Loading…
Loading…
15,768 results • Best match
Providing And Installation of Actuator operated Butterfly Valve and N.R.V. for River Bed Tube Wells and Allied Works at Head Works Site at Kendra Kotthamdihi Piped Water Supply Scheme, Block Pandabeswar, Dist. Paschim Bardhaman.
Rectification of Raw water pump (VT) cooling line, Motorised Butterfly Valve and others Mechanical works at Intake Kukrakuri of Saltora Chatna Block BRGF (Phase -I) water supply scheme under Bankura Mechanical Division,P.H.E. Dte.
Supply of 03 nos. of 10 inch dead weight PV Valves with silica gel trap at Durgapur Terminal
Syphone PVC, Fancy type bar curtain, Glass pane plain, Glass pane plain of sizes 3, M Glass plain of sizes 3mm thick, Glass pane of sizes 51cm, Oil putty, Brass spindle for bip cock, Waste coupling CP, CP Waste coupling, PVC waste coupling, Nails ... Fly Valve , ... PPR Gate valve 25mm, ... PPR Gate valve 32mm, ... PPR Gate valve 50mm, ... PPR Gate Valve Dia, ... PPR Gate Valve , ... PPR Gate Valve Pipes, ...
Repair and Overhauling Service - MAIN SUPPLY VALVE FROM FIRE AND GS PUMP AT AFT ENGINE ROOM NOT HOLDING VALVE TO BE OVERHAULED AND PROVED FOR SATISFACTORY OPERATION; MAIN SUPPLY VALVE FROM FIRE AND GS PUMP AT AFT ENGINE ROOM NOT HOLDING VALVE TO BE O..
SET OF STRAINERS FOR PNEUMATIC VALVE'S COMPRISING OF 1) FOR C2 & A9 VALVE, PT.1 = 3 NOS. 2) FOR HS4 VALVE, PT.2 = 1 NO. 3) FOR A9 & SA9 VALVE, PT.3 = 2 NOS. 4) FOR SAFETY VALVE, PT.4 = 1 NO. TO CEE'S
O/H KIT FOR 3/4" SAFETY VALVE CONSISTING OF 3 ITEMS 1. VALVE-1 NO. SIMILAR TO RECON PAMP NO. A107-REF.10. 2. VALVE STEM-1 NO SIMILAR TO RECON PAMP NO.A108-REF.8. 3.VALVE SPRING 1 NO. SIMILAR TO RECON
SET OF STRAINERS FOR PNEUMATIC VALVE'S COMPRISING OF 1) FOR C2 & A9 VALVE, PT.1 = 3 NOS. 2) FOR HS4 VALVE, PT.2 = 1 NO. 3) FOR A9 & SA9 VALVE, PT.3 = 2 NOS. 4) FOR SAFETY VALVE, PT.4 = 1 NO. TO CEE'S
SET OF STRAINERS FOR PNEUMATIC VALVE'S COMPRISING OF 1) FOR C2 & A9 VALVE, PT.1 = 3 NOS. 2) FOR HS4 VALVE, PT.2 = 1 NO. 3) FOR A9 & SA9 VALVE, PT.3 = 2 NOS. 4) FOR SAFETY VALVE, PT.4 = 1 NO. TO CEE'S
SET OF STRAINERS FOR PNEUMATIC VALVE'S COMPRISING OF 1) FOR C2 & A9 VALVE, PT.1 = 3 NOS. 2) FOR HS4 VALVE, PT.2 = 1 NO. 3) FOR A9 & SA9 VALVE, PT.3 = 2 NOS. 4) FOR SAFETY VALVE, PT.4 = 1 NO. TO CEE'S
Supply and delivery of different dia. CIDF Pipes, Sluice valve and fittings for construction of RCC OHR _450 cum capacity_ for Siali W.S. Scheme under Burdwan Division_ P.H.E. Dte.
Daily Operation mtc. of rising main distribution system, sluice valve, street stand post etc. for Ramnagar W/S Scheme of Purulia Sadar Sub-Division, Under Purulia Division, P.H.E. Dte.
