Loading…
Loading…
1,690 results • Best match
Providing and fitting of battery bank with charger 110volts circuit for two switches of 3point3KV 400amps VCB Andrew yule make switch and 11KV 800amps OCB switch GEC make controlling of fire area workshop substation to provide power supply for openin
Providing and fitting of Battery Bank for two switches of 11KV 800amps VCB switch make SCPL and 3point3KV 400amps VCB switch make Electrotechnica at 1K pit substation to provide power supply closing and indication for breaker in the absence of power
Custom Bid for Services - ARC for Generator Group along with different equipments of Motorized Actuator Battery Bank and Battery Charger Electrical Laboratory etc of 2X500 MW DVC KTPS Koderma for Two Years Similar Category Operation and Maintenance Power House/Power Plant
Operation and Maintenance Power House/Power Plant - Maintenance Contract non comprehensive of UPS system of Ash Handling Plant and DM Plant of CTPS Unit7n8 through OEM for two years
220V, 300AH, PLANTE Lead Acid Stationary Battery Bank, (1 SET consisting of 110 Nos. 2V, 300Ah cell), Installation & Commissioning of 220 V battery bank
220V, 300AH, PLANTE Lead Acid Stationary Battery Bank, (1 SET consisting of 110 Nos. 2V, 300Ah cell), Installation & Commissioning of 220 V battery bank
Online UPS Online UPS ( 30 ) Technical Specifications Specification Specification Name Values Allowed Values GENERIC Rating in KVA (KVA) 1.0 KVA 1.0 KVA Technology MOSFET-PWM with inbuilt isolation transformer MOSFET-PWM with inbuilt isolation transformer, IGBT- PWM with inbuilt isolation transformer, IGBT-PWM without inbuilt isolation transformer Input Power single phase 160V - 260V sinewave, 50Hz single phase 160V - 260V sinewave, 50Hz, Three phase 300 V - 450V sinewave, 50Hz Output power Single phase 230V +/-1% sinewave 50 Hz Single phase 230V +/-1% sinewave 50 Hz, 3 Phase 400V +/-1% with alternative user setable setting of 380V +/-1% 50 Hz Backup time (Minutes) 30 30 Minimum VAH (VAH) 1000 1000 Warranty for UPS (Years) 3 3 Movable trolly for Batteries Without With, Without, Without trollery but 1/4 with rack Warranty for battery 2 2 Degree of Protection IP21 IP21, IP20 Cabling 5 meters for input and out put Without With, Without Paralleling kit for synchronising Without With, Without Installation and Commissioning Yes - CONSTRUCTIONAL Minimum thickness of M.S.Sheet Enclosure duly painted (mm) 1.0 - Type of Battery SMF-VRLA conforming to JISC:8702(Pt.I, II&III) - FUNCTIONAL Maximum overshoot and Under shoot of output rated voltage 4 - Voltage Regulation from no load to full load (%) /= 3% - 20% Overload limit for minimum 10 minutes Yes - Overall Efficiency (%) >/=90% - Total Harmonic Distortion(THD) (%) Maximum 3% - 50% Overload limit for minimum 1 minutes Yes - PROTECTION Protection for under voltage at battery terminal at 10.5V per 12 V battery. Yes - Protection of Over voltage, Short Circuit & over load at UPS output terminal Yes - METERING AND INDICATIONS Digital Metering in UPS for AC Input Voltage, Output AC Volt age, Current, Frequency, Battery Voltage and Current Yes - Indicators for mains presence, Battery charging and discharging, Output Over Load, Low Battery Voltage Yes - REPORTS AND Damp Heat : in Yes - 2/4 CERTIFICATION accordance with IS:9000(part 5/sec.2)1981 at Temperature of 40 degree C, two cycles of (12+12) hours each 2007) Dry Heat Test : in accordance with IS:9000 (part 3/sec.5)1977 (reaffirmed 2007) at 55 degree C for 16 hrs Yes - Cold Test : in accordance with IS:9000 (Part 2/Sec.4)1977 (Reaffirmed 2007) at -10 degree C for 4 hrs. Yes - Availability of the Type Test Report from Central Govt. NABL/ILAC Accredited lab covering all technical requirements. Yes - Type Test Certificate No. R-41001028 - Type Test Certificate date 18.02.2016 - Name of Lab ASHOKA LAB - Address of Lab GF-1 GUJRAT PLAZA INDORE - As per Meity (Government of India) guidelines UPS shall have valid BIS CRS certifications as applicable Not applicable presently - * Bold specifications are the golden parameters. Consignees and Quantity S.No. Consignee Address Quantity Delivery Days 1 Manasha Kumar Naik 834010, MILITARY HOSPITAL NAMKUM 30 90
Supply of Inverter for Fuel Pump Motor to EMD Part No.40122943, Make-EMD/Paragon or Equivalent.
