Construction of CC Drain Opposite to Nagaraju complex and Laying of CC Road from Manjula House to Existing CC Road and Laying of CC Road from Sunil House to Existing Culvert and Laying of UGD Mohan reddy House to Exisiting Road and Fabrication, ... Fabrication, Transportation and ...
Repairing, reconditioning and replacements of spares for 132/6.6KV, 10/16 MVA Power Transformer, rewinding and reconditioning of 1000KW and 850KW, 6.6KV, HT motors at Peddapur 132 KV Sub-station and III and IV Pumping stations, including Dismantling, ... loading, Transportation , ...
DRILLING, EXCAVATION, LOADING, TRANSPORTATION, DUMPING, SPREADING & LEVELLING ETC., OF 339.462 LBCM OF IN-SITU OB (WHICH INCLUDES 1.752 LBCM TOP SOIL, 319.755 LBCM HARD OB AND 17.955 LBCM COAL) AND RE-HANDLING OF 5.830 LCM LOOSE OB WITH CONVENTIONAL EQUIPMENT AND ADDITIONAL WORKS VIZ., 1000 SHOVEL HOURS & 10,000 RMT DRILLING AT RAMAGUNDAM OPENCAST MINE- I, RG-III AREA DURING A PERIOD OF 30 MONTHS.
Rectification/Modification of OLTC tap position increasing to +/- 10% instead of +5%/-15% high voltage winding coils ratio/reconditioning of 220/6.9KV,25/31.5 MVA power transformer-1 & 2 at Bommakal 220/6.9KV substation including dismantling, ... workshop, transportation , ...
DRILLING, EXCAVATION, LOADING, TRANSPORTATION, DUMPING, SPREADING & LEVELLING, ETC., OF 602.58 LBCM OF IN-SITU OB (WHICH INCLUDES 4.08 LBCM of TOP SOIL, 569.92 LBCM OF HARD OB & 28.58 LBCM OF COAL) AND RE-HANDLING OF 15.28 LCM OF TOP SOIL WITH CONVENTIONAL EQUIPMENT AND ADDITIONAL WORKS VIZ., 3,000 RMT OF DRILLING AT RG OCP-III MINE (PHASE-II), RG-II AREA DURING A PERIOD OF 36 MONTHS.
DRILLING, EXCAVATION, LOADING, TRANSPORTATION, DUMPING, SPREADING & LEVELLING ETC., OF 722.176 LBCM OF IN-SITU OVERBURDEN (WHICH INCLUDES 3.982 LBCM OF TOP SOIL, 7.715 LBCM OF BC SOIL, 692.993 LBCM OF HARD OB & 17.486 LBCM OF COAL) WITH CONVENTIONAL EQUIPMENT AND ADDITIONAL WORKS VIZ., 1500 SHOVEL HOURS, 500 DOZER HOURS & 75,000 RMT DRILLING AT SRIRAMPUR OPENCAST - I&II INTEGRATED PROJECT, SRIRAMPUR AREA DURING A PERIOD OF 48 MONTHS.
DRILLING, EXCAVATION, LOADING, TRANSPORTATION, DUMPING, SPREADING & LEVELLING ETC., OF 652.97 LBCM OF IN-SITU OB (WHICH INCLUDES 642.11 LBCM HARD OB AND 10.86 LBCM COAL) AND RE-HANDLING OF 1.40 LCM LOOSE TOP SOIL WITH CONVENTIONAL EQUIPMENT AND ADDITIONAL WORKS VIZ., 2000 SHOVEL HOURS, 2000 DOZER HOURS & 10,000 RMT DRILLING AT RG OC-II EXTENSION PROJECT, RG-III AREA DURING A PERIOD OF 36 MONTHS.
DRILLING, EXCAVATION, LOADING, TRANSPORTATION, DUMPING, SPREADING & LEVELLING, ETC., OF 702.189 LBCM OF IN-SITU OB (WHICH INCLUDES 43.342 LBCM COAL) AND 3.306 LCM OF REHANDLING & SPREADING OF LOOSE TOPSOIL ON FINISHED EXTERNAL DUMPS WITH HIRED CONVENTIONAL EQUIPMENT AND ADDITIONAL WORKS, VIZ., 6,00,000 RMT OF DRILLING, 5,000 SHOVEL HOURS AND 5000 DOZER HOURS AT RAMAKRISHNAPUR OPENCAST PROJECT, MANDAMARRI AREA FOR A PERIOD OF 48 MONTHS.
