Loading…
Loading…
4,891 results • Best match
COVER ASSY, DRIVEN PLATE FOR CLUTCH, DOOR LOCK ASSY RH, DOOR LOCK ASSY LH, U J KIT, DUAL BRAKE VALVE, TIE ROD END RH, DRYING DISTRI UNIT
HOSE FOR CONNECTING TWO MANIFIELDS, HIGH PRESSURE PIPE, COUPLING FLANGE, PRESSURE GUAGE, INJECTOR FOR HA294, PIPE EXHAUST EXTENTION 3 MTR, SPEED CONTROL CABLE STANDARD, VALVE AIR EXHAUST
CLUTCH DISC DRIVE FRONT, DRIVEN DISC, STTERING HYD BOOSTER REP KIT, DOUBLE SAFETY VALVE, INLET HOSE FOR OIL COOLER, DRAIN PIPE, PIPE ASSY FROM WATER SEPERATOR, DIAPHRAGM
Alternator, Head light Relay, Repair kit Relay Valve, Armeture Assy, Cylinder Kit, Gasket Set, Spark Plug, Clutch Cyl Assy, Rep Kit for Main Cyl Clutch, Delivery Pipe
ASSY CLUTCH MASTER CYL, MOUNTING ENGINE REAR, FIELD COIL, SOLENOID SWITCH, CABLE ASSY CONTROL, HAND BRAKE VALVE REPAIR KIT, REPAIR KIT WATER PUMP, WHEEL CYL REPAIR KIT
COMBINATION SWITCH, ROTOR FINAL ASSY, DUEL BRAKE VALVE, ISOLATOR SWITCH, ASSY FLY WHEEL, REGULATOR, FIELD COIL, BRUSH GEAR ASSY, OIL SEAL, S A WATER PUMP B-7016007
bearing needle, oil seal, ball bearing, mounting rh rear, assy compressor 1st pipe with hose, pump assy fuel, field coil assy 24v, body assy throttle, valve assy
GASKET CYL HEAD, PINION RING SET, VALVE GUIDE, SLEEVE RUBBER, NOZZLE, CRANK SHAFT BASE, PISTON ASSY STD, BEARING BUSH, SEAL OIL, AIR FILTER, PISTON ASSYB STD, CAPACITOR
Head Repair and Sceeming, Gasket Set Complete, AC Gas Filling, AC Discharge Pipe, AC Compressor Seal, Filter Rd, AC Valve, AC Fan Repair, Service And Fitting Charges
COLD REPAIR OF CYLINDER (SEMI-SKILLED), MANPOWER OF PURGING CYLINDER-SEMI-SKILLED (MAN DAY), CYLINDER HANDLING JOBS-UNSKILLED (MAN DAY), EVACUATION/VALVE CHANGE CYLINDER-SEMISKILLED (MAN DAY)
Earthwork for the excavation of trenches and laying of RCC UGPL of dia 450mm along with the fixing of the risers air vent alpha valve and pumpstand
SEAL, GASKET, HOSE 18MM, HOSE 32MM, HOSE 38MM, HOSE SEALING, HOSE 6MM, FILTER ASSY, CIRCUIT BREAKER, FILTER FILTER COURSE, PRESSURE REDUCING VALVE, HOSE ASSY RUBBER, HOSE RUBBER
Tie Rod Steering, Sensor Inlet Air Temp, Weather Strip Wind Shield, Clutch Plate Assy, Cover Assy, Release Bearing, Valve Break Pneumatic, Assy Rubber Below, Packing Set, Hose
ENGINE OVERHAUL KIT, AIR FILTER ELEMENT, KIT FUEL FILTER, VALVE ASSY WATER, MAJOR REP KIT, ASSY WIPER ARM, ASSY WIPER BLADE, WHEEL BOX, GEAR SHIFT LEVER KNOB
7310-000126 C0BI PUMP R0D, 7310-000135 C0BI VALVE C0NTR0L, 7310-000116 C0B1 BURNR CH0KE, 7330-000124 C00KER 12 LTR C0MP, 7310-000181 C00KER OIL BL0W LAMP
Stationary Valve Regulated Lead Acid Batteries (V2) as per IS 15549 (Q3) ( PAC Only ) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Bid Number : GEM/2025/B/6455064 Dated : 18-07-2025 Bid Document 1/5 Evaluation Method Total value wise evaluation Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 3.00 ( ) Duration of ePBG required (Months). 27 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : Accounts Officer Physical Research Laboratory, Opp. ATIRA, University Road, Navrangpura, Ahmedabad - 380 009 (Accounts Officer, Prl) Splitting
Stationary Valve Regulated Lead Acid Batteries (V2) as per IS 15549 (Q3) MSE Exemption for Years Of Experience and Turnover Yes Startup Exemption for Years Of Experience and Turnover Yes Document required from seller Experience Criteria, Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number ( ) : GEM/2024/B/5726404 Dated : 19-12-2024 Bid Document 1/5 Inspection Required (By Empanelled Inspection Authority/Agencies pre- registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No MII Purchase Preference MII Purchase Preference Yes MSE Purchase Preference MSE Purchase Preference Yes 1. If the bidder is a Micro or Small Enterprise as per latest definitions under MSME rules, the bidder shall be exempted from the requirement of "Bidder Turnover" criteria and "Experience Criteria" subject to meeting of quality and technical specifications. If the bidder is OEM of the offered products, it would be exempted from the "
, operation maintenance of Mechanical Workshop and Plant drainage pumps of GHTP Stage-I and II, on lump sum basis for a period of one year.
