Loading…
Loading…
3,736 results • Best match
Voltas Cooling Only 2 Ton 3 Star (ISEER value from 3.8 to 4.39) Non-, Voltas Cooling Only 2 Ton 3 Star (ISEER value from 3.8 to 4.39) Non-Inverter AC - Fixed Speed Wall Mount Split AC
INDCOOL Cooling Only 1.5 Ton Green AC 5 Star (ISEER value Not less, INDCOOL Cooling Only 1.5 Ton Green AC 5 Star (ISEER value Not less than 5.33) Inverter AC - Variable Speed Wall Mount Split AC
Oneiric Cooling Only 2 Ton 3 Star (ISEER value from 3.8 to 4.39) Non-, Oneiric Cooling Only 2 Ton 3 Star (ISEER value from 3.8 to 4.39) Non-Inverter AC - Fixed Speed Wall Mount Split AC
INDCOOL Cooling Only 1.5 Ton Green AC 5 Star (ISEER value Not less, INDCOOL Cooling Only 1.5 Ton Green AC 5 Star (ISEER value Not less than 5.33) Inverter AC - Variable Speed Wall Mount Split AC
BLUE STAR Cooling Only 2 Ton 3 Star (ISEER value from 3.8 to 4.39), BLUE STAR Cooling Only 2 Ton 3 Star (ISEER value from 3.8 to 4.39) Inverter AC - Variable Speed Wall Mount Split AC
Voltas Cooling Only 1 Ton 3 Star (ISEER value from 3.8 to 4.39) Non-, Voltas Cooling Only 1 Ton 3 Star (ISEER value from 3.8 to 4.39) Non-Inverter AC - Fixed Speed Wall Mount Split AC
BLUE STAR Cooling Only 1.5 Ton 3 Star (ISEER value from 3.8 to 4.39), BLUE STAR Cooling Only 1.5 Ton 3 Star (ISEER value from 3.8 to 4.39) Inverter AC - Variable Speed Wall Mount Split AC
LLOYD Cooling Only 1.5 Ton 3 Star (ISEER value from 3.8 to 4.39) Non-, LLOYD Cooling Only 1.5 Ton 3 Star (ISEER value from 3.8 to 4.39) Non-Inverter AC - Fixed Speed Wall Mount Split AC
BLUE STAR Cooling Only 2 Ton 3 Star (ISEER value from 3.8 to 4.39), BLUE STAR Cooling Only 2 Ton 3 Star (ISEER value from 3.8 to 4.39) Inverter AC - Variable Speed Wall Mount Split AC
BLUE STAR Cooling Only 1.5 Ton 3 Star (ISEER value from 3.8 to 4.39), BLUE STAR Cooling Only 1.5 Ton 3 Star (ISEER value from 3.8 to 4.39) Inverter AC - Variable Speed Wall Mount Split AC
BLUE STAR Cooling Only 2 Ton 3 Star (ISEER value from 3.8 to 4.39), BLUE STAR Cooling Only 2 Ton 3 Star (ISEER value from 3.8 to 4.39) Inverter AC - Variable Speed Wall Mount Split AC
BLUE STAR Cooling Only 2 Ton 3 Star (ISEER value from 3.8 to 4.39), BLUE STAR Cooling Only 2 Ton 3 Star (ISEER value from 3.8 to 4.39) Inverter AC - Variable Speed Wall Mount Split AC
BLUE STAR Cooling Only 1 Ton 3 Star (ISEER value from 3.8 to 4.39), BLUE STAR Cooling Only 1 Ton 3 Star (ISEER value from 3.8 to 4.39) Inverter AC - Variable Speed Wall Mount Split AC
Voltas Cooling Only 1 Ton 3 Star (ISEER value from 3.8 to 4.39) Non-, Voltas Cooling Only 1 Ton 3 Star (ISEER value from 3.8 to 4.39) Non-Inverter AC - Fixed Speed Wall Mount Split AC
Voltas Cooling Only 2 Ton 3 Star (ISEER value from 3.8 to 4.39) Non-, Voltas Cooling Only 2 Ton 3 Star (ISEER value from 3.8 to 4.39) Non-Inverter AC - Fixed Speed Wall Mount Split AC
BLUE STAR Cooling Only 1.5 Ton 3 Star (ISEER value from 3.8 to 4.39), BLUE STAR Cooling Only 1.5 Ton 3 Star (ISEER value from 3.8 to 4.39) Inverter AC - Variable Speed Wall Mount Split AC
BLUE STAR Cooling Only 1.5 Ton 3 Star (ISEER value from 3.8 to 4.39), BLUE STAR Cooling Only 1.5 Ton 3 Star (ISEER value from 3.8 to 4.39) Inverter AC - Variable Speed Wall Mount Split AC
