Loading…
Loading…
1,460 results • Best match
Online UPS (V2) (Q2) MSE Exemption for Years Of Experience Yes | Complete Startup Exemption for Years Of Experience Yes | Complete Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6422380 Dated : 09-07-2025 Bid Document 1/24 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 7 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 85500 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 5 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : SECL BISHRAMPUR AREA Office of Area General Manager, SECL Bishrampur Area, Chhattisgarh, COAL INDIA LIMITED, South Eastern Coalfields Limited, Ministry of Coal (Secl Bishrampur Area) Splitting
Air Conditioner Experience with Gov. Required 2 Year (s) Air Conditioner ( 6 ) Technical Specifications Specification Specification Name Values Allowed Values CAPACITY/GENERIC Type of Air conditioner Window AC Window AC Technology of AC Non- Inverter ... Speed) Inverter (Variable ... Non- Inverter (Fixed ...
Air Conditioner Experience with Gov. Required 1 Year (s) Air Conditioner ( 5 ) Technical Specifications Specification Specification Name Values Allowed Values CAPACITY/GENERIC Type of Air conditioner High wall Split AC highwallsplitac Technology of ... Non- Inverter (Fixed ... Speed) Inverter (Variable ... Non- Inverter (Fixed ...
Supplying, Installation , Testing and Commissioning of 137 Nos 1.5TR, 5star Inverter type Split AC units for different BSNL Telephone Exchange Sites under OA Raipur.SH Wiring and other associated works Revised.
Inverter 2.5 KVA 110 volt DC to 230 volt AC for on board mounting in pantry cars as per RDSO specification No- RDSO/SPEC/ PE/TL- 0132- 2009, Rev-'0'.
Air Conditioner Air Conditioner ( 5 ) Technical Specifications Specification Specification Name Values Allowed Values CAPACITY/GENERIC Type of Air conditioner High wall Split AC highwallsplitac Technology of AC Non- Inverter (Fixed Speed) Inverter ... Non- Inverter (Fixed ...
NICKEL CADMIUM BATTERY BANKS 220 V, INSTALLATION & COMMISSIONING CHARGES OF NICAD BATTERY BANK 220 V, NICAD BATTERY DRY CELL TYPE 1.2 V
Supply & installation of of 2 Ton Inverter type split air conditioner. It shall be 5 Star rated, variable speed having copper coil eco friendly refrigerant and suitable for operation in 230Volts, 50
1KV UPS- Rating in KVA-1.0 , Inverter efficiency -60 % or better, Battery back-up time -15min or above , warranty -01year , Battery capacity -7AH, no of battery -02 Single phase 230 Volt -9%.
Supply, installation, testing and commissioning of ceiling mounted 4 way cassette type split air conditioner (Cooling only), capacity: 4.0 Tr(48000 Btu/hr), 415 V, 3 ph, 50 Hz, Technology: Inverter ty
Air Conditioner Experience with Gov. Required 1 Year (s) Air Conditioner ( 8 ) Technical Specifications Specification Specification Name Values Allowed Values CAPACITY/GENERIC Type of Air conditioner High wall Split AC highwallsplitac Technology of ... AC Inverter (Variable ... Speed) Inverter (Variable ... Non- Inverter (Fixed ...
Online UPS (>10 KVA) With Battery (Q2) MSE Exemption for Years Of Experience Yes | Complete Startup Exemption for Years Of Experience Yes | Complete Document required from seller Experience Criteria, Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2025/B/6788262 Dated : 14-10-2025 Bid Document 1/14, -- Number of days for which Bid would be auto -- extended 4 Number of Auto Extension count 1 Bid to RA enabled No ITC available to buyer Yes Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 7 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 1876210 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 37525 ePBG Detail Required No (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : Regional Director 2/14 Regional Institute 5, CMPDI, CMPDI Complex, Seepat Road, Bilaspur CG-495006 (Regional Institute 5, Cmpdi, Bilaspur)
Online UPS (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6388592 Dated : 24-07-2025 Bid Document 1/9 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 18900 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 26 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : PFA/SECR/BILASPUR HQ NEW GENERAL MANAGER SECR, Indian Railways, South East Central Railway, Ministry of Railways (Pfa/secr/bilaspur) Splitting 2/9
Online UPS (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6478753 Dated : 29-07-2025 Bid Document 1/9 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 17280 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 38 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : PFA/SECR/BILASPUR HQ NEW GENERAL MANAGER SECR, Indian Railways, South East Central Railway, Ministry of Railways (Pfa/secr/bilaspur) Splitting 2/9
Online UPS (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6494832 Dated : 29-07-2025 Bid Document 1/9 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 11035 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 14 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : PFA/SECR/BILASPUR HQ NEW GENERAL MANAGER SECR, Indian Railways, South East Central Railway, Ministry of Railways (Pfa/secr/bilaspur) Splitting 2/9
Air Conditioner Air Conditioner ( 2 ) Technical Specifications Specification Specification Name Values Allowed Values CAPACITY/GENERIC Type of Air conditioner High wall Split AC High wall Split AC Technology of AC Non- Inverter (Fixed Speed) Inverter ... Non- Inverter (Fixed ...
