Loading…
Loading…
8,704 results • Best match
EXIDE Stationary Valve Regulated Lead Acid Batteries 75 Ah Brand: EXIDE (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687701175582 dt.17/12/2024)
EXIDE Stationary Valve Regulated Lead Acid Batteries 120 Ah Brand: EXIDE (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687788498347 dt.04/08/2025)
IOH Kit for Rotex magnet valve PT No.MFR14533 for Schneider VCB .MAKE: schneider. Note: Firm should submit authorised dealership certificate along with tender. FIRM'S OFFER :- Make Brand:SCHNEIDER H
EXIDE Stationary Valve Regulated Lead Acid Batteries 65 Ah Brand: EXIDE (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687716781387 dt.09/06/2025)
EXIDE Stationary Valve Regulated Lead Acid Batteries 75 Ah Brand: EXIDE (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687764651248 dt.24/04/2025)
EXIDE Stationary Valve Regulated Lead Acid Batteries 100 Ah Brand: EXIDE (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687754267907 dt.25/04/2025)
OH kit for Rotex make 3282 magnet valve. Kit consists of 9 items as per annexure enclosed. firms offer:ROTEX make.Hsn Code : 84819090.Rotex Model Number : AOH-3282-SB
SRPH157015-VALUVLOPLASTY ACCESSORIES - MULLINS TRANSEPTAL SHEATH - 8 F (KINK RESISTANT WITH HEMOSTATIC VALVE - 8F-SHEATH 61CM, DILATOR 67CM Unit: NO Firm's offer : COOK -FLEXOR RAABE GUIDING SHEATH MA
Vacuum Valve G1/2" to RCF Drawing no. LW63150 of item no. 3, alt -'e' for LHB Coaches Firm offered make: ( As per attached drawing) Make- Firm's self.
Supply and Laying of 90mm PVC Pipe, 110mm PVC Pipe,100 mm Sliuce valve, 100mm Dia MJ Collar in East Mada Street at Ward No.31 in TCMC
Supply of Spherical Valve Sealing rings both Fixed and Moving for the use at Kodayar Power House I in Tirunelveli Generation Circle under open tender two part system.
RATE CONTRACT FOR SUPPLY OF METALLIC END COVERS
Manufacturing of TRANSMITTER COVER ASSY
TTPS Mech II AHP Unit I II III Breakdown work in Ash Slurry Pump House equipments Overhauling of Ash slurry pump Seal water pump and Suction Delivery valves for the period from 01 04 2025 to 31 03 2026
TTPS Mech II AHP Unit I II III Breakdown work in Ash Slurry Pump House equipments Overhauling of Ash slurry pump Seal water pump and Suction Delivery valves for the period from 01 04 2024 to 31 03 2025
TTPS Mech II TM II Overhauling of various size of valves in Instrument and Service Air Compressors of Unit IV Pressure Vessel testing Hydrostatic test in Air Receiver Tanks and Air drier plant tanks of Unit IV and V
Supply of MOP Spares, HP shaft Sealing front and rear square wire, Drain hoses for HP,IP CVs, U Seal ring for HP control and stop valves, Balancing weight for LP rotor blades of TG set of Unit III
MTPS I TM Unit III Air Compressor System Cleaning painting renewal of Manhole door gaskets and Overhauling of Safety valves of Receiver Tanks of 1 and 2 of Instrument Air System overhauling of Refrigerant Dryer Providing bypass arrangements etc
TTPS Mech II BM Unit III Removal and relaying of worn out damaged cladding sheet refractory and insulation lagging at various elevations of Boiler pressure parts valves down comer pipe lines in Unit III Boiler during overhaul 2025 2026
TTPS Mech II AHP Unit IV Attending breakdown maintenance of APH ECO hopper equipments sea water pipe line and valves in unit IV for a period of work on or after 08 10 2020 and upto 31 03 2021
TTPS ES Circle MRT I Part of Cleaning works of junction Boxes and Push Button boxes related to Turbine side valves in plant area of Unit I II III for the period from 01 04 2026 to 31 032027