BLUE STAR Cooling Only 1 Ton 3 Star (ISEER value from 3.8 to 4.39), BLUE STAR Cooling Only 1 Ton 3 Star (ISEER value from 3.8 to 4.39) Inverter AC - Variable Speed Wall Mount Split AC
BLUE STAR Cooling Only 1 Ton 3 Star (ISEER value from 3.8 to 4.39), BLUE STAR Cooling Only 1 Ton 3 Star (ISEER value from 3.8 to 4.39) Inverter AC - Variable Speed Wall Mount Split AC
BLUE STAR Cooling Only 1 Ton 3 Star (ISEER value from 3.8 to 4.39), BLUE STAR Cooling Only 1 Ton 3 Star (ISEER value from 3.8 to 4.39) Inverter AC - Variable Speed Wall Mount Split AC
DEPOSIT-District Judiciary-Purchase and installation of 2KVA inverter with 2Nos of 150AH tubular batteries in the place of old unserviceable one for the use in the Additional District and Sessions Court-I, Manjeri.-General Electric
Design, Supply, Installation and Commissioning of 20kWp Grid Connected SPV Power Plants -Maintenance of 10kW On grid SPV by adding additional 10kW panels with 20kW On-Grid Inverter and BOS at Pattanakkad Block Panchayath, Alappuzha District
10kVA, 3 Phase Solar Hybrid inverter, 15kVA
Entry and Mid Level Desktop Computer (Q2), Online UPS (? 10 KVA) With Battery Conforming To IS 16242 (Part 1) (Q2), Line Interactive UPS with AVR (V2) (Q2) (3 (3 ))
Entry and Mid Level Laptop - Notebook (Q2), Entry and Mid Level Desktop Computer (Q2), Online UPS (?10 KVA) Without Battery Conforming To IS 16242 (Part 1) (Q2) (3 (3 ))
BLUE STAR Cooling Only 1.5 Ton 3 Star (ISEER value from 3.8 to 4.39), BLUE STAR Cooling Only 1.5 Ton 3 Star (ISEER value from 3.8 to 4.39) Non-Inverter AC - Fixed Speed Wall Mount Split AC
PWD Rest Houses-Providing Inverter Units in Rest Houses and R e a r r a n g e m e n t s i n E I ( R H Koyilandy,Balussery and Thamarassery).- General Electrical Work
Online UPS (>10 KVA) With Battery (Q2) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6860098 Dated : 06-11-2025 Bid Document 1/8, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Financial Document Required Yes Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 62 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : CDAC, Vellayambalam, Thiruvanthapuram Thiruvananthapuram, Department of Electronics and Information Technology, Centre for Development of Advanced Computing (C-DAC), Ministry of Electronics and Information Technology (Centre For Development Of Advanced Computing) UIN Number NCTGC2415P 2/8
Purchase of New UPS system for simulation and computation lab of ECE department in under buy back scheme
Online UPS (?10 KVA) With Battery Conforming To IS 16242 (Part 1) (Q2) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 2, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6986364 Dated : 10-12-2025 Bid Document 1/7 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Online UPS (?10 KVA) With Battery Conforming To IS 16242 (Part 1) (Q2) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 2, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6983120 Dated : 10-12-2025 Bid Document 1/7 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Development works at Composite Regional Centre for Skill Development, Rehabilitation and Empowerment of persons with Disabilities, Kozhikode, Kerala. SH: SITC OF CCTV Surveillance System.SH: 2: SITC of EPABX .SH: 3: SITC of LAN. SH:4: SITC OF 2 Nos ... 10 KVA UPS . ...
