 24 Parganas. Total length - 590.00 M. Average Width - 2.50 M.
Operation and maintenance of Intake Pumping Arrangement, (11/0.433KV sub-station , 800KVA transformer ) and other electro-mechanical accessories at Intake Point (Sultanpur ) of Southern Sector under Malda Arsenic Area Water Supply Scheme,(Phase-I
Repairing and Servicing of online central UPS (20 KVA) installed at Server room, Barrackpore Municipal main office including replacing of faulty parts i.e. Signal Transformer Board, Inverter Board, DSP Board, Bypass STS Board etc.
Urgent Repairing of faulty MEI make VLE type HT gear at WT-11 with repairing of Transformer and VLE type HT switch gear including High voltage Testing at SW-5 under BMC (2nd call) .
Through Repairing servicing 1 no HT OCB (11 KV) with replacement of defective components and dehydration and filtration 1 no Oil type Transformer (250 KVA, 11 KV/415 V) at Patuli Drainage Pumping Station.
CONTACTOR, MAIN, 550V, 300A, TIMER, RELAY, 550V AC, 0.5 MIN, EARTH LEAKAGE RELAY 50-750 MA WITH TIMER, CIRCUIT BRAKER, MCCB 200A, 440V, 4P, 3PHASE, EXPONY RESIN CUST CURRENT TRANSFORMER 20, HEX HEAD BOLT
Repairing and Overhauling of 11 KV 3 Panel(1 I/C and 2 O/G) LBS, 11KV/0.433KV, 315 KVA, indoor type transformer, LT PDB Panel at Tirat Headworks under Ratibati Water Supply Scheme.
Gravelling of Kalyaneshwari Sub-Station Switch Yard, PH- III (Transformer yard, 132 KV and 33 KV Yard) and Renovation of Gravelling Work of Switch Yard at Maithon Hydel Station under GOMD-II, DVC, Maithon
ENERGISATION BY INSTALLING TRANSFORMER AND OTHER ACCESSORIES FOR EFFECTING 3 PHASE STW SERVICE CONNECTION TO BE INSTALLED UNDER RIDF-XXIV IN THE DISTRICT OF COOCHBEHAR UNDER COOCHBEHAR AI DIVISION AT CHARALJANI WITHIN TUFANGANJ CCC