SUPPLY AND INSTALLATION OF 450 MM DIA SLUICE VALVE ON RECIRCULATION PIPELINE OF 1400 MM DIA MS CLEAR WATER DELIVERY MANIFOLD BESIDE CWPH-2 OF JAI HIND JAL PRAKALPA.
Daily Operation and mtc.of all rising main and entire distribution system Sluice Valve, Street Stand Post etc. under Khudagara W/S Scheme under Purulia Sadar Sub-Division, P.H.E. Dte.
Additional laying of HDPE pipeline with Repairing FHTC and installation of Sluice Valve at Khosalpur PWSS of Amta-I Block in Uluberia Sub-Division, under Howrah Division P.H.E. Dte.
Supply of Plumbing Helper for daily operation of 2 nos. 200 mm. dia Sluice Valve at Dashodrone School Math within Ward - 05 under Bidhannagar Municipal Corporation (For One Year)
Withdrawing Reinstalling of sluice valve of different dia. of Ranghat Piped Water Supply Scheme at Chanchal-II Dev. Block, under Malda Division, P.H.E. Dte. in the District of Malda.
Half-Yearly comprehensive maintenance of electrical installation at common service, administrative office and Guest house incl pump operator cum sluice valve operator at Haldia Industrial Park, District Purba Midnapore
Special repairing work of distribution system, sluice valve of MOUGRAM ZONE-I Piped water Supply Scheme under Ketugram-II Block, under Katwa Sub-Division within Burdwan Division PHE Dte
Supply and delivery of different dia. CIDF Pipes, Sluice valve and fittings for construction of RCC OHR _450 cum capacity_ for Balarampur W.S. Scheme under Burdwan Division_ P.H.E. Dte.
Installation of new 750 mm dia Sluice Valve near the junction of Ananta Dev Mukherjee and Kashinath Chatterjee Lane with other allied works under ward no 33 of HMC.
Operation of different dia sluice valve at different points for distribution of water from different ESR and UGR at Bally Municipality area for a period of 1(one) year.
Supply and delivery of different dia. CIDF Pipes_ Sluice valve and fittings for construction of RCC OHR _350 cum capacity_ for Kanshra W.S. Scheme under Burdwan Division_ P.H.E. Dte.
Daily Operation AND Mtc. of Distribution system, sluice valve, community stand post under Arra W/S Scheme under Raghunathpur Sub-Division, P.H.E. Dte. (Zone-III) (w.e.f. 01.09.2024 to 31.08.2025)
Daily Operation mtc. of rising main distribution system, sluice valve, street stand post / community stand post etc. under Barabazar W/S Scheme under Purulia Sadar Sub-Division, P.H.E. Dte.
Operation and Maintenance of sluice valve to regulate and monitoring the flow of water of 6 (six) nos ESR, primary and Distribution grid in different locations of Bhadreswar Municipality.
Supply of Plumbing Helper for daily operation of 2 nos. 200 mm. dia Sluice Valve at Dashodrone School Math within Ward - 05 under Bidhannagar Municipal Corporation (For One Year)
Repairing and Overhauling of 50 LPS capacity pump and 150 mm dia. sluice valve for unit no. B at Buroshibtala LS-1 under Kudghat Unit/S and D department.
Repairing of Baffle wall flocculator, Sluice Valve and Flash Mixer with allied works at Gour Mahadipur WTP in Englishbazar Block under Malda Arsenic Area Water Supply Division, PHE Dte.
Supply and delivery of different dia. CIDF Pipes_ Sluice valve and fittings for construction of RCC OHR _300 cum capacity_ for Kenna W.S. Scheme under Burdwan Division_ P.H.E. Dte.
Trial Run of Panradda Zone-6 (Except Electro Mechanical Component) of all distribution system, sluice valve ,FHTC etc under Purulia Division ,P.H.E Dte(For the Period of 90 days)
Daily Operation and Mtc. of Distribution system, sluice valve, community stand post under Arrah W/S Scheme under Raghunathpur Sub-Division, P.H.E. Dte. (Zone-III)(w.e.f. 01.09.2025 to 31.08.2026)
MS Pipe line inter connection between Submersible pump to OHR and construction of sluice valve chamber of Puncha and adjoining Mouzas Water Supply Scheme (Zone-A,B and C)
Daily Operation mtc. of rising main distribution system, sluice valve, Street stand post etc. Baghmundi W/S Scheme under Purulia Sadar Sub-Division, P.H.E. Dte. (w.e.f.01.09.2019 to 31.08.2020).