Custom Bid for Services - Annual Rate Contract for UPS system of CTPS Unit 7 n 8 Similar Category Repair and Overhauling Service Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) Repair, Maintenance and Installation of Plant Systems/Equipments
Job. 1 Supply and fixing of online UPS with battery and Constant voltage Transformer for Rajdhar Rail WBs. Job.2 Supply and fixing of 1.25 KVA SW power backup system along with 180AH Battery and trolley for Project Office under Ashok OCP. Job. 3 Rep
online ups, exise battery, luminous ups, luminous battery, luminous sw, stand
6 MM Electric Wire Copper (Q3), 0.75 MM Electric Wire Copper (Q3), 42 AH BATTERY (Q3), 65 AH BATTERY (Q3), 10KVA ONLINE UPS (Q3), 20 KVA ONLINE UPS (Q3)
Battery Cell, Installation and Commissioning of 220 V Battery Bank
Annual repair and maintenance of 16 nos. inverter and battery at various location at township under Rajrappa area
Inverter with sine wave output Bidder Turnover (Last 3 Years) 1 Lakh (s) Experience Criteria 1 Year (s)
The subject tender is for the job of “Replacement of cable of TLF, TWD HSD pumps & Supply of 3 kVA UPS at BPCL Tatanagar depot”. The cable work is for replacement of old cable with new ones due to damages to existing ones. The details of motors to which these cables are connected are as below: 1 TLF HSD; 3.5Cx70sqmm, motor is 37KW Kirloskar 2 TWD HSD; 3.5Cx50sqmm, motor is 15KW Crompton greaves The cable laying work will be done inside and outside the depot. The depot layout has been attached in the tender document. The TLF HSD pump/motor is located inside the TLF pump-house and TWD HSD pump/motor is in the TWD railway siding. The cable trench has to be dug from the depot to railway siding. Vendor may plan to visit site for arriving at rates
Video Conferencing Camera, Professional Large Format Display, Micro PC (MPC), Online UPS
Online UPS Online UPS ( 3 ) Technical Specifications * As per GeM Category Specification Specification Specification Name Values Allowed Values GENERIC Rating in KVA (KVA) 1.0 KVA * Technology IGBT-PWM with inbuilt isolation transformer MOSFET-PWM with inbuilt isolation transformer, IGBT- PWM with inbuilt isolation transformer, IGBT-PWM without inbuilt isolation transformer Input Power single phase 160V - 260V sinewave, 50Hz single phase 160V - 260V sinewave, 50Hz, Three phase 300 V - 450V sinewave, 50Hz Output power Single phase 230V +/-1% sinewave 50 Hz Single phase 230V +/-1% sinewave 50 Hz, 3 Phase 400V +/-1% with alternative user setable setting of 380V +/-1% 50 Hz Backup time (Minutes) 60 60 Minimum VAH (VAH) 1600 400-640000 1/4 Warranty for UPS (Years) 2 1, 2, 3, 4, 5 Movable trolly for Batteries Without With, Without, Without trollery but with rack Warranty for battery 1 1, 2 Degree of Protection IP21 IP21, IP20 Cabling 5 meters for input and out put With With, Without Paralleling kit for synchronising With With, Without Installation and Commissioning Yes * CONSTRUCTIONAL Minimum thickness of M.S.Sheet Enclosure duly painted (mm) 1.2 * Type of Battery SMF-VRLA conforming to JISC:8702(Pt.I, II&III) * FUNCTIONAL Maximum overshoot and Under shoot of output rated