Loading…
Loading…
3,792 results • Best match
1.5 Ton AC ,5 Star BEE RATING INVERTER TYPE AC , HIGH WALL SPLIT AC, ECO FRIENDLY REFRIGERANT R32 WITH REMOTE, OUTDOOR UNIT MOUNTING STAND WITH COPPER COILS AND MINIMUM 3 METER/AS PER REQUIREMENT LENG
Installation and Commissioning of Stand-By Inverter as per Drawing No.EE/DRG/SI/005 along with Installation Kit for AC 3-Phase Fuel Pump Motor to EMD Part No. 40122943.Make: Elixir or similar Detaile
400 Amps IGBT Inverter based Manual Metal Arc Welding Machine to model No: TORNADO 401 of Ador Fontech or Equivalent Models of FRONIOUS or ESAB or ADOR only(Full description at Annexure-A).Note: OEM
SOLAR INVERTER OFF GRID 1100 VA PURE SINE WAVE SINGLE PHASE WITH LED DISPLAY AND CONFORMNIG TO IEC 600688-2 (1,2,14,30) OR EQUIVALENT BIS STANDARD TESTED FROM NABL ACCREDITED LAB AND WARRANTY OF 24 MO
godrej Cooling Only 1.5 Ton 5 Star (ISEER value from >=5 to <=5.5) Inverter AC - Variable Speed Wall Mount Split AC Brand: godrej (Detailed Description/Specification as per Product # 1 of GeM Co
LLOYD Cooling Only 2 Ton 5 Star (ISEER value from >=5 to <=5.5) Inverter AC - Variable Speed Wall Mount Split AC Brand: LLOYD (Detailed Description/Specification as per Product # 1 of GeM Contra
godrej Cooling Only 1.5 Ton 5 Star (ISEER value from >=5 to <=5.5) Inverter AC - Variable Speed Wall Mount Split AC Brand: godrej (Detailed Description/Specification as per Product # 1 of GeM Co
Online UPS (?10 KVA) With Battery Conforming To IS 16242 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Past Performance, OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2026/B/7070830 Dated : 05-01-2026 Bid Document 1/6 Number of Auto Extension count 1 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Online UPS (?10 KVA) Without Battery Conforming To IS 16242 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6991625 Dated : 11-12-2025 Bid Document 1/6 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Online UPS (?10 KVA) With Battery Conforming To IS 16242 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Past Performance, OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2026/B/7095937 Dated : 12-01-2026 Bid Document 1/7 Number of Auto Extension count 1 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Outdoor Cat 6 Cable, Desktop Computer, Online UPS 1 KVA, Managed switch 16 port TPlink, 10 Panels with all accessories, 4 U Rack for Switchs, Installtion and config
Multimedia Projector (MMP) (Q2), Multifunction Machine MFM (V2) (Q2), All in One PC (V2) (Q2), Online UPS (V2) (Q2), Entry and Mid Level Laptop - Notebook (Q2) (3 (3 ))
workstation, All in one Desktop Pc, 6.0 KVA Online UPS, Colour Laser Printer (A4 size), Mono Colour (Black) Laser Printer (A4 size), Multifunction Printer with A3 Paper support
High End Desktop Computer (Q2), Computer Printer (V2) (Q2), Multimedia Projector (MMP) (Q2), Online UPS (?10 KVA) With Battery Conforming To IS 16242 (Part 1) (Q2) (3 (3 ))
Multifunction Printer (Print, Scan, Copy) (Q2), Online UPS (? 10 KVA) With Battery Conforming To IS 16242 (Part 1) (Q2), Entry and Mid Level Desktop Computer (Q2) (3 (3 ))
Low Maintenance Stationary Lead Acid Battery sets along with all accessories for installation in the control room at unattended TSS consisting of Set of 55 cells of 2 Volt, 200AH conforming to RDSO Spec. RDSO/PE/SPEC/TL/0040 (Rev.2) 2021. Lead Acid (Tubular positive and pasted negative plates) stationary Batteries 110V 200Ah (comprising 55 cells of 2V each) capacity at 10Hrs. rate of discharge assembled in PPCP Container with intercell connectors, inter row connectors, inter tier connectors, stainless steel fasteners, micro porous vent plug, electrolyte level indicators, and porcelain cells insulators in dry and uncharged condition and Electrolyte, User manual, Routine and Acceptance test reports as per RDSO spec. to be supplied along with battery test. Maintenance Accessories and Electrolyte
Supply Installation testing and commissioning of Inverter type Split Air Conditioners 1, Supply Installation testing and commissioning of Inverter type Split Air Conditioners 2, Supply Installation testing and commissioning of Inverter type Split Air ... of Inverter type ... of Inverter type ... of Inverter type ... of Inverter type ...