Needle Valve (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6466954 Dated : 19-07-2025 Bid Document 1/5 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Providing and laying jointing fixing testing ISI Marked GI Pipe PVC Pipes Dismantling brick Dismantling of cement concrete 80mm thick cement concrete Sluice Valves Chamber Water Connection on New Proposed PVC Pipe Line and O M for 3 Months complete
Earth work for excavation of trenches for laying of underground pipeline , lowering and jointing of 250 mm, 300mm, 350mm, 400mm, 500mm diameters RCC pipes, fixing of risers, alfa alfa valves, air vent pipes and pump stands and construction of haudie
Earthwork in excavation in trenches for laying of underground pipeline, lowering and jointing of 400 mm, 450 mm and 500 mm diameter RCC pipes, fixing of risers, alfa alfa valves, air vent pipes and pump stands and construction of haudies
Earth work for excavation of trenches for laying of underground pipeline , lowering and jointing of 250 mm, 300mm, 350mm, 400mm,450mm,600mm diameters RCC pipes, fixing of risers, alfa alfa valves, air vent pipes and pump stands and construction of h
Towel Rail/Ring for Bathroom (Q3), Flushing Cistern (Q3), Cast Copper Alloy Screw Down Bib Taps and Stop Valves for Water Services as per IS 781 (Q3), Copper Alloy Fancy Taps for Bathroom as per IS 8931 (Latest) (Q3), Sinks (Q3)
Providing and Installing deep tubewell 200 mm i/d straight 150 mtr depth with 20 mtr stainless strainer with Reverse Rotary Rig,Depth 150 mtr, Pumping machinery, Chlorinator, and Gravel Pit, sluice valves and making connection with rising main, etc.
Earth work for excavation of trenches for laying of underground pipeline , lowering and jointing of 250 mm, 300mm, 350mm, 400mm, 450mm diameters RCC pipes, fixing of risers, alfa alfa valves, air vent pipes and pump stands and construction of haudies
Earth work for excavation of trenches for laying of underground pipeline , lowering and jointing of 250 mm, 300mm, 350mm, 400mm,450 mm diameters RCC pipes, fixing of risers, alfa alfa valves, air vent pipes and pump stands and construction of haudie
Earth work in excavation in trenches for laying of underground pipeline, lowering and jointing of RCC pipes of various diameter, fixing of air vent pipes, risers, alfa alfa valves, pump stand pipes and construction of haudies at 10 different sites
Earth work in excavation of trenches for laying of underground pipeline, lowering and jointing of RCC pipes of various diameter, fixing of air vent pipes, risers, alfa alfa valves, pump stand pipes and construction of haudies at 4 different sites
such as ID,FD,PA and Seal air Fans, Bowl Mills, R.C. Feeders and Bunkers, Coal Valves, Mill Reject Handling system, transportation/ Dumping of Coal Mill Reject etc. on Lump sum basis at GHTP for a period of one year.
such as ID,FD,PA and Seal air Fans, Bowl Mills, R.C. Feeders and Bunkers, Coal Valves, Mill Reject Handling system, transportation/ Dumping of Coal Mill Reject etc., on Lump sum basis at GHTP for a period of one year.