voltage 4 * Voltage Regulation from no load to full load (%) /= 3% * 20% Overload limit for minimum 10 minutes Yes * Overall Efficiency (%) >/=90% * Total Harmonic Distortion(THD) (%) Maximum 3% * 50% Overload limit for minimum 1 minutes Yes * PROTECTION Protection for under voltage at battery terminal at 10.5V per 12 V battery. Yes * Protection of Over voltage, Short Circuit & over load at UPS output terminal Yes * METERING AND INDICATIONS Digital Metering in UPS for AC Input Voltage, Output AC Volt age, Current, Frequency, Battery Voltage and Current Yes * Indicators for mains presence, Battery charging and Yes * 2/4 discharging, Output Over Load, Low Battery Voltage REPORTS AND CERTIFICATION Damp Heat : in accordance with IS:9000(part 5/sec.2)1981 at Temperature of 40 degree C, two cycles of (12+12) hours each 2007) Yes * Dry Heat Test : in accordance with IS:9000 (part 3/sec.5)1977 (reaffirmed 2007) at 55 degree C for 16 hrs Yes * Cold Test : in accordance with IS:9000 (Part 2/Sec.4)1977 (Reaffirmed 2007) at -10 degree C for 4 hrs. Yes * Availability of the Type Test Report from Central Govt. NABL/ILAC Accredited lab covering all technical requirements. Yes * Type Test Certificate No. 559 * Type Test Certificate date 25.04.2016 * Name of Lab NTS * Address of Lab Bangalore * As per Meity (Government of India) guidelines UPS shall have valid BIS CRS certifications as applicable Not applicable presently * * Bold specifications are the golden parameters. Consignees and Quantity S.No. Consignee Address Quantity Delivery Days 1 SANTOSH KUMAR 833102, South Eastern Railway, Chakradharpur, P.O. - Chakradharpur 3 15 3/4
Inverter with sine wave output Average Turn Over of Last 3 Years 12 Lakh (s) Experience with Gov. Required 3 Year (s) Inverter With Sine Wave Output ( 54 ) Technical Specifications Specification Specification Name Values Allowed Values GENERIC ... GENERIC Inverter Governing ... IS:13369, VRLA battery confirming ... - Inverter shall ... - Inverter Efficiency ... The inverters shall ... - Inverter shall ...
Supply, Installation, Testing & Commissioning 2 x 30 KVA Modular Uninterrupted Power Supply (UPS) system including allied work at Additional Office Premises of Reserve Bank of India, Ranchi Located at Zila Parishad Bhavan
DC Capacitor At Inverter/Battery, 4 700MFD/350V DC(76X120MM) PG6SR054 OR EQUIVALENT, Capacitor, Aluminum Electrolytic, Panel Mounted, Screw Lead, 4700 UF, 350 Vdc, Part Code: 0000000C50
Providing and fitting of Battery Bank for two switches of 3.3KV,400A VCB Prabhu make switch and 11KV,400A VCB switch A/Yule make controlling of 1500KVA transformer 11KV/3.3KV power supply of 6inch pump near river side at Muraidih S/S, AMP Colliery
