Loading…
Loading…
3,736 results • Best match
MAINT AND REPAIR OF SUMMER APPLIANCES INCLUDING INVERTER TYPES OF ACs INSTALLED IN DIFFERENT UNITS OF INS VENDURTHY , SANJIVANI, HQ SNC NSRY AT NAVAL BASE KOCHI
Supply and installation of 1KV UPS(15 Nos) and 2KV online UPS (1) for CCTV system in GAVC Thripunithura, Ernakulam
Entry and Mid Level Desktop Computer (Q2), Online UPS (? 10 KVA) With Battery Conforming To IS 16242 (Part 1) (Q2)
Entry and Mid Level Desktop Computer (Q2), Online UPS (V2) (Q2), Multimedia Projector (MMP) (Q2), High End Desktop Computer (Q2)
Entry and Mid Level Laptop - Notebook (Q2), Online UPS (? 10 KVA) With Battery Conforming To IS 16242 (Part 1) (Q2)
Line Intractive UPS with AVR, Online UPS Bidder Turnover (Last 3 Years) 6 Lakh (s) Experience Criteria 3 Year (s)
Entry and Mid Level Desktop Computer (Q2), Online UPS (? 10 KVA) With Battery Conforming To IS 16242 (Part 1) (Q2)
MAINTENANCE AND REPAIR OF SUMMER APPLAINCES INCLUDING INVERTER TYPE ACs INSTALLED IN DIFFERENT UNITS OF INS VENDURUTHY, INHS SANJIVANI, NSRY AND HQ SNC AT NAVAL BASE KOCHI.
GENERAL Working Womens Hostel Providing Inverter supply to the Lobby Passage and toilet area and additional electrical requirements in working womens Hoslel Muttambalam Kottayam General Electrical Work
REPLACEMENT OF DEFECTIVE OLD SPLIT AIR CONDITIONER UNITS WITH 5 STAR / 3 STAR RATED INVERTER TYPE AIR CONDITIONER UNITS IN QEL BUILDING AT SPICES BOARD, PALARIVATTOM, KOCHI
DEPOSIT-Installation of 6Nos 10 KVA UPS and providing Electrical Installation at District C o l l e c t o r a t e , E r n a k u l a m . - P r o v i d i n g Connections for 6 Nos of UPS in Electrical room, Ground floor in District Collectorate
Air Conditioner Air Conditioner ( 9 ) Technical Specifications Specification Specification Name Values Allowed Values CAPACITY/GENERIC Type of Air conditioner High wall Split AC highwallsplitac Technology of AC Inverter (Variable Speed) Inverter ... Non- Inverter (Fixed ...
Online UPS (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes Bid to RA enabled No Type of Bid Single Packet Bid Bid Number : GEM/2025/B/6350475 Dated : 17-06-2025 Bid Document 1/8 Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 3.00 ( ) Duration of ePBG required (Months). 38 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : ACCOUNTS OFFICER Liquid Propulsion Systems Centre, Department of Space, indian space research organization, Department of Space (Anoop Bs) Splitting
GENERAL -Comprehensive Maintenance of VRF and Inverter Type Ductable AC units installed in Stroke ICU stroke theatre and Cath Lab in Government Medical college Tvpm-Electrical AC Work
GENERAL-PWD RH Inverter Installation- Providing Electrical and Electronics accessories, Truss work in Verandas and maintenance works of PWD Rest house Agali, Attappadi-Providing Water Purifier, Washing machine,
PWD Rest House Kayamkulam-Providing 3.5 KVA Inverter in Ground floor and First floor of Rest Hose Rooms except VIP -01 and VIP -01 A-General Electrical Work
Supply, Installation, Testing and commissioning of 3KWp Solar PV Power Plant and Inverter system at Government LP School, Parampuzha and Government UP School, Nattassery in Vijayapuram Grama Panchayath
GENERAL Maintenance of toilet Providing Tile for staircase and rectification of leak in PWD Tourist Bangalow Mananthavady Installation of Air conditioner Inverter and water dispenser General Electrical Work
PWD Buildings Section Feroke- PWD Buildings Section Feroke-General Electrical Work-Renovation of temporarily allotted Rest house portion in First Floor - Providing air conditioner units and Inverter lines.
GENERAL-Rest House Chathannoor-Urgent maintenance of 2Tr split air conditioner VIP Room and Replacement of Damaged 3KVA Inverter Battery unit in buy back Scheme-General Electrical Work
Supply, Errection,Testing and Commisioning of 220V,100 AH, Plante Type Battery Bank under buyback at Urumi 1 SHEP
Supply of 220V 490AH Battery Bank- Ni-Cd type and Buy Back, Supply of 1.2V 490AH Ni-Cd Spare Cell, Service charges for Dismantling of existing battery set, installation, testing and commissioning, Supply of 48V 810AH Battery Bank- Ni-Cd type and Buy ... 600AH Battery Bank - ... 715AH Battery Bank - ... 355AH Battery Bank - ... 465AH Battery Bank - ... 540AH Battery Bank - ... 370AH Battery Bank - ... 600AH Battery Bank Ni-Cd ... 1080AH Battery Bank - ...
Supply and Installation of 02 units of 1.5 TR and 01 unit of 2 TR Inverter type Split Air Conditioners in various dept of Regional Cancer Centre, Thiruvananthapuram, Kerala state.
SITC of Computers, UPS Systems, Data, Telephone and power cablings and terminations for the Business Jet Terminal at CIAL.