TTPS ES EM I Hydrostatic testing of 157 Nos of hydrogen gas cylinders, replacement of cylinder valves and painting the cylinders with 2 coats of recommended colour paint inclusive of transportation in respect of Hydrogen plant I and II
MTPSI BM Pressure parts Units III and IV Boiler Preventive Breakdown maintenance of Boiler Pressure Parts HP LP Valves Burner tilt mechanism oil gun cleaning soot blower operation cleaning and air washing of Boiler structures, floor and allied works
MTPS I TM Unit III Air Compressor System Cleaning painting renewal of Manhole door gaskets and Overhauling of Safety valves of Receiver Tanks of 1 2 of Instrument Air System service air system and overhauling of Refrigerant Dryer etc
nnual Maintenance of water supply scheme for supply and Repair of OHTcleaning, Pumping main, Distribution main, Valves, Pumpset, Borewell, Well, Hand pump and Minipower pumps at Ward No. 31 to 33,35,36,44 to 51 in Zone -III at Kancheepuram corporat
MTPS I Mill Plant AC Plant Unit I Air Washer System Epoxy painting of blowers discharge duct and spray system changing damaged canvas cloth and discharge duct Overhauling the AWCW Pump 1A 1B and 1C and gate valves etc
Annual Maintenance of water supply scheme for supply and Repair of OHT, Pumping main, Distribution main, Valves, Pumpset, Borewell, Well, Hand pump and Minipower pumps at Ward No. 19 to 30, and 34 in Zone -II at Kancheepuram corporation
TTPS Operation Circle CAD CWPH II Upkeepment and maintenance works in large dia pipelines, column pipes and accessories of cooling water pumps, discharge butterfly valves, 25, 5 Ton EOT crane and chlorination plant available in CWPH II for the
Annual Maintenance of water supply scheme for supply and Repair of OHTcleaning, Pumping main, Distribution main, Valves, Pumpset, Borewell, Well, Hand pump and Minipower pumps at Ward No. 19 to 30 and 34 in Zone -II at Kancheepuram corporation
TTPS Operation Circle OE II Inspection, checking of pipelines of emulsifier and hydrant system and assisting to shift operator in all activities at raw water pump house by recording the parameters of pumps, motors, diesel engine, valves and check
TTPS Mech II AHP Unit I II III Breakdown work in Ash Slurry Pump House equipments Overhauling of Ash slurry pump Seal water pump and Suction Delivery valves for the period from 01 04 2023 to 31 03 2024
NCTPSISEMII Circle AHP Dn Unit I OH Works 2025 26 Overhauling of various sizes of valves cleaning checking and rubber lining the ash water lines cleaning of ash water tank ash slurry sump etc in Ash Handling Pump House
MTPS I Mill Plant AC Plant Unit IV AOH 2023 24 Air Washer System Epoxy painting of blowers discharge duct and spray system Overhauling the AWCW Pump and gate valves Spray nozzles cleaning Flushing the spray system pipe line
TTPS Mech II AHP Unit V Attending breakdown maintenance of APH ECO hopper equipments sea water pipe line and valves in unit V for a period of work on or after 08 10 2020 and upto 31 03 2021
TTPS Mech II AHP Unit IV Attending breakdown maintenance of APH ECO hopper equipments sea water pipe line and valves in Unit IV for a period of work on or after 08 10 2019 and upto 31 03 2020
TTPS Mech II AHP Unit IV Attending breakdown maintenance of APH ECO hopper equipments sea water pipe line and valves in unit IV for a period of work on or after 08 04 2020 and upto 30 09 2020
TTPS Mech II AHP Unit V Attending breakdown maintenance of APH ECO hopper equipments sea water pipe line and valves in unit V for a period of work on or after 08 04 2020 and upto 30 09 2020