Online UPS Online UPS ( 4 ) Technical Specifications * As per GeM Category Specification Specification Specification Name Values Allowed Values GENERIC Rating in KVA (KVA) 2.0 KVA * Technology IGBT-PWM without inbuilt isolation transformer MOSFET-PWM with inbuilt isolation transformer, IGBT- PWM with inbuilt isolation transformer, IGBT-PWM without inbuilt isolation transformer Input Power single phase 160V - 260V sinewave, 50Hz single phase 160V - 260V sinewave, 50Hz, Three phase 300 V - 450V sinewave, 50Hz Output power Single phase 230V +/-1% sinewave 50 Hz Single phase 230V +/-1% sinewave 50 Hz, 3 Phase 400V +/-1% with alternative user setable setting of 380V +/-1% 50 Hz Backup time (Minutes) 120 15, 30, 60, 90, 120, 180, 240 Minimum VAH (VAH) 6400 400-640000 1/4 Warranty for UPS (Years) 2 1, 2, 3, 4, 5 Movable trolly for Batteries Without With, Without, Without trollery but with rack Warranty for battery 1 1, 2 Degree of Protection IP21 IP21, IP20 Cabling 5 meters for input and out put With With, Without Paralleling kit for synchronising Without With, Without Installation and Commissioning Yes * CONSTRUCTIONAL Minimum thickness of M.S.Sheet Enclosure duly painted (mm) 1.2 * Type of Battery SMF-VRLA conforming to JISC:8702(Pt.I, II&III) * FUNCTIONAL Maximum overshoot and Under shoot of output rated voltage 4 * Voltage Regulation from no load to full load (%) /= 3% * 20% Overload limit for minimum 10 minutes Yes * Overall Efficiency (%) >/=90% * Total Harmonic Distortion(THD) (%) Maximum 3% * 50% Overload limit for minimum 1 minutes Yes * PROTECTION Protection for under voltage at battery terminal at 10.5V per 12 V battery. Yes * Protection of Over voltage, Short Circuit & over load at UPS output terminal Yes * METERING AND INDICATIONS Digital Metering in UPS for AC Input Voltage, Output AC Volt age, Current, Frequency, Battery Voltage and Current Yes * Indicators for mains presence, Battery charging and Yes * 2/4 discharging, Output Over Load, Low Battery Voltage REPORTS AND CERTIFICATION Damp Heat : in accordance with IS:9000(part 5/sec.2)1981 at Temperature of 40 degree C, two cycles of (12+12) hours each 2007) Yes * Dry Heat Test : in accordance with IS:9000 (part 3/sec.5)1977 (reaffirmed 2007) at 55 degree C for 16 hrs Yes * Cold Test : in accordance with IS:9000 (Part 2/Sec.4)1977 (Reaffirmed 2007) at -10 degree C for 4 hrs. Yes * Availability of the Type Test Report from Central Govt. NABL/ILAC Accredited lab covering all technical requirements. Yes * Type Test Certificate No. 4465 * Type Test Certificate date 27/02/2017 * Name of Lab MICROTEK INTERNATINAL PVT LTD * Address of Lab MICROTEK, ROHTAK ROAD, NEW DELHI * As per Meity (Government of India) guidelines UPS shall have valid BIS CRS certifications as applicable Yes * * Bold specifications are the golden parameters. Consignees and Quantity S.No. Consignee Address Quantity Delivery Days 1 Jay Prakash Rai 826001, Office of the Sr. Divisional Electrical Engineer, DRM Office, East 4 15 3/4 Central Railway, Dhanbad
Providing and installation of Inverter with Battery at P.O Office for back up power supply under CHP-CPP, PPR.
Repairing of RPI M30 solar inverter Delta make installed at Alaknanda Building(30KW/KWH) under CCL Darbhanga House, Ranchi.
Capacitor, Aluminum Electrolytic, Panel Mounted, Screw Lead, 2200 uF, 450 Vdc, Capacitor, Metallized Polypropylene Film, 0.68 uF, 1250 Vdc, Capacitor, Aluminum Electrolytic, Panel Mounted, Screw Lead, 4700 uF, 350 Vdc, Capacitor, Metallized ... for UPS system , ... - Inverter Control ... - Inverter Gate ...