Construction of Household Tap Platform at different household, Construction of Sluice Valve Chamber, fitting fixing supplying different dia specials etc. for Augmentation of Dhaspara W/S Scheme, Block - Sagar
Daily Operation and Mtc. of Distribution system, sluice valve, community stand post under Arra W/S Scheme under Raghunathpur Sub-Division, P.H.E. Dte. (Zone III) (w.e.f. 01.09.2023 to 31.08.2024)
Supply and delivery of different dia. CIDF Pipes_ Sluice valve and fittings for construction of RCC OHR _300 cum capacity_ for Itla W.S. Scheme under Burdwan Division_ P.H.E. Dte.
Daily Operation and Mtc. of Distribution system, sluice valve, community stand post under Arrah W/S Scheme under Raghunathpur Sub-Division, P.H.E. Dte. (Zone-II) (w.e.f. 01.09.2025 to 31.08.2026)
SUPPLY AND FITTING, FIXING OF NEW SPINDLE, GM NUT AND OTHER ALLIED COMPONENTS AT THE SUCTION SIDE SLUICE VALVE OF PUMP NO.-3 AT RWPS PH-III OF GRWW.
RENOVATION WITH REPLACEMENT OF DEFECTIVE SPARE PARTS OF 700MM DIA ACTUATOR OPERATED RISING TYPE DELIVERY SLUICE VALVE OF PUMP UNIT NO. 2 WITH ALLIED WORKS AT CWPS-III, GRWW.
MAINTENANCE OF SERVICE MAIN BY FIXING OF LEAKAGES, SLUICE VALVE AT B.C.ROY ROAD NEAR JAYASHREE PARK AND OTHER PLACES WITH ALLIED WORKS IN WARD NO-121 UNDER BR XIV.
Construction of Sluice Valve Chamber and protection of pipe line work at Augmentation of Harbhangi W/S Scheme, Block-Basanti under Canning Sub-Division of Alipore Division, P.H.E. Dte.
Augmentation of 450mm sluice valve for increasing water pressure of main at M B Road, Birati near mini bus stand at Ward No 18 under North Dum Dum Municipality.
CUTTING MACHINE, TORR ROD, DISC, DIA 355MM, CHAIN, Sluice Valve, Flange, GREASE GUN, 5KG, HND OPRTD, HOSE, RBR, 150MM, DBL ARMRD, FLNGD BTH END, HOSE NYLON, BIT TWST, HSS
DISMANTLING, REPAIRING, INSTALLATION AND COMMISSIONING OF 700 MM DIAMETER PNEUMATICALLY OPERATED SLUICE VALVE WITH ALLIED WORKS FOR BACK WASH OPERATION OF FILTER BED NO-6 UNDER WTP-II,GRWW.
Daily Operation and mtc. of rising main and distribution system, sluice valve, street stand post etc. under Bandwan Spot W/S Scheme under Purulia Sadar Sub-Division, P.H.E. Dte.
Daily Operation and Mtc. of Distribution system, sluice valve, community stand post under Arra W/S Scheme under Raghunathpur Sub-Division, P.H.E. Dte. (Zone II) (w.e.f. 01.09.2023 to 31.08.2024)
Daily Operation mtc. of rising main distribution system, sluice valve, street stand post of Mohara area (Zone-I) under Bongabari WS Scheme under Purulia Sadar Sub-Division, P.H.E. Dte
Daily Operation mtc. of rising main distribution system, sluice valve, Street stand post at Ajodhya W/S Scheme under Purulia Sadar Sub-Division, P.H.E. Dte.. (w.e.f.01.09.2019 to 31.08.2020)
Daily Operation and Mtc. of Distribution system, sluice valve, community stand post under Arra W/S Scheme under Raghunathpur Sub-Division, P.H.E. Dte. (Zone-II) (w.e.f. 01.09.2024 to 31.08.2025)