BLUE STAR Cooling Only 1.5 Ton Green AC 5 Star (ISEER value Not less, BLUE STAR Cooling Only 1.5 Ton Green AC 5 Star (ISEER value Not less than 5.33) Inverter AC - Variable Speed Wall Mount Split AC
BLUE STAR Cooling Only 1.5 Ton Green AC 5 Star (ISEER value Not less, BLUE STAR Cooling Only 1.5 Ton Green AC 5 Star (ISEER value Not less than 5.33) Inverter AC - Variable Speed Wall Mount Split AC
BLUE STAR Cooling Only 1 Ton Green AC 5 Star (ISEER value Not less, BLUE STAR Cooling Only 1 Ton Green AC 5 Star (ISEER value Not less than 5.8) Inverter AC - Variable Speed Wall Mount Split AC
BLUE STAR Cooling Only 1 Ton Green AC 5 Star (ISEER value Not less, BLUE STAR Cooling Only 1 Ton Green AC 5 Star (ISEER value Not less than 5.8) Inverter AC - Variable Speed Wall Mount Split AC
SPLIT AC UNIT - 1TR, INVERTER TYPE, Installation of 1TR split ACs, SPLIT AC UNIT - 1.5TR, INVERTER TYPE, Installation of 1.5TR split ACs
Online UPS (?10 KVA) Without Battery Conforming To IS 16242 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Experience Criteria, Past Performance, Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate, OEM Annual Turnover, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2026/B/7157557 Dated : 28-01-2026 Bid Document 1/6, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Past Performance 20 % Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 180000 Payment Timelines Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Online UPS (?10 KVA) With Battery Conforming To IS 16242 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2026/B/7099696 Dated : 11-01-2026 Bid Document 1/6, -- Number of days for which Bid would be auto -- extended 5 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Financial Document Required Yes Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Online UPS (?10 KVA) With Battery Conforming To IS 16242 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6951058 Dated : 01-12-2025 Bid Document 1/7, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 4 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Annual Maintenance Service - Desktops, Laptops and Peripherals - UPS (Online 6 KVA); Eaton 6KVA Online UPS, Annual Maintenance Service - Desktops, Laptops and Peripherals - UPS (Online 2 KVA); Numeric, Annual Maintenance Service - Desktops, Laptops ... KVA Online UPS ; ...
Gym Mat, Window Blinds, Partition Work, Wall Fan, Executive Table 4x2, High Back Revolving Chair, Electrical Cabling for Fan, Electrical Cabling for Air Conditioner, Online UPS 2KVA with 100Ah Tubular Battery
MOEI and fans including running operation and maintenance of water supply pumpset 160KVA sub station street lights etc at Indian Institute of Mass Communication (IIMC) Pampday Kottayam during 2023-24 S.H Additional EI works including providing ... providing inverter wiring ...
CARD CONTROL HVS026 HITACHI MRC2, INVERTER CELL HVIU1760DI1BC HITACHI
200 AH BATTERY (Q3), INVERTER WITH WARRANTY SUPPORT (Q3)
LAPTOP WITH WARRANTY SUPPORT (Q3), INVERTER AND BATTERY (Q3)
General Electrical Work
The scope of the work involves supply and installation of CCTV cameras, NVR, UPS Systems and associated data and power cabling and terminations at Trade Fair Centre at CIAL.
Air Conditioner Air Conditioner ( 4 ) Technical Specifications Specification Specification Name Values Allowed Values CAPACITY/GENERIC Type of Air conditioner High wall Split AC highwallsplitac Technology of AC Inverter (Variable Speed) ... Speed) inverter (variablespeed) ... DUAL INVERTER - ...