MTPSI CA Fire Protection Checking of Deluge valves Cleaning of spray nozzles in Emulsifyre System of GTs UATs MOTs COTs DOTs of Unit I to IV and ST I and II during Unit Annual Overhauling period of 2024 25
MTPS TM Unit III Removal of insulation and providing re insulation to pipe Lines valves Deaerator main flange Gland steam cooler Low-pressure heater Flash tanks and its accessories and disposal of waste insulation materials for Unit III AOH
WATER SUPPLY SCHEME 2026-27 Annual Maintenance and Repair for Pumping Main, Distribution Main Line (CI Pipes, PVC Pipes, AC Pipes, DI Pipes and Valves at ward No 18 to 33 in Cumbum Municipality. For the year 2026-2027
TTPS Operation Circle CAD CWPH II Unit V Annual Overhauling Inspection overhauling and commissioning of ROTORK make actuator of 1200 mm discharge butterfly valves of CWP 5C 5D in Unit V at CWPH II for the year 2021 22
TTPS Mech II AHP Unit V Attending breakdown maintenance of APH ECO hopper equipments sea water pipe line and valves in Unit V for a period of work on or after 08 10 2019 and upto 31 03 2020
Operation Circle O and E Division Fire Fighting Carrying out periodical preventive maintenance works in fire protection pumps Sluice valves of Hydrant and HVWS system for a period of 6 months from the date of handing over of site
Attending breakdown maintenance of valves, Overhauling gasket renewal of GateGlobe valves, Removal of insulation and providing new insulation to valves and pipe lines of Main Turbine, Pumps and its auxiliaries area for the period of six months 1
Please check the tender Documents carefully and quote your rates accordingly for the FLP - SUPPLY AND INSTALLATION OF PLC BASED ROBOTIC ARM FOR PLACEMENT OF SC VALVE AT MADURAI LPG PLANT . Overall GST on quoted rate should be 18% and in case of any deviations his/her bid will be disqualified.
10-M5118042004, 20-M5118040003, 30-M5146052001, 40-M5118040012, 50-M5148481007, 60-M5146052002, 70-M5148510001, 80-M5148510002, 90-M4948086075, 100-M5148500002, 110-M5118040025, 120- M5148481005, 130-M5146150001, 140-M5146150002, 150-M5148490000, 160-M5148490004, 170- M5146052003, 180-M5118040002, 190-M5118040023, 200-M5148481006, 210-M5118042001, 220- M5118040022, 230-M5148481004, 240-M5118042002, 250-M5144901001, 260-M5146052004, 270- M5118041005, 280-M5118042003, 290-M5118040026, 300-M5148481009, 310-M5118040024, 320- M5118042005, 330-M5118040013, 340-M9419356053, 350-M5118042011, 360-M5118040008, 370- M5118040027, 380-M5148481001, 390-M5148510003, 400-M5118040006, 410-M5118042006, 420- M5118041004, 430-M5148481008, 440-M5118040007, 450-M5118040009, 460-M5118040011, 470- M5118040001, 480-M5118040021, 490-M5148481002, 500-M5118042007, 510-M5118042010, 520- M5118040010, 530-M5118040020, 540-M5148481010, 550-M5148500001 Bid Number ( ) : GEM/2025/B/6066236 Dated : 20-03-2025 Bid Document 1/50
AS PER NIT
0930041 RETAINER BUFFER EDICON, 0930037 RETAINER EDICON, 0930021 PLUNGER PISTON EDICON, 0930025 VALVE BLOCK FRONT EDICON, 0930017 FLUTTER VALVE EDICON, 0930009 DOWEL PIN VALVE BLOCK EDICON, 0930013 VALVE BLOCK REAR EDICON, 0930029 RETAINER CLIP ... THROTTLE VALVE EDICON, ... THROTTLE VALVE EDICON, ... THROTTLE VALVE EDICON, ... THROTTLE VALVE EDICON
TGMCA Division Inspection and Overhauling of TDBFP Acontrol valve Main Turbine Blow down valve Ventilation Valve during AOHCOH 2025
25mm PVC Pipe 16kgf cm2, 32mm PVC Pipe 16kgf cm2, 63mm PVC Pipe 6 kgf cm2, 110mm PVC Pipe 10 kgf cm2, 50mm or 63mm UPVC Pipe Sch 40, 90mm PVC Pipe 6kgf cm2, 25mm PVC Elbow 10 kgf cm2, 25mm PVC 45 degree Show 10 kgf cm2, 25mm PVC TEE 10 kgf cm2, 25mm ... 32mmPVC Ball valve Paste ... PVC Ball valve Paste ... UPVC Ball valve , ... 110mm NRV Disc ...