TENDER FOR THE MAINTENANCE OF AIR CONDITIONS SPLIT,DUCT,CASETTE,CENTRALIZED, NON-INVERTER DUCTED, DX FIXED SPEED CASETTE INSTALLED AT BOWRING & LADY CURZON HOSPITALS, HSIS GOSHA HOSPITAL, CHARAKA SUPER SPECIALTY HOSPITAL AND COLLEGE BUILDING SABVMCRI, SHIVAJINAGAR, BENGALURU
BLUE STAR Cooling Only 1 Ton 3 Star (ISEER value from 3.8 to 4.39), BLUE STAR Cooling Only 1 Ton 3 Star (ISEER value from 3.8 to 4.39) Inverter AC - Variable Speed Wall Mount Split AC
BLUE STAR Cooling Only 1.5 Ton 3 Star (ISEER value from 3.8 to 4.39), BLUE STAR Cooling Only 1.5 Ton 3 Star (ISEER value from 3.8 to 4.39) Inverter AC - Variable Speed Wall Mount Split AC
INDCOOL Cooling Only 1.5 Ton Green AC 5 Star (ISEER value Not less, INDCOOL Cooling Only 1.5 Ton Green AC 5 Star (ISEER value Not less than 5.33) Inverter AC - Variable Speed Wall Mount Split AC
BPL Cooling Only 1 Ton 2 Star (ISEER value from 3.5 to 3.79) Non-, BPL Cooling Only 1 Ton 2 Star (ISEER value from 3.5 to 3.79) Non-Inverter AC - Fixed Speed Wall Mount Split AC
Voltas Cooling Only 2 Ton 3 Star (ISEER value from 3.8 to 4.39) Non-, Voltas Cooling Only 2 Ton 3 Star (ISEER value from 3.8 to 4.39) Non-Inverter AC - Fixed Speed Wall Mount Split AC
godrej Cooling Only 1.5 Ton 3 Star (ISEER value from 3.8 to 4.39) Non-, godrej Cooling Only 1.5 Ton 3 Star (ISEER value from 3.8 to 4.39) Non-Inverter AC - Fixed Speed Wall Mount Split AC
BLUE STAR Cooling Only 1.5 Ton 3 Star (ISEER value from 3.8 to 4.39), BLUE STAR Cooling Only 1.5 Ton 3 Star (ISEER value from 3.8 to 4.39) Inverter AC - Variable Speed Wall Mount Split AC
BLUE STAR Cooling Only 1 Ton 3 Star (ISEER value from 3.8 to 4.39), BLUE STAR Cooling Only 1 Ton 3 Star (ISEER value from 3.8 to 4.39) Inverter AC - Variable Speed Wall Mount Split AC
BLUE STAR Cooling Only 1 Ton 3 Star (ISEER value from 3.8 to 4.39), BLUE STAR Cooling Only 1 Ton 3 Star (ISEER value from 3.8 to 4.39) Inverter AC - Variable Speed Wall Mount Split AC
BLUE STAR Cooling Only 1 Ton 3 Star (ISEER value from 3.8 to 4.39), BLUE STAR Cooling Only 1 Ton 3 Star (ISEER value from 3.8 to 4.39) Inverter AC - Variable Speed Wall Mount Split AC
BLUE STAR Cooling Only 1.5 Ton 3 Star (ISEER value from 3.8 to 4.39), BLUE STAR Cooling Only 1.5 Ton 3 Star (ISEER value from 3.8 to 4.39) Inverter AC - Variable Speed Wall Mount Split AC
BLUE STAR Cooling Only 1.5 Ton 3 Star (ISEER value from 3.8 to 4.39), BLUE STAR Cooling Only 1.5 Ton 3 Star (ISEER value from 3.8 to 4.39) Inverter AC - Variable Speed Wall Mount Split AC
BLUE STAR Cooling Only 2 Ton 3 Star (ISEER value from 3.8 to 4.39), BLUE STAR Cooling Only 2 Ton 3 Star (ISEER value from 3.8 to 4.39) Inverter AC - Variable Speed Wall Mount Split AC
BLUE STAR Cooling Only 1 Ton 3 Star (ISEER value from 3.8 to 4.39), BLUE STAR Cooling Only 1 Ton 3 Star (ISEER value from 3.8 to 4.39) Inverter AC - Variable Speed Wall Mount Split AC
BLUE STAR Cooling Only 1 Ton 3 Star (ISEER value from 3.8 to 4.39), BLUE STAR Cooling Only 1 Ton 3 Star (ISEER value from 3.8 to 4.39) Inverter AC - Variable Speed Wall Mount Split AC
BLUE STAR Cooling Only 2 Ton 3 Star (ISEER value from 3.8 to 4.39), BLUE STAR Cooling Only 2 Ton 3 Star (ISEER value from 3.8 to 4.39) Inverter AC - Variable Speed Wall Mount Split AC
BLUE STAR Cooling Only 2 Ton 3 Star (ISEER value from 3.8 to 4.39), BLUE STAR Cooling Only 2 Ton 3 Star (ISEER value from 3.8 to 4.39) Inverter AC - Variable Speed Wall Mount Split AC
INVERTER FOR FUEL PUMP MOTOR AC 3-PHASE (7 GPM) TO DLW PART NO. 11815565 AND EMD PART NO. 40302210 FOR WDG4/WDP4 HHP LOCOMOTIVES. MAKE: EMD, PARAGON, GREENTECH, ELIXIR ONLY. Firm's offer: Same as abo
LG Cooling Only 1.5 Ton 5 Star (ISEER value from >=5 to <=5.5) Inverter AC - Variable Speed Wall Mount Split AC Brand: LG (Detailed Description/Specification as per Product # 1 of GeM Contract N
