Loading…
Loading…
5,589 results • Best match
Servicing, overhauling and preventive maintenance of 2 Nos 1500 KVA Dry Type Transformers with allied electrical works at Joka DPS under GRBU.
Complete overhauling and servicing 2 nos of 500 KVA, 6 KV/ 415 V, oil filled transformers at Mominpore pumping station under BDPS
Annual maintenance contract of HT system including Transformers, VCBs, Main LT panels etc. in Shanagar Burning Ghat and Dhapa Human Crematorium (New)
Repairing of Panel and Transformer at PS-II, AA-IID under NTK Project.
Construction of CC Cover Drain Kamrabad rail gate Electric Transformer to Das para
Circuit Breaker, Rectifier Assy Complete, Transformer power Step Down, PTO Shaft Yoke, Relay
Construction of covered drain from Durlavpur transformer to Jagannathsen s house at Brindabanpur
Installation of Solar High Mast light at Sek Para near transformer at Hariharpur
Flow Pressure Tester for Lubricating Greases, Break Down Voltage Tester for Transformer oil
CONSTRUCTION OF PCC COVER DRAIN WITH SOAKPIT FROM TRANSFORMER MORE TO KAMRUL HOUSE
Contruction of raod protection wall from transformer to Shantiram Kora house at Khuditanr
Repairs/Maintenance of Transformer and Replacement of Vaccum Circuit Breaker at HMI Darjeeling
REPLACEMENT OF 250KVA, 6000/433 VOLT OIL IMMERSED TRANSFORMER AT WATGUNGE PUMPING STATION
Repairing of Village Road with Jhama- Bats from Malpara Transformer to Nager Danga
Potential Transformer, Numerical IDMT Relay, Bush Insulator, Outgoing Bushing, Epoxy Resin Cast CT
Routine, preventive and breakdown maintenance Excluding cost of major materials and transformer oil
Manufacture, testing, supply and delivery of Transformer and Feeder Control and Relay Panel.
Construction of road with PCC from Transformer to Bamun house at Banberia village
33 KV Outdoor Dead Tank Type Current Transformer with CTR 1000-800_400_1_1_1 A
Construction of PCC Road from Transformer to towards Ganesh Maji house at Ururi
Construction of pucca drain from house of Anarul to Transformer at Garabaria village.
Construction of Pucca Drain from Transformer to Mahadeb Koner house at Babuisol Village
CONSTRUCTION OF CC ROAD FROM BELEPUKUR PARH TO TRANSFORMER AT BABUIA MOUZA - BABUIA
UPS, SPD, Isolation Transformer, BMS, LAPTOP, MCCB, Power Cable, Copper earthing Cable, ITC
Energisation on Turnkey basis of new 63 KVA DTR With drawal of HTOH Line for new RLI connection at Nischintabasan JL No147 Plot No 2147 Block Tamluk under Birsingha CCC under RIDF XXIV Programme
Energisation on Turnkey basis of new 63 KVA DTR With drawal of HTOH Line LTOH Line for new RLI connection at Radhachak Plot No 77 Block Ghatal under Ghatal CCC under RIDF XXIV Programme
Energisation on Turnkey basis of new 63 KVA DTR With drawal of HTOH Line for new RLI connection at KhorigeriyaJL No Plot No78 Block Ghatal under Birsingha CCC under Core Sector 2017 18 Programme
Energisation on Turnkey basis of new 63 KVA DTR With drawal of HTOH Line LTOH Line for new RLI connection at Gokulnagar Block Daspur I under Daspur CCC under RIDF XXIV Programme Paschim Medinipur
Energisation on Turnkey basis of new 63 KVA DTR 857HT main 151 LT main for new RLI connection at Nischintapur Boulia Plot No 5953 Block Daspur II under Sonakhal CCC under RIDF-XXIV Programme
Supply loading at factory and transportation of LT DISTISTRIBUTION BOX and EYE HOOK for Anchor and Suspension Clamp and LT DISTISTRIBUTION BOX for 63 KVA DTR with Double Feeder to Garia Divisional store WBSEDCL
RTD Pt-100 Sensor S-02(three wire simplex) : - Range: Up to 150 deg, Class A Grade Accuracy, Bulb Di, Transformer Protection Realy for Oil Type Transformer: Model: TR-7551-C (upgraded from Model: TR-7557, Relay PECON Transformer Relay (Temperature Scanner), Md- TR-7570, Supply voltage- 90- 270 V AC/DC, R
Refer as per NIT
Const. of PCC Road
Supply Of Construction material at work site
PLEASE REFER TO TENDER DOCUMENTS
Online UPS Average Turn Over of Last 3 Years 25 Lakh (s) Experience with Gov. Required 1 Year (s) Online UPS ( 1 ) Technical Specifications Specification Specification Name Values Allowed Values GENERIC Rating in KVA (KVA) 3.0 KVA 3.0 KVA Technology ... isolation transformer MOSFET-PWM ... isolation transformer , ... isolation transformer , ... isolation transformer Input ...
