4,995 results • Best match
Transportation with loading of coal from Urdhan OCM of Pench Area Mine of M/s WCL to STPS, Sarni by Contractor in completely covered and sealed Tippers/Trucks and unloading the Coal in Coal Yard at MPPGCL, Sarni.
Transportation with loading of coal from Chinda OCM of Pench Area Mine of M/s WCL to STPS, Sarni by Contractor in completely covered and sealed Tippers/Trucks and unloading the Coal in Coal Yard at MPPGCL, Sarni.
Dust suppression by sprinkling water by the truck mounted mobile sprinkler arrangement at coal transportation road, CHP road, Burhar siding, No 3 stock yard and welcome gate Bagaiaiya Nallah to Burhar siding road weigh bridge and other places,
Dismantling, transportation and installation of Drive head of Main belt conveyor/ Pony belt conveyor and belt extension at 37LW/21D and 14R/22LE Panel in Seam No. I26 in UG at Umaria Colliery, Umaria Sub Area, Johilla Area
Loading of Coal into Tippers by Front End Pay Loader and its Transportation from coal stockyard of No. V of Barkuhi Opencast Mine through its weighbridge to coal stockyard of B.G. Siding via its weighbridge including mechanical unloading
Dust suppression by truck mounted Tanker on coal transportation public road from Mahdeiya Railway Level crossing No.16 in front of Block-B GM Office of PR Siding track level crossing at Block-B Project. (For 730 days).
Dismantling, Transportation and Installation of Drive Head of Belt Conveyor/ Pony Belt Conveyor and Belt Extension at 21DE/25LE and 12LE/1DE Panel in Seam No. IV in UG at Umaria Colliery, Umaria Sub Area of Johilla Area
Collection of Burnt oil at Dumper section, New workshop, Dumper section, Old Workshop and Dozer section (NWS and OWS) and transportation to Regional Store, Nigahi including Collection of material from Stores on day today basis at Nigahi Project
Transportation with loading of coal from Urdhan OCM of Pench Area Mine of M/s WCL to STPS, Sarni by Contractor in completely covered and sealed Tippers/Trucks and unloading the Coal in Coal Yard at MPPGCL, Sarni.
fallen and sticked pipe line from ordinary tube well and Cleaning of filled up including labor charges, transportation, loading, un loading, and again installation of hp after repairing work etc. Block Banda/Shahgarh Sub Division Banda District Saga
Dismantling, transportation, Installation and commissioning of 03 nos drive head 800mm (double drum with loop take up) and 03 nos pony belt with accessories i UG development panels in seam VIB at Rajendra UG Mine of Sohagpur Area
Transportation and installation of 1 Nos pony belt at 7Dip34L to 14 Dip34L with installation of 1 no discharge drum and tail end drum at panel P6 of LK II Seam at Bhadra 78 Mine Bhadra Sub Area
Making of 02 Nos foundation for installation of drive head with loop take up and loading, unloading, transportation, extension of for Total Length 2704 Mtr and dismantling of existing belt structure and PVC belt at Bartarai UG Mine.
Loading of Coal into Tippers by Front End Loader and its Transportation from coal stockyard of No V of Barkuhi Opencast Mine through its weighbridge to coal stockyard of B G Siding via its weighbridge including mechanical unloading
Transportation with loading of coal from Mahadevpuri UG and Vishnupuri II UG of M/s WCL to STPS, Sarni by Contractor in completely covered and sealed Tippers/Trucks and unloading the Coal in Coal Yard at MPPGCL, Sarni.
Fallen and sticked pipe line from ordinary tube well and Cleaning of filled up including labor charges, transportation, loading, un loading, and again installation of hp after repairing work etc. Block Banda/Shahgarh Sub Division Banda District Sagar
Mounting, demounting, fitting and maintenance of batteries with its transportation in 190T, 120T, 100T Dumper at New workshop and 85/100 Dumper at Old Workshop on day today basis for a period of 365 days at Nigahi Project.
Transportation with loading of coal from Mohan Quarry OC of Kanhan Area Mine of M/s WCL to STPS, Sarni by Contractor in completely covered and sealed Tippers and unloading the Coal in coal yard at MPPGCL, Sarni.
Dust suppression by sprinkling water by the truck mounted mobile sprinkler arrangement 12KL at Coal Transportation road, CHP road, Burhar siding, No.3 stock yard and Welcome gate Bagaiya Nallah, Burhar siding road, weigh bridge under Burhar sharda.
Distribution Transformer Capacity 1000 KVA With Off Load Tap Changer And Standard Accessories AS Per IS Standard Necessary Modification In LT Bus Duct And Installation Commissioning Load Trial And Including Transportation On Lum Sum Basis as per Esti
Transportation with loading of coal from Urdhan OCM of Pench Area Mine of M/s WCL to STPS, Sarni by Contractor in completely covered and sealed Tippers/Trucks and unloading the Coal in Coal Yard at MPPGCL, Sarni.
Loading, transportation, unloading and installation of 01 no. 55KW, 800mm belt conveyor complete with electrical accessories and 02 nos. of 22 KW, 800mm pony belt conveyors with electrical accessories at UG of Tawa-II Mine of Pathakhera Area.
Transportation with loading of coal from Sharda UG of Kanhan Area Mine of M/s WCL to STPS, Sarni by Contractor in completely covered and sealed Tippers/Trucks and unloading the Coal in Coal Yard at MPPGCL, Sarni.
Shifting of 11 KV Line and Irrigation DTR (100KVA) at Narmada River from Dub area to more than 141 meter level at vill- Karondiya Teh. Kukshi Dist. Dhar including material, labour, charges, transportation and testing etc. complete work.