Earth work in excavation in trenches for laying of underground pipeline, lowering and jointing of RCC pipes of various diameter, fixing of air vent pipes, risers, alfa alfa valves, pump stand pipes and construction of haudies at 5 different sites
Earth work for excavation of trenches for laying of underground pipeline, lowering and jointing of 300mm, 350mm, 400mm, 450mm,600 mm dia RCC pipes, fixing of risers, alfa alfa valves, air vent pipes and pump stands and construction of haudi
Stationary Valve Regulated Lead Acid Batteries (V2) as per IS 15549 (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6317109 Dated : 18-07-2025 Bid Document 1/6 Bid to RA enabled Yes RA Qualification Rule 50% Lowest Priced Technically Qualified Bidders Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Bid Details EMD Detail Required No ePBG Detail Required No Splitting
40987 HEAD AND ROTOR ASSY, 21232 LINER TRANSFER PUMP, 34759B LADE TRANSFER PUMP, 41337 NOZZLE, 27608 SEAL TRASFER PUMP, 27245 SEAL O RING, 33307 VALVE BODY SLEEVE ASSY
Engagement Clutch Bush, Distnce camp Over Switch, Bush Set, Roter carrier, Brake Manual valve, Assy Spring brake Actuator, Brake Cylinder, disc Clutch, Cover Assy Clutch, Sensor water tem
REPAIR PUMP ELEMENT TATRA 815, REPAIR DELIVERY VALVE AND HOLDER TATRA 815, REPAIR FIP OVERHAUL KIT TATRA 815, REPAIR INJECTOR NOZZLE TATRA 815, REPAIR GOVERNOR WEIGHT TATRA 815
CABLE, HYDRAULIC PIPE, OVER FLOW PIPE, FUEL OVER FLOW PIPE, SPIN ON FILTER, BALL BEARING, HOSE ASSY FILTER TO SUPPLY, FUEL PIPE, CABLE ASSY EM JACK, NRD VALVE
Water proof Self starter, Relief Valve, Rectifier Assy, Minus Plate, Armature Assy, Brush Gear Assy, Self Bush Set, Clutch Booster Rep kit, Rep kit for main cyl clutch
COIL ASSY IGNITION, RADIATOR ASSY, DOOR REGULATOR RH, CLUTCH BOOSTER, BTY CUT OFF SWITCH, HYD HOSE, PACK RECTIFIER, REGULATOR ENGINE GENERATOR, SOLENOID VALVE, BECON LIGHT, CLUTCH FAN ASSY
SLEEVE CYL REPAIR KIT, VALVE RELAY AIR PRESSURE, CLUTCH REPAIR KIT, SEALING RING, BEARING TAPERED ROLLER, PAD, FUEL FILTER, SPARK PLUG, BELT TIMING, WHEEL BEARING, FLASHER SOLID STATE
X3 NOZZLE, X3 PUMP ELEMENT, X3 PRESSURE VALVE, X3 PRESSURE GAUGE, X3 BELT, X3 FUEL FILTER, X3 OIL FILTER, X3 HP LINE, X3 CONTRACTOR, X3 BTY CHARGER UNIT
Air Intake Hose, Gasket Elbow to Bypass, Coolant Pipe Hose, Absorber Front Bumper, Condensor Fan 16 inch, Support Front Bumper LH, Support Front Bumper RH, Assy Water Valve
HYDROLIC FUEL PIPE, RADIATOR HOSE, HOSE 3 OBLIQUE 8 INCH X 3 OBLIQUE 8 INCH BSP X 2075 LONG, LH SIDE WINDOW RUBBER, SIDE WINDOW GLASS, SOLANOID VALVE
T06560000307or 27860799916 SPACER MOUNTING, 278605999977 CAMSHAFT, 278618999972 CAP FILLER VALVE COVER, T06560000304 TUBE AIR FUEL CONTROL, 278601999984 STUD M8X1.25X48, T06560000037 ASSY ROCKER LEVER, 278607989922 HOUSING GEAR, 278601999902 BUSHING
GASKET CYLINDER HEAD CSTD, FEED PUMP ASSY, MAGNETIC VALVE 24V, PLACE CYLINDER BLOCK STIFFENER BDE PLAT, TENSIONER BELT, BRAKE SHOE, BRAKE SHOE SPRING, HUB SEAL, FRONT WHEEL BEARING
Sleeve Cyl Assy, Piston Ring Set, Piston Assy, Sleeve Sim, Push Rod, Fan Belt, Rubber Coupling, Connecting Bearing, Crank Bearing, Injector Nozzle, NRD Valve, Governor Rod, Oil Filter
LV1 R72 AUTOMATIC PRESSURE REGULATOR, LV7 STLN CLUTCH MASTER CYL REPAIR KIT, LV7 STLN FUEL CUTT OFF SOLONOID, LV7 TMB ASSY LINK ROD, LV7 TMB PRESSURE RELEASE VALVE
Manpower Outsourcing Services - Minimum wage - Semi- skilled; Others; PUMP OPERATER, Manpower Outsourcing Services - Minimum wage - Unskilled; Others; PUMP OPERATOR, Manpower Outsourcing Services - Minimum wage - Unskilled; Others; VALVE MAN
TATA ROTARY PUMP OVERHAUL, TATA INJECTOR CLEANING, ALS VALVE GRINDING, ALS ROTARY PUMP OVERHAUL, ALS FUEL PIPE REPAIR, ALS WB ROTARY PUMP REPAIR, ALS WB AIR PIPE REPAIR