Augmentation of Sub-Station with SITC of 1 No. New 1000KVA transformer by replacing old 500KVA transformer for load requirement of Mechanized Laundry at Mayo Hospital, 2nd campus of MCH during 2024-25.
Repairing, Servicing, of control desk circuit and LT-PDB cum MCC panel alongwith replacement of transformer cable and supply of transformer oil and dehydration at Bhadreswar Raw water pumping station at Bhadreswar Municipality.
REPLACEMENT OF 14 NOS 33 KV SF6 CUM AIS BAY WITH 33 KV DOUBLE BUS GIS PANEL ALONG WITH 2 NO NEW TRANSFORMER LV BAYS , 01 NO B/C BAY, 2 ETR , 1 SST , 2 PT BAY AT BAGNAN 132/33 KV GAS INSULATED SUBSTATION on turn-key basis
Const. Of 6 nos CC Road A)from gravel road to khoka mia house,B)from road side transformer to bholarvita anganwadi,C)from suresh barman house to sudhir barman house,D)from jyotish barman house to annada house E)from tapan pal house to nasib ali house
Construction of 1) 01 no. 31.5 MVA, 132/33 KV TransformerBay, 2) 04 nos. 33 KV Line Bay and 1 no. 33 KV Transfer Bay,and 3) 01 No 33 KV, 551 A Capacity Earthing Transformer Bayand allied work at Ujanu 132/33 KV Sub-Station underSiliguri Area Office
RMO sub station and electrical installation in CNH Building at Shibpur, Howrah (SH: Dehydration of Transformer 3 Nos. 800 KVA and 4 Nos. 6 KV HT OCB i/c overhauling & Servicing of HT OCB and LT ACB and 2 Nos. Capacitor Bank Panel and Calibration of IDMT Relay.)
Procurement of Supply of BDV Testing kit (True heat Transformer oil Break down Voltage Tester Digital Type), 0-100kV, fully motorized , 240V AC 50Hz Single phase ,Accuracy+/- 2%, Digital display with safety door and Zero start interlocking as per IS: 6792/1972. Accepted Make:- Nutronics Instruments & Engineering or similar.
Set of gasket for Transformer,One Set consisiting of [1]Item No.4=1 No .Item no.5=2 Nos.Item No.6=1 No.Item No.7=2 Nos.As per Drg.No.TACIA/25 [2]Item no.1=1 No .Item no.2=1 No.Item No.3=1 No. Item No.
Set of Metallic pipe for Main transformer consisting of A, B, B1, C, D, F, G, K, L, M, Pipes and Hardware As per sheet 5 and 8 of CLW Specn. no. CLW/ES/3/0253, Alt N [Qty-01 No for A, B, B1 C, D, F, G
Set of gasket for Transformer,One Set consisiting of [1]Item No.4=1 No .Item no.5=2 Nos.Item No.6=1 No.Item No.7=2 Nos.As per Drg.No.TACIA/25 [2]Item no.1=1 No .Item no.2=1 No.Item No.3=1 No. Item No.
AC Circuit Breaker 16A, 3 Pole (Type-14) (Pos. No. 62.1 "Oil Pump Transformer") with Aux. contacts 2 Nos. to CLW Spec. No. CLW/ES/3/0096, Alt-M or latest. (One Set comprises of 2 Nos. of AC Circuit Breakers along with 2 Nos. of Aux. contacts.)
Custom Bid for Services - Proposal for Loading Transportation Shifting placement erection commissioning of one no of BHEL make Station Transformer ST 90 MVA in place of existing 90MVA ST of Mejia TPS Unit 7 DVC Mejia and its associated works Similar Category Operation and Maintenance Power House/Power Plant
Work schedule for installation of 25 KVA DTR on 9mt DP struture wilth drawal of 185 mtr HTOH line and 374 mtr UG cable for PHE connection at Danipur under Nandakumar CCC under Tamluk Division
System improvement work by drawl of HT and LT line with installation of Shunt Trip Switchgear RMU DTR LT Kiosk FPB DB etc. at DC BLOCK of New Town CCC-I under New Town Division.