Supply, installation, testing, and commissioning of a 1.5 Ton Split AC, inverter type or latest technology, 5-star rated (as per BEEs star rating plan mandatory from 01.01.2018 with a minimum ISEER of
Supply of Inverter type 2 Ton High wall Split AC with Energy efficiency BEE Star rating : 3 or above & Coil material Copper of make: Hitachi, Lloyd, LG, or similar, GeM Description Accept.LLOYD Split
Supply, installation and commissioning of 2 Ton High Wall Split AC 5 Star rating,Inverter(Variable Speed) ,Capacity 02 Ton +- 10%, Coil Material : Copper,Minimum Length of Copper 8 Meter, BEE Star Ra
Inverter based 600 Amps. 3 phase DC welding machine including power saver, welding cable (20 meters) with electrode holder, earthing clamp with earth lead (20 meters) fast plug to model no. TORNODO 60
Voltas Cooling Only 1.8 Ton 3 Star (ISEER value from 3.8 to 4.39), Voltas Cooling Only 1.8 Ton 3 Star (ISEER value from 3.8 to 4.39) Inverter AC - Variable Speed Wall Mount Split AC
LLOYD Cooling Only 1.5 Ton 3 Star (ISEER value from 3.8 to 4.39), LLOYD Cooling Only 1.5 Ton 3 Star (ISEER value from 3.8 to 4.39) Inverter AC - Variable Speed Wall Mount Split AC
Daikin Cooling Only 1.5 Ton 3 Star (ISEER value from 3.8 to 4.39), Daikin Cooling Only 1.5 Ton 3 Star (ISEER value from 3.8 to 4.39) Inverter AC - Variable Speed Wall Mount Split AC
godrej Cooling & Heating 1.5 Ton 3 Star (ISEER value from 3.8 to 4.39), godrej Cooling & Heating 1.5 Ton 3 Star (ISEER value from 3.8 to 4.39) Inverter AC - Variable Speed Wall Mount Split AC
Voltas Cooling Only 1.5 Ton 3 Star (ISEER value from 3.8 to 4.39), Voltas Cooling Only 1.5 Ton 3 Star (ISEER value from 3.8 to 4.39) Inverter AC - Variable Speed Wall Mount Split AC
Carrier Cooling Only 1.5 Ton 3 Star (ISEER value from 3.8 to 4.39), Carrier Cooling Only 1.5 Ton 3 Star (ISEER value from 3.8 to 4.39) Inverter AC - Variable Speed Wall Mount Split AC
Voltas Cooling Only 1.5 Ton 3 Star (ISEER value from 3.8 to 4.39), Voltas Cooling Only 1.5 Ton 3 Star (ISEER value from 3.8 to 4.39) Inverter AC - Variable Speed Wall Mount Split AC
Voltas Cooling & Heating 1.8 Ton 3 Star (ISEER value from 3.8 to 4.39), Voltas Cooling & Heating 1.8 Ton 3 Star (ISEER value from 3.8 to 4.39) Inverter AC - Variable Speed Wall Mount Split AC
Voltas Cooling & Heating 2 Ton 3 Star (ISEER value from 3.8 to 4.39), Voltas Cooling & Heating 2 Ton 3 Star (ISEER value from 3.8 to 4.39) Inverter AC - Variable Speed Wall Mount Split AC
godrej Cooling & Heating 1.5 Ton 3 Star (ISEER value from 3.8 to 4.39), godrej Cooling & Heating 1.5 Ton 3 Star (ISEER value from 3.8 to 4.39) Inverter AC - Variable Speed Wall Mount Split AC
LLOYD Cooling & Heating 2 Ton 3 Star (ISEER value from 3.8 to 4.39), LLOYD Cooling & Heating 2 Ton 3 Star (ISEER value from 3.8 to 4.39) Inverter AC - Variable Speed Wall Mount Split AC
Voltas Cooling & Heating 1.5 Ton 3 Star (ISEER value from 3.8 to 4.39), Voltas Cooling & Heating 1.5 Ton 3 Star (ISEER value from 3.8 to 4.39) Inverter AC - Variable Speed Wall Mount Split AC
Voltas Cooling & Heating 1.5 Ton 3 Star (ISEER value from 3.8 to 4.39), Voltas Cooling & Heating 1.5 Ton 3 Star (ISEER value from 3.8 to 4.39) Inverter AC - Variable Speed Wall Mount Split AC