Custom Bid for Services - CAMC for 1X80 KVA Power One UPS and Servo controlled voltage stabilizer with isolation transformer at ADA upto 31st Dec 2023, Custom Bid for Services - CAMC for 1X20 KVA UPS for reception building at ADA upto 31st Dec 2023, ... 2X120 KVA UPS at ...
UPS 2X25 KVA (SET), 25 KVA SERVO CONTROLLED STABILIZER FOR BYPASS INPUT OF UPS SYSTEM WITH INSTALLAT
Online UPS (?10 KVA) With Battery Conforming To IS 16242 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6917509 Dated : 21-11-2025 Bid Document 1/8 Number of Auto Extension count 1 Past Performance 50 % Bid to RA enabled No RCM Applicable Yes Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Online UPS (?10 KVA) With Battery Conforming To IS 16242 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6888420 Dated : 13-11-2025 Bid Document 1/7 Number of Auto Extension count 1 Past Performance 50 % Bid to RA enabled No RCM Applicable Yes Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Design, Engineering, Manufacture, Supply, installation and commissioning of 2 sets of 220V, 2000Ah capacity Lead acid Tubular in Transparent SAN container battery Bank (each set consists of 108 No of 2V, 2000 Ah capacity Lead acid Tubular cells) with all accessories and necessary spares to retrofit the existing 2 sets of 220V, 2000Ah capacity Lead acid Tubular in Transparent SAN container (OPzS) battery banks of Unit 7 with buy back arrangement at RTPS
MOEI & Fans, i/c R/M of WSPS, Street lights, UPS, DG Set at GPRA, Vijayanagar, Bangalore for the year 2026-27. Sub Head:- 1) Operation & Maintenance of Electrical & Mechanical installations & pumpsets, street lights at GPRA Vijayanagar, Bangalore. ... AMC online UPS . ...
24 Gigabit port PoE Layer 2 Manageable Switch with 3 yrs warranty, Wireless Indoor Access Point, Networking IO Box, UTP Cat 66e Cable 305M, Networking UTP Patch Cord 2 mtrs, Networking UTP Patch Cord 1 mtr, 24 Port UTP Patch Panel, 9U Rack for ... 1 KVA UPS with ... 42Ah SMF Batteries 1 ...
Providing Annual Maintenance of Electrical Installation Such has Switches, Sockets, Modular plates, Modular PVC boxes, LED Tubes, Drivers, Fans, Capacitors, UPS, System, Split-Cassette type Air Conditioners, Street Lights and 250-320 KVA DG Sets Periodical Servicing of AMF Panel Board LT Distribution Panel Board Control Switch Gears at KPSC and Lokayuktha Office Khanija Bhavan Building Bengaluru
Online UPS (?10 KVA) With Battery Conforming To IS 16242 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 2, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6887872 Dated : 13-11-2025 Bid Document 1/7 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Online UPS (?10 KVA) With Battery Conforming To IS 16242 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 2, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6822011 Dated : 24-10-2025 Bid Document 1/7 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Online UPS (?10 KVA) With Battery Conforming To IS 16242 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 2, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/7022317 Dated : 19-12-2025 Bid Document 1/7 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Online UPS (?10 KVA) With Battery Conforming To IS 16242 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 2, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6888015 Dated : 13-11-2025 Bid Document 1/6 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Online UPS (?10 KVA) With Battery Conforming To IS 16242 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 2, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6817530 Dated : 23-10-2025 Bid Document 1/6 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No