Rectification/Modification of OLTC tap position increasing to +/- 10% instead of +5%/-15% high voltage winding coils ratio/reconditioning of 220/6.9KV,25/31.5 MVA power transformer-1 & 2 at Mallaram 220/6.9KV substation including dismantling, ... workshop, transportation , ...
DRILLING, EXCAVATION, LOADING, TRANSPORTATION, DUMPING, SPREADING & LEVELLING, ETC., OF 546.271 LBCM OF IN-SITU OB (WHICH INCLUDES 454.378 LBCM OF HARD OB & 91.893 LBCM OF COAL) AND EXCAVATION OF 16.902 LCM OF LOOSE OB /SAND WITH HIRED CONVENTIONAL EQUIPMENT AND ADDITIONAL WORKS VIZ., 1000 SHOVEL HOURS, 1000 DOZER HOURS & 68,000 RMT OF DRILLING AT VENKATESH KHANI COAL MINE, KOTHAGUDEM AREA DURING A PERIOD OF 48 MONTHS.
DRILLING, EXCAVATION, LOADING, TRANSPORTATION, DUMPING, SPREADING and LEVELLING, ETC., OF 673.56 LBCM OF IN-SITU OB (WHICH INCLUDES 5.60 LBCM OF TOP SOIL, 657.02 LBCM OF HARD OB and 10.94 LBCM OF COAL) WITH CONVENTIONAL EQUIPMENT, AND ADDITIONAL WORKS VIZ., 1500 SHOVEL HOURS, 1500 DOZER HOURS and 1,10,000 RMT OF DRILLING AT RG OC-II EXTENSION PROJECT, RG-III AREA DURING A PERIOD OF 36 MONTHS.
Monthly Basis Cab & Taxi Hiring Services - SUV; Hiring of Car Non AC SUV for Sr DSTE Co Ord SC and Sr DSTE SIG SC for a period two Years With cumulative 24000 kms per year; Outstation 24*7, Monthly Basis Cab & Taxi Hiring Services - Hatchback; Hiring ... 24*7, Goods Transport Service ... .., Goods Transport Service ...
Facility Management Services - LumpSum Based - ARCHAEOLOGICAL MONUMENT, ALAMPUR; SUPPLY, INSTALLA AND TRANSPORT OF SOLAR STREET LIGHTS; Consumables to be provided by service provider (inclusive in contract cost)
Transportation and Handling of 544 Nos of 6mm and 95 Nos of 8mm Steel Plates from Cochin Terminal (KeSO) to Vijayawada Terminal (TAPSO)
Wages to 105 Nos of Drivers and Transportation Labour of 4 Circles of Shamshabad Zone for the period July 2026 to March 2027
Supply and delivery of Desktop RAM to HMWSSB including transportation and transit risk upto destination etc., complete as directed by the HMWSSBs officials.
Supply, Transportation, Installation, Testing and Commissioning of 630 KVA Transformer for Raw Water Pump Cum Sump House at Alisagar in Nizamabad Municipal Coorporation
DRILLING, EXCAVATION, LOADING, TRANSPORTATION, DUMPING, SPREADING & LEVELLING ETC., OF 919.036 LBCM/LCM OF OB (856.826 LBCM OF HARD OB, 28.995 LBCM OF TOP SOIL FROM QUARRY AND EXTERNAL DUMP YARD & 20.202 LBCM OF COAL AND RE-HANDLING OF 13.013 LCM ... LOADING, TRANSPORTATION , ...
Estimate for Supply, transportation and replacement of failure Drivers for various LED light wattages in Amberpet Circle-42,Secunderabad zone, GHMC rS.10.60 LAKHS
Procurement Supply Delivery Testing and Commissioning of 14Seater Electric Sightseeing Vehicle with Lithium Ion Battery Technology for Institutional Transportation at NIMS Hyderabad Call 2
DRILLING, EXCAVATION, LOADING, TRANSPORTATION, DUMPING, SPREADING & LEVELLING, ETC., OF 612.786 LBCM IN-SITU OB (WHICH INCLUDES 582.692 LBCM OF HARD OB, 5.820 LBCM OF TOP SOIL & 24.274 LBCM OF COAL) AND 4.00 LCM RE-HANDLING OF LOOSE OB WITH CONVENTIONAL EQUIPMENT AND ADDITIONAL WORKS, VIZ., 1000 SHOVEL HOURS, 500 DOZER HOURS & 140,000 RMT OF DRILLING AT KTK OC-II PROJECT, BHUPALPALLY AREA FOR A PERIOD OF 36 MONTHS.