Providing assistance for manual transportation, installation and tightening of heavy duty steel cogs in P-8B proposed depillaring panel, shift from site of withdrawal and installation at new site for erecting in working faces advance support, goaf ed
Transportation with loading of coal from Neharia UG of Pench Area Mine of M/s WCL to STPS, Sarni by Contractor in completely covered and sealed Tippers/Trucks and unloading the Coal in Coal Yard at MPPGCL, Sarni.
Premonsoon Repair and Maintenance of 125 KV Diesel Generator Set Engine Sl. No. 6H3533-09080 and 6H3533-09075 at Upper Beda Dam Site, Year 2021-22 Distt. Khargone including material, labour charges, transportation and testing etc. complete work
Loading, Transportation and unloading of new Dismantling and shortening of 800mm belt with drive head and structure complete with electricals from E9LHD depillaring panel to E8/main dip panel of Bagdona seam at Tawa Mine of Pathakhera Area.
Loading of Coal into Tippers by Pay Loader and its Transportation by Tippers from coal stockyard of Barkuhi Opencast Mine through its weighbridge to new crusher plant and coal stockyard of B.G. Siding via weighbridge including mechanical unloading
Inviting rates of JCB Tractor trolly tractor trolly rate including hard moorum with JCB excavating and transportation up to 2 km rates of poclain machine including concrete breaking and excavation for financial Year 2021 22 at Narayangarh Town
Transportation/ extension of conveyor belt structure and laying of 800mm PVC belting, installation of 04 nos. of (800 mm) size pony belts with drive head after dismantling,transporting, loading,unloading and staking of 800mm PVC belting and structure
Inviting rates of JCB Tractor trolly tractor trolly rate including hard moorum with JCB excavating and transportation up to 2 km rates of poclain machine including concrete breaking and excavation water tanker along with drinking water supply transpo
Supplying and Installation of Energy efficient 5 star 02 Nos Three Phase Pump set including Transportation Lowering Electric connection complete in all respect on WLD Tubewells at Solar Park Village Ladwan and Umariya Block Agar and Susner District
2x600 MW, SSTPP, Phase-I, Khandwa-Excavation, transportation and spreading of excavated spoil on the dry surface of ash of lagoon-I of the ash dyke to prevent air pollution at SSTPP, Phase-I, MPPGCL, Dongaliya Distt. Khandwa.
Transportation and unloading of materials like Roof bolts with nuts and bearing plates, Wstraps, resin capsules, Stemming Material, steel cog, Stone dust/cement/whitelime/sand bags and wooden prop from surface to all running panels of Bagdona Seam
Transportation with loading of coal from Urdhan OCM of Pench Area Mine of M/s WCL to STPS, Sarni by contractor in completely covered and sealed Tippers/ Trucks and unloading the coal in Coal Yard at MPPGCL, Sarni.
Transportation with loading of coal from Neharia UG Mine of Pench Area of M/s WCL to STPS, Sarni by Contractor in completely covered and sealed Tippers/Trucks and unloading the Coal in Coal Yard at MPPGCL, Sarni.
PROVIDING LABOUR ONLY FOR MAJOR/ MINOR REPAIRING WORK OF HANDPUMPS INCLUDING REPLACEMENT OF UNSERVICEABLE PARTS AS THE CASE MAY BE ALONG WITH OVERHAULING OF HANPUMP SET AND TRANSPORTATION ETC. AS PER APPROVED SPECIFICATION INCLUSIVE OF THE FREE SERV
Custom Bid for Services - Complete outsourcing the general maintenance repairing transportation work of GB Car Tub trolley of 13 point 5th level of Balaghat Mine for the period of Four Months Quantity 46800 MT As per tender documents
Custom Bid for Services - 200142206 One Year Job contract for Biomass sample collection from trucks sample preparation sample transportation and analysis of Moisture and size parameters at/NTPC Vindhyanagar Similar Category Operation and Maintenance Power House/Power Plant
Collection, Transportation and Safe Disposal of BioMedical Waste
Supply of Medical Nitrous Oxide Gas with Transportation
Hiring of Vehicle for Milk Transportation 5th call
Point to point transportation contract as per NIT
Collection, Lifting, Transportation, Unloading, Segregationof garbage; Dry Waste
Custom Bid for Services - Washing and ironing Double bed - bed sheet with pillow cover One double bed sheet of standard size and 2 no pillow cover count as one unit for payment Work is to be carried out to the satisfaction of SSE works C IND Rate ... Category Haulage & ... Services Haulage & ... Services Haulage & ... Services Haulage & ... Services Haulage & ... Services Haulage & ... Services Haulage & ...
Annual work contract for Daily cleaning of silo area and lower structure of silos of PHIPHIIPHIII along with loading transportation unloading of fly ash by tractor trolley from road between zero mile to NTH dump at SGTPS MPPGCL Brs
Transportation, Erection, Dismantling, etc. of ERS for modification/ shifting of EHV lines due to proposed 8 laning of Delhi-Vadodara section of NH-148N for express way between Mumbai to Delhi under Bharat Mala Project of NHAI under CCW
Work contract for segregation of stacking of stone / shale in trapezium for measurement at CHP 210 MW track hopper and after that transportation from track hopper area upto low lying area and also shifting of stone / shales .. .. .. ..ATPS CHACHAI.
fallen and sticked pipe line from ordinary tube well and Cleaning of filled up including labor charges, transportation, loading, un loading, and again installation of hp after repairing work etc. Block Deori/Kesli Sub Division Deori District Sagar M