Repair cum maintenance of Desktop Computers and Inverters in operation at all the eight nos. of Road Weighbridges, one no. of Rail In Motion Weighbridge and for D.M.O. Challan generation at the Weighbridges w.r.t. Karo OCP, under BnK Area
Annual Maintenance Service - Desktops, Laptops and Peripherals - 160 kVA UPS; Schneider
Comprehensive Annual Maintenance Contract of Inverter Air Conditioners Split type for Gandhi Nagar Hospital Ranchi for period of 365 Days
Online UPS Online UPS ( 2 ) Technical Specifications Specification Specification Name Values Allowed Values GENERIC Rating in KVA (KVA) 5.0 KVA 5.0 KVA Technology IGBT-PWM without inbuilt isolation transformer IGBT-PWM without inbuilt isolation transformer Input Power single phase 160V - 260V sinewave, 50Hz single phase 160V - 260V sinewave, 50Hz Output power Single phase 230V +/-1% sinewave 50 Hz Single phase 230V +/-1% sinewave 50 Hz, 3 Phase 400V +/-1% with alternative user setable setting of 380V +/-1% 50 Hz Backup time (Minutes) 60 60 Minimum VAH (VAH) 4992 4992 Warranty for UPS (Years) 2 1, 2, 3, 4, 5 Movable trolly for Batteries Without Without Warranty for battery 1 1, 2 Degree of Protection IP21 IP21, IP20 Cabling 5 meters for input and out put Without With, Without 1/4 Paralleling kit for synchronising With With, Without Installation and Commissioning Yes - CONSTRUCTIONAL Minimum thickness of M.S.Sheet Enclosure duly painted (mm) 1.2 - Type of Battery SMF-VRLA conforming to JISC:8702(Pt.I, II&III) - FUNCTIONAL Maximum overshoot and Under shoot of output rated voltage 4 - Voltage Regulation from no load to full load (%) /= 3% - 20% Overload limit for minimum 10 minutes Yes - Overall Efficiency (%) >/=90% - Total Harmonic Distortion(THD) (%) Maximum 3% - 50% Overload limit for minimum 1 minutes Yes - PROTECTION Protection for under voltage at battery terminal at 10.5V per 12 V battery. Yes - Protection of Over voltage, Short Circuit & over load at UPS output terminal Yes - METERING AND INDICATIONS Digital Metering in UPS for AC Input Voltage, Output AC Volt age, Current, Frequency, Battery Voltage and Current Yes - Indicators for mains presence, Battery charging and discharging, Output Over Load, Low Battery Voltage Yes - REPORTS AND CERTIFICATION Damp Heat : in accordance with IS:9000(part 5/sec.2)1981 at Temperature of 40 degree C, two cycles of (12+12) hours each 2007) Yes - 2/4 Dry Heat Test : in accordance with IS:9000 (part 3/sec.5)1977 (reaffirmed 2007) at 55 degree C for 16 hrs Yes - Cold Test : in accordance with IS:9000 (Part 2/Sec.4)1977 (Reaffirmed 2007) at -10 degree C for 4 hrs. Yes - Availability of the Type Test Report from Central Govt. NABL/ILAC Accredited lab covering all technical requirements. Yes - Type Test Certificate No. NTS/PPTL/UPS-309/04 - Type Test Certificate date 9.10.2015 - Name of Lab NISAKI TECHNOLOGY SERVICES - Address of Lab BANGALORE - As per Meity (Government of India) guidelines UPS shall have valid BIS CRS certifications as applicable Yes - * Bold specifications are the golden parameters. Consignees and Quantity S.No. Consignee Address Quantity Delivery Days 1 Ajay Kumar 826001, O/o- Senior Section Engineer (Telecom), Near DRM Banglow, Dhanbad, P.O. - Dhanbad (Jharkhand) 2 15
Multimedia Projector (MMP) (Q2), Workstation (Q2), Online UPS (V2) (Q2), Multifunction Machines MFM (Q2)
Desktop Computers (Q2), Online UPS (V2) (Q2), Computer Printers (Q2), Multifunction Machines MFM (Q2)
Video Conferencing End Point (Q2), Professional Large Format Display (Q2), Online UPS (V2) (Q2)
Custom Bid for Services - Maintenance Contract noncomprehensive of UPS system of 2 X 12 KVA of Ash Handling Plant 2 X 75 KVA of DM Plant of CTPS Unit78 through Ms Vertiv Energy Pvt Ltd
SITC of Solar DC Distribution Box 10 in 10 out, SITC of Solar DC Distribution Box 06 in 06 out, SITC of 60KW Output 3 Phase transformerless Grid Tied Solar Power Conditioning Unit, SITC of 50KW Output 3 Phase transformerless Grid Tied Solar Power Conditioning Unit, Supply of Cross linked Halogen Free and Flame Retardant Insulated Flexible Single Core 4 sq.mm, Supply of Weatherproof min IP 67 rated MC4 connector Male and Female suitable for 4sq.mm cable, Providing and laying in position cement concrete
