Loading…
Loading…
4,030 results • Best match
Installation of Hanger structure shed Godown
Construction of Oil Mill with Godown
Construction of 100 M.T storage godown
Insurance of Zonal Godown, Purba Bardhaman
Installation of HAnger Structure shed Godown
Construction of NTB godown Bhangore North
Installation of Hanger structure shed Godown
INSTALLATION OF SOLAR SYSTEM AT GODOWN
Insurance of Zonal godown, Purba Bardhaman
Construction of Godown for establishment of Broiler Integration Programme facilities along with Electrical works within the campus of the State Animal Health Centre, Ashokenagar, North 24 Pargonas-743222 under WBLDCL during the year 2024-2025
Renovation of RNPD office bldg, Raghunathpur CCC office building, store office godown, boundary wall and extension of aluminum cubicle at Raghunathpur CCC office, Surrounding area, drain renovation and tit-bit civil work under Raghunathpur Division.
Supply of Vehicle for transportation of Poultry Feed from Godown at Salboni,Paschim Medinipur to different FARMS under Broiler Integration,Medinipur Unit at Ashokenagar for ready birds transportation from Broiler Integration Farms to Outlet Midnapur.
Carrying cum transportation of ICDS foodstuff and materials from Andal ICDS project godown to different Anganwadi centres of Andal ICDS project in Andal Block for a period of one year from the date of executi
Construction of A.I. Kit Bank, Repairing of Existing feed Godown and Semen Processing Laboratory building along with allied works including Internal and External Electrification work at Sperm Station Beldanga, Murshidabad under Paschim Banga Go-Sam
Carrying cum transportation of ICDS foodstuff and materials from Salanpur ICDS project godown to different Anganwadi centres of Salanpur ICDS project in Salanpur block for a period of one year from the date of execution
Development of Godown for Storage of Feed Ingredients at Kalyani , Nadia -741235 and Matigara, Siliguri, Darjeeling-734003 under West Bengal Livestock Development Corporation Limited, LB-2, Sector-III, Salt Lake, Kolkata-700106 for 2023-24.
Supply, Laying and fixing of newly supplied electrical materials at Godown no 7 of O and M Store, KTPS for new Wiring with dismantling of all existing old conduit wiring and fittings, switch boards etc
REPAIR, RENOVATION OF EXISTING MACHINE ROOM AND GODOWN, OFFICE BUILDING and NEW CONSTRUCTION OF ELECTRICAL SUB-STATION,TOILET BLOCK, CANTEEN WITH REST ROOM, EXTENSION OF CONCRETE ROAD ETC. AT SILIGURI FEED PLANT, Post-Prodhannagar, SILIGURI
Supply of Small Vehicle for transportation Feed from Godown to different FARMS of Broiler Integration Programme in different units within West Bengal under West Bengal Livestock Development Corporation Limited during the Financial Year 2025-2026
Construction of approach road and allied civil works at Medinipur Feed Godown , Medinipur , Paschim Medinipur, PIN-721101 under West Bengal Livestock Development Corporation Limited, LB-2, Sector-III, Salt Lake, Kolkata-700106 for 2023-24
Construction of Single Stored Godown cum Office Building of Karanda S.K.U.S. Ltd., Vill. and P.O-Karanda, Mouza Karanda, JL No-103, Plot No-3580 and 3676-Monteswar Purba Bardhaman, 2nd Call, Fund- RKVY 2019-20
Construction of pucca drain from Angargoria main road to Maldiha Primary school near Benfed Godown, JL No. 143, Dag- 920, Mouza - Angargoria, Angargoria G.P of Md Bazar P.S under fund 15th CFC (TIED), 2022-23.
Carrying cum transportation of ICDS foodstuff and materials from Pandabeswar ICDS project godown to different Anganwadi centres of Pandabeswar ICDS project in Pandabeswar Block for a period of one year from the date of executi
Supply of Vehicle for transportation of Poultry Feed from Godown to different FARMS under Broiler Integration Programme, North Bengal Unit at Phansidewa, Darjeeling under West Bengal Livestock Development Corporation Limited for the F.Y. 2024-2025
INSTALLATION OF SOLAR STREET LIGHT IN FRONT OF H_O HAZARI BISWAS, NARAYAN PRAMANICK GODOWN, CHAMPA GHOSH, NEMAI MONDAL AT JATRAPUR UNDER DOGACHHI GP UNDER KRISHNAGAR I BLOCK UNDER APAS 25_26 (ID_ APAS_01_083_252_0012) Sl. No. 64
Installation of tubewell near Sattar Molla Godown at Mouza-Shirakole, Dag-1325, JL-04 under Shirakole G.P, Magrahat-I Panchayat Samity, Usthi, South 24 Pgs under 15th F.C Fund, (Tied Grant- 2023-24). Id-68410375.