NSHES-O&M-Hiring of 1 No. Diesel Vehicle with a mileage of 2500Km/month and usage time of 24hrs/day for the official utilization of ADE/O&M/NSLCPH, 11KV TSGENCO feeder routine inspection, material transportation & emergency works during the generation period at NSLCPH for the year 2021-22 i.e from 01.04.2021 or actual date of engagement to 31.03.2022 and should have permission to travel throughout Telangana State
Supply of 50.00 lakh full grown pencil thick teak sumps of 15.00 cm (6") length (13 cm root and 2 cm shoot), six months old with minimum of 2.00 cm girth at collar portion, dressing of lateral root, cutting slant 2.00 cm above collar and root and ... and transportation to ...
Supply, delivery, Transportation and erection of various sizes of Driving end and Non-Driving End Bearings and rewindings of 2Nos for 6.6KV, 3000KW, BHEL Make motor with WPIL make Vertical pumpsets, Horizontal centrifugal pump sets with all accessories including cost and conveyance of all materials etc., complete at Mallaram, Bommakal and Murmur Pumping stations under Godavari Drinking Water Supply Scheme, Phase-I, of O&M Division-XXI, Control room, Sec' bad.
DRILLING, EXCAVATION, LOADING, TRANSPORTATION, DUMPING, SPREADING & LEVELLING ETC., OF 491.280 LBCM OF IN-SITU OB (WHICH INCLUDES 9.109 LBCM OF TOP SOIL, 465.654 LBCM OF HARD OB & 16.517 LBCM OF COAL) AND 4.538 LBCM OF OB FOR DIVERSION OF NALLAH WITH CONVENTIONAL EQUIPMENT AND ADDITIONAL WORKS VIZ., 1000 SHOVEL HOURS, 1000 DOZER HOURS & 1,50,000 RMT OF DRILLING AT SRP OC-II EXPANSION PROJECT, SRIRAMPUR AREA DURING A PERIOD OF 48 MONTHS.
Rectification Modification of OLTC tap position increasing to plus minus 10percent instead of plus5percent minus15percent high voltage winding coils ratio reconditioning of 220 6.9KV 25 31.5 MVA power transformer 1and 2 at Kondapaka 220 6.9KV ... workshop transportation unloading ...
DRILLING, EXCAVATION, LOADING, TRANSPORTATION, DUMPING, SPREADING & LEVELLING ETC., OF 725.775 LBCM OF IN-SITU OB (WHICH INCLUDES 1.727 LBCM TOP SOIL, 3.454 LBCM SUB SOIL, 683.807 LBCM HARD OB AND 40.241 LBCM COAL) AND RE-HANDLING OF 10.075 LCM LOOSE TOP SOIL WITH CONVENTIONAL EQUIPMENT AND ADDITIONAL WORKS VIZ., 2000 SHOVEL HOURS, 2000 DOZER HOURS & 3,00,000 RMT DRILLING AT MNG OCP, MNG AREA DURING A PERIOD OF 42 MONTHS.
Dismantling, loading, transportation, unloading at service centre, refurbishment for 2Nos and rewinding for 2Nos of 6.6KV, 3000KW BHEL Make motor and WPIL make, Horizontal centrifugal pump sets with suitable sizes of Driving end and Non-Driving End Bearings, with all accessories including cost and conveyance of all materials etc., complete at Mallaram Pumping station under Godavari Drinking Water Supply Scheme, Phase-I, of O&M Division-XXI, Control room, Sec' bad.
DRILLING, EXCAVATION, LOADING, TRANSPORTATION, DUMPING, SPREADING & LEVELLING, ETC., OF 597.130 LBCM OF IN-SITU OB (WHICH INCLUDES 2.230 LBCM OF TOP SOIL, 2.230 LBCM OF SUB SOIL, 571.250 LBCM OF HARD OB & 21.420 LBCM OF COAL) AND EXCAVATION OF 10.840 LCM OF LOOSE SILT WITH CONVENTIONAL EQUIPMENT AND ADDITIONAL WORKS VIZ., 1,57,032 RMT OF DRILLING AT RG OC-III EXPANSION PROJECT, RG-II AREA DURING A PERIOD OF 36 MONTHS.
