Loading…
Loading…
1,416 results • Best match
Replacement of damaged 100mm dia AC/RCC/CI line with 100mm dia DI line from H.No.20-5-406 to 20-5-437 at Faridia Masjid Shakkergunj under Misrigunj section 2)Replacement of damaged 150mm dia CI s/v with new 150mm dia DI valve at H.No.20-5-333 ... at20-7-97 Godown Ki ...
Amangal Municipality-Infrastructure Developmental works in ULBs with NAGARABIVRUDHI Assistance-1) Laying of Internal CC Roads at Chandrayanapally and Vittaipally at ward no.01 in Amangal Municipality 2)Laying of Internal CC Roads at Murthujapally at ... and Cold storage back ...
Malathion 50 % EC as per IS 2567 (Q3)
Malathion Emulsifiable Concentrates (V2) Conforming To IS 2567 (Q2) ( ( 3 3 ))
Infrastructure Developmental works in ULBs with NAGARABHIVRUDHI Assistance-1) Construction of Storm water drains at Various localities in Ward No.01and10 in Amangal Municipality 2) Construction of Storm water drains at Various localities in Ward ... and Cold storage back ...
Aluminium Phosphide Formulation as per IS : 6438 (Q3)
Handling and Transport on Lumpsum Basis - Handling Service, Transport Service, AMC ADILABAD HIRED, Handling & Transport Service
Laying of CC Road from Hyderabad main road to KVS Function Hall, CC Road and CC Drain in Suncity Colony, CC Road and CC Drain in Kalalwadi, Jualiwada, Bakaramwada in ward No.9 and 10, CC Road and CC Drain in Arya Nagar in ward No.11, CC road from ... Gas Godown to ...
Sanitary Napkins (Q2) (3 (3 ))
Assets Insurance Service - Insurance For Factory Fire For FY 2024 25 From 01 04 2024 000 Hrs To 31 03 2025 2400 Hrs As per Scope of work; As per scope of work; Optional, Marine and Transit Insurance Service - Marine Insurance for all the transits on ... on WareHouse to ...
Bamboo Mat Board For General Purposes-IS:13958 (Q3)
Entry and Mid Level Desktop Computer (Q2) (3 (3 ))
Customized AMC/CMC for Pre-owned Products - PMS; PMS; Comprehensive Maintenance Contract (CMC); Monthly; Yes
Cross Laminated Thermoplastic Fumigation (CLTF) Covers (Q3) ( ( 3 3 )) OEM Average Turnover (Last 3 Years) 75 Lakh (s) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required ... Central Warehousing Corporation ... Office, Warehousing Sadan, ...
Condenser Blade, 4 MFD capacitor, Samsung timer, White Wrapping Tape, Teflon Tapes, Cello Tape 2 Black, Cotton waste, Danfoss relay set 20 Deep Freezer, 80 by 100 mfd Capacitor, minus 20 Deep Freezer square type, Pin Remover Charging, Thermostat ... Inches, Cold room evaporator ... for cold room , ...
Manpower Outsourcing Services - Minimum wage - Unskilled; Not Required; Others