Lead Acid Batteries for Motor Vehicles with Light Weight and High Cranking Performance as per IS 14257:2019 (Q3) MSE Exemption for Years Of Experience Yes Startup Exemption for Years Of Experience Yes Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination ITC available to buyer Yes Type of Bid Two Packet Bid Bid Number ( ) : GEM/2024/B/5728034 Dated : 23-12-2024 Bid Document 1/9 Time allowed for Technical Clarifications during technical evaluation 7 Days Inspection Required (By Empanelled Inspection Authority/Agencies pre- registered with GeM) No Estimated Bid Value 3787080 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 75700 ePBG Detail Advisory Bank State Bank of India ePBG Percentage(%) (%) 5.00 Duration of ePBG required (Months) ( ) . 6 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b). EMD & Performance security should be in favour of Beneficiary, wherever it is applicable., Beneficiary : GM(MM-Pur.)/HOD Central Coalfields Limited Ranchi Jharkhand, COAL INDIA LIMITED, Central Coalfields Limited, Ministry of Coal (Shri Raj Kishore) MII Purchase Preference MII Purchase Preference Yes 2/9 MSE Purchase Preference MSE Purchase Preference Yes 1. If the bidder is a Micro or Small Enterprise as per latest definitions under MSME rules, the bidder shall be exempted from the requirement of "Bidder Turnover" criteria and "Experience Criteria" subject to meeting of quality and technical specifications. If the bidder is OEM of the offered products, it would be exempted from the "
Lead Acid Batteries for Motor Vehicles with Light Weight and High Cranking Performance as per IS 14257:2019 (Q3) MSE Exemption for Years Of Experience Yes Startup Exemption for Years Of Experience Yes Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination ITC available to buyer Yes Type of Bid Two Packet Bid Bid Number ( ) : GEM/2025/B/6076364 Dated : 27-03-2025 Bid Document 1/9 Time allowed for Technical Clarifications during technical evaluation 7 Days Inspection Required (By Empanelled Inspection Authority/Agencies pre- registered with GeM) No Estimated Bid Value 8774200 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 175500 ePBG Detail Advisory Bank State Bank of India ePBG Percentage(%) (%) 5.00 Duration of ePBG required (Months) ( ) . 12 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b). EMD & Performance security should be in favour of Beneficiary, wherever it is applicable., Beneficiary : GM(MM-Pur.)/HOD Central Coalfields Limited Ranchi Jharkhand, COAL INDIA LIMITED, Central Coalfields Limited, Ministry of Coal (Shri Raj Kishore) MII Purchase Preference MII Purchase Preference Yes 2/9 MSE Purchase Preference MSE Purchase Preference Yes 1. If the bidder is a Micro or Small Enterprise as per latest definitions under MSME rules, the bidder shall be exempted from the requirement of "Bidder Turnover" criteria and "Experience Criteria" subject to meeting of quality and technical specifications. If the bidder is OEM of the offered products, it would be exempted from the "
Supply and Installation of Solar Inverter, Supply and Opretional Training of AIO Desktop PC, Supply Calibraiton of Offline UPS, Supply and Opretional Training of AIO Laser Printer, Supply and Opretional Training of Multi Functional Printer, Supply and Installation of Ceiling Fan, Supply and Installation High Speed Wall Fan, Fabricration of Steel Almirah, Fabrication of Book Self, Supply and Handling of Air Conditioner, Supply and Calibration of Stabilizer for AC BOQ Title Supply and Service Tender BOQ