Laying of CC Road from MRF Ramulu to Bandaiah to Laxmaiah to MEO Dashrath and md.Saleem House to Raheem Mulsob (H) to Srinivas Goud PT sir (H) and Fabrication, Transportation and Installation of Octagonal poles with Highmast LED Lights at old Graveyard opposite Ayyappa temple and Laying of CC Road at old Graveyard at NH-65 in ward No.22 in Sadsivpet Municipality (This work entrusted to STs only).
DRILLING, EXCAVATION, LOADING, TRANSPORTATION, DUMPING, SPREADING and LEVELLING, ETC., OF 450.565 LBCM OF IN-SITU OB (WHICH INCLUDES 2.535 LBCM OF TOP SOIL, 9.185 LBCM OF SUB SOIL, 413.790 LBCM OF HARD OB and 25.055 LBCM OF COAL) WITH CONVENTIONAL EQUIPMENT, AND ADDITIONAL WORKS VIZ., 3000 SHOVEL HOURS, 3000 DOZER HOURS and 2,20,000 RMT OF DRILLING AT SRP OC-II EXPANSION PROJECT, SRIRAMPUR AREA DURING A PERIOD OF 36 MONTHS.
Collection & Disposal Waste Management Service - Lifting, Transportation, Unloading, Ways of disposal; Liquid Waste, Ways of disposal; Dry Waste, Collection & Disposal Waste Management Service - Collection, Lifting
MASTER LINK FOR DEMOUNTABLE CRANE, 5 TON ELECTRIC HOIST, MANUAL CHAIN HOIST- 5 TON, CRANE TRANSPORTATION CONTAINER, SHORT RANGE DEMOUNTABLE MOBILE CRANE WITH 5 TON CAPACITY
Estimate for supply, Transportation and fixing of New LED fixtures with warranty upto 2 years for street light maintenance in Bowenpally circle-03, Malkajgiri Zone, MIMC
Engaging private water tankers on a hire basis for the transportation and supply of drinking water to various localities of Korutla Town under Municipal General Funds
Design, construction, transportation, installation, testing, commissioning, and delivery of a fully functional FRP Pedal boat-4 seater at Laknapur Cheruvu, Parigi, Vikarabad dist., Telangana State, India
Design, Manufacture, testing and inspection at manufacturers works, Packing, Forwarding and Transportation and delivery at site, Erection, testing and commissioning of 2No.s 13 passengers (884Kgs) and 2 No.s 8 passengers (554Kgs) Traction type lifts of Make: JOHNSON/OTIS/SCHINDLER/OMEGA/Any other Equivalent and reputed Make with V3F drive and Automatic Rescue Device (ARD) etc., including all spares, Dismantling and Buy back of old/existing Lifts available at SLBHES, Srisailam Dam west, Telangana.
Design development testing integration of application both server side and client side for tanker operations for the RFID enabled HH devices (procured by the department) as per business of HMWSSB with security audit and providing help desk to look ... duties, transportation , ...
DRILLING, EXCAVATION, LOADING, TRANSPORTATION, DUMPING, SPREADING & LEVELLING, ETC., OF 17.986 LBCM OF IN-SITU OB (WHICH INCLUDES 2.064 LBCM OF TOP SOIL, 6.192 LBCM OF SUB SOIL & 9.730 LBCM OF HARD OB) AND RE-HANDLING OF 6.829 LCM OF LOOSE BC SOIL, FOR 2ND DIVERSION OF VATTIVAAGU WITH HIRED CONVENTIONAL EQUIPMENT AS PER THE TERMS AND CONDITIONS INDICATED IN THIS NIT AT KHAIRAGURA OPENCAST PROJECT, BELLAMPALLI AREA DURING A PERIOD OF 6 MONTHS.
DRILLING, EXCAVATION, LOADING, TRANSPORTATION, DUMPING, SPREADING and LEVELLING ETC., OF 417.790 LBCM OF IN-SITU OB (WHICH INCLUDES 2.269 LBCM OF TOP SOIL, 9.083 LBCM OF SUB SOIL, 374.127 LBCM OF HARD OB and 32.311 LBCM OF COAL), AND EXCAVATION OF 0.894 LCM OF LOOSE SAND WITH CONVENTIONAL EQUIPMENT AND ADDITIONAL WORKS VIZ., 1000 SHOVEL HOURS, 18,000 RMT OF DRILLING AT VENKATESH KHANI COAL MINE, KOTHAGUDEM AREA DURING A PERIOD OF 36 MONTHS.
a)Providing renewal coat with DBM and BC to the existing road from OC-IV junction to main check post and coal transportation road from Ippala Singaram turning to sulabh complex near Gandhi nagar at Manuguru Area and b)Strengthening and providing of renewal coat to two wheeler road to OC-IV site office, triangular patch at PK OC-IV and internal road at Area workshop in Manuguru Area, Bhadradri Kothagudem District. T.S.