Daikin Cooling Only 1.8 Ton 3 Star (ISEER value from 3.8 to 4.39), Daikin Cooling Only 1.8 Ton 3 Star (ISEER value from 3.8 to 4.39) Inverter AC - Variable Speed Wall Mount Split AC
LLOYD Cooling Only 1.5 Ton 3 Star (ISEER value from 3.8 to 4.39), LLOYD Cooling Only 1.5 Ton 3 Star (ISEER value from 3.8 to 4.39) Inverter AC - Variable Speed Wall Mount Split AC
LLOYD Cooling & Heating 2 Ton 3 Star (ISEER value from 3.8 to 4.39), LLOYD Cooling & Heating 2 Ton 3 Star (ISEER value from 3.8 to 4.39) Inverter AC - Variable Speed Wall Mount Split AC
Voltas Cooling Only 1.5 Ton 3 Star (ISEER value from 3.8 to 4.39), Voltas Cooling Only 1.5 Ton 3 Star (ISEER value from 3.8 to 4.39) Inverter AC - Variable Speed Wall Mount Split AC
LLOYD Cooling Only 1.5 Ton 3 Star (ISEER value from 3.8 to 4.39), LLOYD Cooling Only 1.5 Ton 3 Star (ISEER value from 3.8 to 4.39) Inverter AC - Variable Speed Wall Mount Split AC
SAMSUNG Cooling Only 1.5 Ton 3 Star (ISEER value from 3.8 to 4.39), SAMSUNG Cooling Only 1.5 Ton 3 Star (ISEER value from 3.8 to 4.39) Inverter AC - Variable Speed Wall Mount Split AC
SAMSUNG Cooling Only 2 Ton 3 Star (ISEER value from 3.8 to 4.39), SAMSUNG Cooling Only 2 Ton 3 Star (ISEER value from 3.8 to 4.39) Inverter AC - Variable Speed Wall Mount Split AC
Voltas Cooling & Heating 1.5 Ton 3 Star (ISEER value from 3.8 to 4.39), Voltas Cooling & Heating 1.5 Ton 3 Star (ISEER value from 3.8 to 4.39) Inverter AC - Variable Speed Wall Mount Split AC
Voltas Cooling & Heating 1.5 Ton 3 Star (ISEER value from 3.8 to 4.39), Voltas Cooling & Heating 1.5 Ton 3 Star (ISEER value from 3.8 to 4.39) Inverter AC - Variable Speed Wall Mount Split AC
Voltas Cooling Only 1.5 Ton 3 Star (ISEER value from 3.8 to 4.39), Voltas Cooling Only 1.5 Ton 3 Star (ISEER value from 3.8 to 4.39) Inverter AC - Variable Speed Wall Mount Split AC
Online UPS (V2) (Q2) MSE Exemption for Years Of Experience Yes Startup Exemption for Years Of Experience Yes Document required from seller Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, ... category Online UPS (V2) ...
Layer 2 Access Switch, CAT 6 Cable for Indoor use, Online UPS Average Turnover (Last 3 Years) 2 Lakh (s) Experience with Government Required 3 Year (s)
Essential civil works for installation of Power Plant Battery Bank including allied works under Phase 9 Project in AUTO Exchange Building, Raipur SH Miscellaneous works
2200010949, " 30V DC/25A float cum boost, 2200011180, Battery Bank 200 AH, 30 V (15 Cells of 2, INSTALL, COMM. OF 30V DC BATTERY CHARGE
BLUE STAR Cooling & Heating 1.5 Ton 3 Star (ISEER value from 3.8 to, BLUE STAR Cooling & Heating 1.5 Ton 3 Star (ISEER value from 3.8 to 4.39) Inverter AC - Variable Speed Wall Mount Split AC
BLUE STAR Cooling & Heating 1.5 Ton 3 Star (ISEER value from 3.8 to, BLUE STAR Cooling & Heating 1.5 Ton 3 Star (ISEER value from 3.8 to 4.39) Inverter AC - Variable Speed Wall Mount Split AC
Single Phase Pure Sinewave 5.5 KVA Inverter Having BSB Base PWM Technology Using IGBT Input 96V,DC Output Voltage 220 Volts AC Plus Minus 10 Percent At 50 Hz Confirming IS : 13314/1992.Make Microtech