Online UPS Online UPS ( 80 ) Technical Specifications * As per GeM Catalogue. Specification Specification Name Values Allowed Values GENERIC Rating in KVA (KVA) 1.0 KVA 1.0 KVA Technology MOSFET-PWM with inbuilt isolation transformer MOSFET-PWM with inbuilt isolation transformer Input Power single phase 160V - 260V sinewave, 50Hz single phase 160V - 260V sinewave, 50Hz Output power Single phase 230V +/-1% sinewave 50 Hz Single phase 230V +/-1% sinewave 50 Hz Backup time (Minutes) 15 15 Minimum VAH (VAH) 1000 1000 Warranty for UPS (Years) 1 1, 2, 3, 4, 5 Movable trolly for Batteries With With Warranty for battery 1 1, 2 Degree of Protection IP21 IP21, IP20 Cabling 5 meters for input and out put With With, Without 1/4 Paralleling kit for synchronising With With, Without Installation and Commissioning Yes * CONSTRUCTIONAL Minimum thickness of M.S.Sheet Enclosure duly painted (mm) 1.2 * Type of Battery SMF-VRLA conforming to JISC:8702(Pt.I, II&III) * FUNCTIONAL Maximum overshoot and Under shoot of output rated voltage 4 * Voltage Regulation from no load to full load (%) /= 3% * 20% Overload limit for minimum 10 minutes Yes * Overall Efficiency (%) >/=90% * Total Harmonic Distortion(THD) (%) Maximum 3% * 50% Overload limit for minimum 1 minutes Yes * PROTECTION Protection for under voltage at battery terminal at 10.5V per 12 V battery. Yes * Protection of Over voltage, Short Circuit & over load at UPS output terminal Yes * METERING AND INDICATIONS Digital Metering in UPS for AC Input Voltage, Output AC Volt age, Current, Frequency, Battery Voltage and Current Yes * Indicators for mains presence, Battery charging and discharging, Output Over Load, Low Battery Voltage Yes * REPORTS AND CERTIFICATION Damp Heat : in accordance with IS:9000(part 5/sec.2)1981 at Temperature of 40 degree C, two cycles of (12+12) hours each 2007) Yes * 2/4 Dry Heat Test : in accordance with IS:9000 (part 3/sec.5)1977 (reaffirmed 2007) at 55 degree C for 16 hrs Yes * Cold Test : in accordance with IS:9000 (Part 2/Sec.4)1977 (Reaffirmed 2007) at -10 degree C for 4 hrs. Yes * Availability of the Type Test Report from Central Govt. NABL/ILAC Accredited lab covering all technical requirements. Yes * Type Test Certificate No. Kolkata, west bengal * Type Test Certificate date 01042018 * Name of Lab ERTL * Address of Lab OKHLA * As per Meity (Government of India) guidelines UPS shall have valid BIS CRS certifications as applicable Yes * * Bold specifications are the golden parameters. Consignees and Quantity S.No. Consignee Address Quantity Delivery Days 1 Ajay Kumar 826001, O/o- Senior Section Engineer (Telecom), Near DRM Banglow, Dhanbad, P.O. - Dhanbad (Jharkhand) 80 15
X-RAY BAGGAGE INSPECTION SYSTEM AS PER MHA QRs (Q3), Online UPS (Version 2.0) (Q2)
Lead Acid Batteries for Motor Vehicles with Light Weight and High Cranking Performance as per IS 14257:2019 (Q3) MSE Exemption for Years Of Experience Yes | Complete Startup Exemption for Years Of Experience Yes | Complete Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6606284 Dated : 15-09-2025 Bid Document 1/9 Number of Auto Extension count 1 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination ITC available to buyer Yes Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 7 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 3614079 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 72000 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 5 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. 2/9 Beneficiary : GM(MM-Pur.)/HOD Central Coalfields Limited Ranchi Jharkhand, COAL INDIA LIMITED, Central Coalfields Limited, Ministry of Coal (Shri Raj Kishore) Splitting
The additional wiring at EDP section for inverter UPS to obtain uninterrupted power for Coal Net and Video Conferencing at GM Office
Installation of 2 Nos 12 M High mast light including stabilizer, inverter, battery, cable, switches and other equipment under Burhai campus, Nawada
Inverter with sine wave output Average Turn Over of Last 3 Years 10 Lakh (s) Experience with Gov. Required 3 Year (s)
403/Supply of Battery Charging Unit
Arrangement of alternate power supply at Diesel Dispensing Unit by providing 01No 200Ah, 12V battery with inverter of Topa Project under Kuju Area.