SOIL TESTING WORK OF 1000MT GODOWNS AT CHANCHAL IN THE DISTRICT OF MALDA.
HANDLING AND TRANSPORTATION OF FOOD GRAINS AND ALLIED SERVICES AT CHAPADANGA GOVT. GODOWNS
Special Repairing Work affected by flood within 5 Years Maintenance Work from L034-NH 31 AT JALDHAKA COLD STORAGE TO STATION PARA AT PAR KUMLAI Package No WB10131, Block Dhupguri under Jalpaiguri District
Construction of 3 (three) Nos. Warehouse and Connecting Road by the side of Eastern by-pass within Siliguri Municipal Corporation. Part-II Warehouse - B and C Civil Sanitary work.
SITC of 250KVA silent D.G. set for emergency power supply with allied E.I. work at Cold chain and WIC in the Campus of CMOH Office Building, Burdwan-------Instalation, Testing and Commissioning of 250 KVA Silent type Diesel Generator .
Construction of New Godown Shed and Demolition of Old godown at Tinkonia In Ward No 7 Under Burdwan Municipality.
Additional works for RIDF godown at Basirhat Unit-I,Dist- North 24 Parganas. to be converted to PEG godown.
Supply Installation Testing and Commissioning of Walk-in Cooler (Make- Blue Star) for Cold Room of Seventh Floor, VRDL Section, Zone-3, Academic Building at Malda Medical College and Hospital.
As per BOQ
As per BOQ
As per BOQ
As per BOQ
REPAIRING AND RENOVATION OF NEW JALPAIGURI WAREHOUSE IN THE DISTRICT OF JALPAIGURI.
Construction of Fish MIll shed and warehouse with Office at Rudranagar, Sagar
Internal electrification of Warehouse at Malda Silk Park (Site1), Malda. (2nd Call)
Repairing work of godown with outside plastering, painting and repairing G.C.I roofing at Omarpur Stackyard under Jangipur Sub-Division (PWD) within Berhampore Division No-I (PWD) in the district of Murshidabad during the year 2024-25.
Construction of Godown by Light Weight Roofing at West Side on the Second Floor of Bhagwanpur-I Block Office at Kaptyabari Mouza under Kajlagarh GP under Bhagwanpur-I Panchayat Samity. Under 5th SFC FY 2024-25.
Supply of Vehicle for transportation of poultry Feed from Godown at Veterinary Polyclinic (ARD Office) campus to different FARMS under Contract Broiler Farm, Berhampore Unit at Veterinary Polyclinic (ARD Office) campus, Old Kandi Bus Stand,Berhampore
Supply of Small Vehicle for transportation Feed from Godown to different FARMS of Broiler Integration Programme in Berhampore and Hooghly within West Bengal under West Bengal Livestock Development Corporation Limited during the Financial Year 2025-26
Supply of fabrication and erection of pre fabricated canopy installation of fascia shutter with chain system and fitting and fixing municipal logo beside FCI godown Garbage collecting point in Gope college road in ward no 25
Construction of Store cum Godown including Sanitary Plumbing Electrification for Hanskhali (A-I) Sub-Division at 320N Hanskhali-II DTW Centre of Hanskhali (A-I) Sub-Division under the jurisdiction of Krishnagar -II (A-I) Division.
Construction of Godown for establishment of Broiler Integration Programme facilities along with Electrical works within the campus of old office of the Deputy Director, ARD and PO, Coochbehar- 736101 under WBLDCL during the year 2024-2025.
Construction of Extension Govt. Office Building (Panchayat Samity Section) in First Floor over Existing R.W.S. Godown at Old Malda Block Campus under Old Malda Dev. Block, Malda out of Fund 15TH CFC 2020-2021 (1St INSTALLMENT ).
REPARING OF BATHROOM ,JALCHADand GODOWN MEJHE PLUSTER AT NERODIGHI PRIMARY SCHOOL UNDER RAYAN-I GP BOOTH NO 182 CONSTRUCTION OF PAKKA DRAIN BESIDE NERODIGHI PRIMARY SCHOOL UNDER RAYAN-I GP BOOTH NO 182 CONSTRUCTION OF SHADE