Online UPS (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Bid to RA enabled No RCM Applicable Yes Type of Bid Two Packet Bid Bid Number : GEM/2025/B/6677538 Dated : 12-09-2025 Bid Document 1/6 Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 11 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Vandithadam veterinary Hospital in Thiruvallam - Providing Electrification to thenewly constructed Dog camp building and providing additional light, fan, plug, plug-point with inverter facilities to the hospital Building - reg.
Design, supply, installation, and commissioning of a 20kWp grid-connected SPV power plant with a 20kW inverter, utilizing 32 no.s of 315Wp solar panel at the CHC Periya Kasaragod
MAINTENANCE AND REPAIR OF SUMMER APPLAINCES INCLUDING INVERTER TYPE ACs INSTALLED IN DIFFERENT UNITS OF INS GARUDA, SFNA, NAY K, MOK AND SNC O MESS AT NAVAL BASE KOCHI.
Entry and Mid Level Desktop Computer (Q2), Online UPS (? 10 KVA) With Battery Conforming To IS 16242 (Part 1) (Q2) ( ( 3 3 ))
Entry and Mid Level Desktop Computer (Q2), Online UPS (? 10 KVA) With Battery Conforming To IS 16242 (Part 1) (Q2) (3 (3 ))
Entry and Mid Level Desktop Computer (Q2), Online UPS (?10 KVA) With Battery Conforming To IS 16242 (Part 1) (Q2) (3 (3 ) )
Purchase of 18 Nos of batteries for 10 KVA UPS under Buyback scheme for software Lab in MCA Department
UPS and Electrical wiring
Online Ups Modular Type (Q3) MSE Exemption for Years Of Experience and Turnover Yes Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Past Performance, Bidder Turnover, OEM Authorization Certificate, OEM Annual Turnover *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Do you want to show documents uploaded by bidders to all bidders participated in bid? No Past Performance 10 % Bid to RA enabled No RCM Applicable Yes Type of Bid Two Packet Bid Bid Number ( ) : GEM/2025/B/6052940 Dated : 12-03-2025 Bid Document 1/8 Time allowed for Technical Clarifications during technical evaluation 2 Days Inspection Required (By Empanelled Inspection Authority/Agencies pre- registered with GeM) No Estimated Bid Value 60000 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No MII Purchase Preference MII Purchase Preference No MSE Purchase Preference MSE Purchase Preference Yes 1. If the bidder is a Micro or Small Enterprise as per latest definitions under MSME rules, the bidder shall be exempted from the requirement of "Bidder Turnover" criteria and "Experience Criteria" subject to meeting of quality and technical specifications. If the bidder is OEM of the offered products, it would be exempted from the "
RFP for Site work of 250 Nos. ATM Counters including supply, installation and commissioning of UPS Systems and Air Conditioners
Design, Supply, Installation, Testing and Commissioning of 2 Nos. of (Minimum 8 TR each) Inverter Ductable Split Air Conditioners for CEPD Contact Centre at 2nd Floor- Office Building, RBI, Kochi
REPAIR AND COMPREHENSIVE MAINTENANCE OF HOT AND COLD WATER COOLERS WITH INBUILT PURIFIERS AND REPAIR REPLACEMENT OF INVERTER TYPE ACS, PCB BOARDS INSTALLED AT VARIOUS LOCATIONS AT NAVAL BASE KOCHI.
DEPOSIT-District Judiciary - Purchase of 2KVA inverter with 2 numbers of 12V/150AH tubular batteries for the Munsiff Court, Parappanangadi-in the place of old unserviceable one-General Electrical Work
DEPOSIT-District Judiciary - Purchase of 2KVA inverter with 2 numbers of 12V/150AH tubular batteries for the Munsiff court, Manjeri. -in the place of old unserviceable one-General Electrical Work
Installation of Inverter in the Chamber of Sub Judge Providing Battery Charger to existing DG Set and Supply 8 Step Ladder to attending Electrical fault at Court Complex Punalur Kollam
GENERAL Setting up of Inverter and Battery storage room at Kozhencherry Taluk office Repairs to Drivers Cabin and other allied works in Mini Civil Station Pathanamthitta Work General Civil Work
Custom Bid for Services - AMC FOR NONVAM CENTRAL ACs NONINVERTER SPLIT ACs WINDOW ACs WATER COOLERS WATER DISPENSERS DUCTABLE ACs INVERTER SPLIT ACs CASSETTE ACs IN VARIOUS LOACTIONS OF BPCLKR
Server (Q2), Layer 2 Access Switch (V2) (Q2), Online UPS (V2) (Q2), Cat - 6 UTP Ethernet Cable for Wifi Indoor use (MTNL) (Q3)
Multimedia Projector (MMP) (Q2), Online UPS (?10 KVA) With Battery Conforming To IS 16242 (Part 1) (Q2), Projector Screen (V2) (Q3) (3 (3 ))
Supply of 5 Desktop Computers 5 KVA online UPS A3 Networking Printer Inkjet Color Printer MS Office 2019 Software and Multifunction LaserJet Printer
Online UPS (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6462705 Dated : 21-07-2025 Bid Document 1/7, -- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 4 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Financial Document Required Yes Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Supply and Installation of Additional CCTV camera, Inverter at District Collectors Camp Office, and Supply and Installation of additional Hard disk drive and Repair of Existing CCTV cameras at Collectorate,Wayanad
INVERTER FOR GP OFFICE