SITC of 25KWP Roof Top Grid Connected Solar Power Plant at HPO building, Doranda, Ranchi SH Replacement of faulty on grid solar inverter
Lead Acid Batteries for Motor Vehicles with Light Weight and High Cranking Performance as per IS 14257:2019 (Q3) MSE Exemption for Years Of Experience and Turnover Yes Startup Exemption for Years Of Experience and Turnover Yes Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination ITC available to buyer Yes Bid Number ( ) : GEM/2025/B/6090978 Dated : 25-04-2025 Bid Document 1/13 Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 7 Days Inspection Required (By Empanelled Inspection Authority/Agencies pre- registered with GeM) No Estimated Bid Value 1963356 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 39300 ePBG Detail Advisory Bank State Bank of India ePBG Percentage(%) (%) 5.00 Duration of ePBG required (Months) ( ) . 5 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b). EMD & Performance security should be in favour of Beneficiary, wherever it is applicable., Beneficiary : Public sector unit BCCL Dhanbad Jharkhand, COAL INDIA LIMITED, Bharat Coking Coal Limited, Ministry of Coal, Dhanbad 826005 (Bharat Coking Coal Ltd.) MII Purchase Preference 2/13 MII Purchase Preference Yes MSE Purchase Preference MSE Purchase Preference Yes 1. If the bidder is a Micro or Small Enterprise as per latest definitions under MSME rules, the bidder shall be exempted from the requirement of "Bidder Turnover" criteria and "Experience Criteria" subject to meeting of quality and technical specifications. If the bidder is OEM of the offered products, it would be exempted from the "
MAIN POWER CABLE 3CORE, 1SQMM FOR 1 KVA UPS WITH 15 FT LENGTH (Q3)
Lead Acid Batteries for Motor Vehicles with Light Weight and High Cranking Performance as per IS 14257:2019 (Q3) MSE Exemption for Years Of Experience and Turnover Yes Startup Exemption for Years Of Experience and Turnover Yes Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination ITC available to buyer Yes Type of Bid Two Packet Bid Bid Number ( ) : GEM/2024/B/5482777 Dated : 24-10-2024 Bid Document 1/13 Time allowed for Technical Clarifications during technical evaluation 7 Days Inspection Required (By Empanelled Inspection Authority/Agencies pre- registered with GeM) No Estimated Bid Value 1702924 Payment Timelines Payments shall be made to the Seller within 21 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 34100 ePBG Detail Advisory Bank State Bank of India ePBG Percentage(%) (%) 5.00 Duration of ePBG required (Months) ( ) . 8 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b). EMD & Performance security should be in favour of Beneficiary, wherever it is applicable., Beneficiary : Public sector unit BCCL Dhanbad Jharkhand, COAL INDIA LIMITED, Bharat Coking Coal Limited, Ministry of Coal, Dhanbad 826005 (Bharat Coking Coal Ltd.) 2/13 MII Purchase Preference MII Purchase Preference Yes MSE Purchase Preference MSE Purchase Preference Yes 1. If the bidder is a Micro or Small Enterprise as per latest definitions under MSME rules, the bidder shall be exempted from the requirement of "Bidder Turnover" criteria and "Experience Criteria" subject to meeting of quality and technical specifications. If the bidder is OEM of the offered products, it would be exempted from the "