DRILLING, EXCAVATION, LOADING, TRANSPORTATION, DUMPING, SPREADING & LEVELLING ETC., OF 2363.508 LBCM OF OVERBURDEN ( I.E. 2250.503 LBCM OF INSITU OB, 10.754 LBCM OF TOP SOIL, 42.890 LBCM OF SUB SOIL & 59.361 LBCM OF COAL) WITH HIRED HEMM IN COMBINATION WITH CONVENTIONAL EQUIPMENT AND 37.678 LCM OF REHANDLING OF LOOSE OB WITH CONVENTIONAL EQUIPMENT AND ADDITIONAL WORKS NAMELY 7000 SHOVEL HOURS, 7000 DOZER HOURS AT KHAIRAGURA OPENCAST PROJECT, BPA AREA DURING A PERIOD OF 84 MONTHS.
DRILLING, EXCAVATION, LOADING, TRANSPORTATION, DUMPING, SPREADING & LEVELLING ETC., OF 425.25 LBCM OF IN-SITU OB (WHICH INCLUDES 3.58 LBCM OF TOP SOIL, 413.79 LBCM OF HARD OB & 7.88 LBCM OF COAL) AND EXCAVATION OF 3.00 LBCM OF TOP SOIL BENEATH EXTERNAL DUMP WITH CONVENTIONAL EQUIPMENT AND ADDITIONAL WORKS VIZ., 1000 SHOVEL HOURS, 1000 DOZER HOURS & 5,000 RMT OF DRILLING AT RG OC-II EXTENSION PROJECT, RG-III AREA DURING A PERIOD OF 24 MONTHS.
DRILLING, EXCAVATION, LOADING, TRANSPORTATION, DUMPING, SPREADING & LEVELLING, ETC., OF 573.798 LBCM OF IN-SITU OB (WHICH INCLUDES 1.179 LBCM OF TOP SOIL, 3.279 LBCM OF SUB SOIL, 526.304 LBCM OF HARD OB & 43.036 LBCM OF COAL) AND RE-HANDLING OF 11.385 LCM OF LOOSE OB WITH CONVENTIONAL EQUIPMENT AND ADDITIONAL WORKS VIZ., 2000 SHOVEL HOURS & 1,65,000 RMT OF DRILLING AT JVR OC-II MINE, KGM AREA DURING A PERIOD OF 36 MONTHS.
DRILLING, EXCAVATION, LOADING, TRANSPORTATION, DUMPING, SPREADING & LEVELLING ETC., OF 681.538 LBCM OF IN-SITU OB (WHICH INCLUDES 616.638 LBCM HARD OB, 2.375 LBCM TOP SOIL, 9.226 LBCM SUB SOIL & 53.299 LBCM COAL) AND RE-HANDLING OF 8.75 LCM LOOSE TOP SOIL WITH CONVENTIONAL EQUIPMENT AND ADDITIONAL WORKS VIZ., 17,765 RMT DRILLING ( i.e., 12,765 RMT IN OB & 5,000 RMT IN COAL) AT JVR OC-II MINE, KGM AREA DURING A PERIOD OF 48 MONTHS.
SUPPLY, ERECTION OF PRE-FABRICATED BUS BAR CONTROL LT PANEL BOX WITH ALL NECESSARY ELECTRICAL ACCESSORIES, SUPPLY, TRANSPORTATION AND ERECTION OF VARIOUS ELECTRICAL ACCESSORIES IN SCB AREA
Rail head clearing, Transportation and Handling of bagged products (fertilizers, gypsum or other materials) /ASC Handling in Andhra Pradesh andTelangana States for a period of 2 years
Estimate for supply, transportation and fixing of new LED fixtures with warranty up to 2 years for street light maintenance in Keasara Circle-01, Malkajgiri Zone, MMC.
Supply and delivery of desktops with three years onsite warranty including transportation and transit risk upto destination etc., complete as directed by HMWSSB Officials under GM(IT).
Supply and delivery of scanners with three years onsite warranty including transportation and transit risk upto destination etc., complete as directed by HMWSSB Officials under GM(IT)