Loading…
Loading…
2,279 live1,296 closing this weekmost from Directorate of Local Bodies UP and Rural Development and Panchayat Raj Department
2,279 results • Best match
Drilling tubewell at Payarka, Makhana & SIT & C of Pump-sets along with all Electro-mechanical Accessories at Kanpar SHW And PSLL & J 90mm Dia 6kg/cm2 PVC Pipeline For Makhana and Payarka, Providing and Supplying of Pump Cabin at, Makhana, Payarka and Vyara And Electrification at different location for Bhuj part-2 RWSS under M & R Programme 2026-27
Comprehensive Overhauling of Existing Jyoti Make 1000 VM Vertical Turbine Pump by Dismantling, Manufacturing, Supplying and Replacing Worn-Out/Defective Pump Components including Bell Mouth/Bowl and Suction Strainer, Line Shafts with Shaft Sleeves, ... Jalundra-Madhavgadh Pipeline Project
Work of providing and laying 300mmdia RCC NP3 class pipeline in place of damaged/silted 150/175mmdia SW line linking to 300mmdia RCC line with construction of new manholes at 12th Main, 12th A Main, 12th B Main, 13th Main, I Cross A Cross coming under HAL service station of AEE C-2-2 sub division
Providing, Supplying, Lowering, Laying and Jointing of 90 mm & 110 mm Dia. PVC Pipeline at Various Site, Construction of Pump Cabin at various site & RCC U/G 2.00 Lac Liter Capacity Sump at Lakhapar and Providing and Lowering of Pumping Machinery at Lakhapar New Sump, Ta.- Lakhpat, Dist.- Kachchh Under Lakhpat RWSS M & R Programme 2026-27
Prebid meeting will be conducted online on 22-09-2026 11:00 AM through MS Teams meeting, kindly use following details: https://teams.microsoft.com/meet/446503506451819?p=xKsSEzxK7VtsdKX51o Kindly quote above or below (%) percentage over the published Rate by BPCL. GST@18% will be loaded by BPCL.
AS PER BOQ AND TENDER DOCUMENTS
please refer tender documents
Potable Water Supply Pipe Laying and Interconnection Work At S B Roychowdhury Road Opposite To Kali Mandir Ward No 08,Nrayanpally School Road Near Durga Mandap Ward No 23 an Bisharpara Nabajiban Near Kali Mandir Ward No 01 Under North Dum Dum Municip
Restoration of damaged Hard Shoulder Flank Black Top, caused due to pipe laying by PHE Department along Baraduary-Bindol road from 7.30 km to 11.10 km, Protection work at Bridge Approaches of 15th and 17th km and Repairing of Damage Concrete Railing
Construction of Swg drainage pipe line and cc road from H.no 3-4-210 to H.no 3-4-199 and in various places in Division no 65 of Municipal Corporation Karimnagar Est. cost of Rs. 10.00 Lakhs under MGF (1st Recall)
Installation of different diameter sluice valves and other allied works to regulate and controlling the flow of water in the pipe line network of secondary grid for Joynagar-II Block under South-24 Pgns W/S Divn-I, PHE Dte.
Sinking of 200mm (all through) Big dia. Tube Well of 170 Mtr. Deep , Construction of Pump House, Interconnection and Laying of Dedicated/Parallel Pipe Line for improvement of FHTC functionality for FATEPUR Water Supply Scheme at Gazole Block of Malda
Sinking of Big Dia. Tube well, Inter connection beteween TW Existing Pipe line, Construction of Pump House of BETAHAL Piped Water Supply Scheme at Harishchandrapur-II Block of Malda District under Malda Division, PHE Dte, Govt. of West Bengal. (2nd
Proddatur Municipality - Laying of 110mm dia HDPE pipe line from D No 4/354/1 to D No 4/348/1 & D No 4/460/1 to D No 4/452/1 at backside of Nehru street at 41st Election ward
Laying of RCC Pipe line and CC road from plot no 143 and other Internal lines in Sai Krish Enclave Phase-I, Yapral ward no-189 in Keesara Circle 1, Malkajgiri Zone,MMC (Reserved for SC only)(Item no.17)
Estimate for Repair and reconstruction of various damaged roads due to the crossing of RCC Pipeline and Canals.
Relaying of Pipeline and Refixing of FHTC alongside Irrigation Bundh under PALASHPAI PWSS under ARAMBAGH Block, District- Hooghly
SUPPLYING AND LAYING OF 300 MM DIAMETER MS FW PIPELINE FROM GOPAL GHOSH ROAD UPTO WATTGUNGE TREATMENT PLANT
Remaining Work of Providing, supplying, lowering, laying and jointing DI/ PVC pipeline, Hydraulic testing of laded pipeline, RCC ESR/ , Stand post, electro mechanical works and Electrification etc. including O&M of Proposed and Existing work for 24 Monthsegional Water Supply Scheme (Package-3) District : Chhotaudepur
Relaying of pipeline at Ajaypur village of Kanpur Water Supply Scheme Under Arambagh Sub-Division under Hooghly Division,P.H.EDte .
Relaying of pipeline damaged due to construction of drain by Tehatta Gram Panchayat at Tehatta Mouza of Tehatta PWSS
Laying of HDPE Pipeline & CC Road from Mediga Nagaraju House to Samuel House in SC Colony of Jammalamadugu Municipality
Laying of HDPE Pipeline & CC Road from Mediga Nagaraju House to Samuel House in SC Colony of Jammalamadugu Municipality
Design, Supply, Installation and Commissioning of 4 Nos. of Prefabricated Buildings at Kochi Salem LPG Pipeline Tamil Nadu Section
Laying of PE Pipeline Network, Last Mile Connectivity(LMC) and DMA works for PNG Connections in Bokaro GA(Jharkhand)
Laying of PE Pipeline Network, Last Mile Connectivity(LMC) and DMA works for PNG Connections in Purnea GA(Bihar)
Relaying of pipeline at Chandchak village of Kanpur Water Supply Scheme Under Arambagh Sub-Division under Hooghly Division,P.H.EDte .
Relaying of pipeline at Sonagachi village of Kanpur Water Supply Scheme Under Arambagh Sub-Division under Hooghly Division, P.H.EDte .
Relaying of pipeline at Krishnabati village of Kanpur Water Supply Scheme Under Arambagh Sub-Division under Hooghly Division, P.H.EDte .
Sw - Supply of unskilled labour for Wheel valve Operation and Maintenance of water supply pipelines network as and when required under Sub Division III, Kalara, CD, APWD Diglipur. Period from October 2026 to April 2027
CONSTRUCTION AND INSTALLATION OF SUBMERSIBLE PUMP AND WATER COOLER MACHINE WITH PIPE LINE FOR CONNECTION OF OVER HEAD TANK TO TAP AND COOL AND SAFE DRINKING WATER AT RAYAN BARASAT PARA AT RAYAN SAMSAD SAMSAD XI OUT OF 15TH FC TIED 2025 26
ESTIMATE FOR SHIFTING OF DI DISTRIBUTION OF PIPE LINE ALONG ARAMBAGH-TIROL ROAD FROM ARAMBAGH RAIL GATE TO GOLPUKUR MORE,PO,PS ARAMBAGH,DIST HOOGHLY,DUE TO CONSTRUCTION OF BOX CULVERT ON ARAMBAGH TIROL ROAD, IN WARD NO.-7,9,10, UNDER ARAMBAGH MUNICIP
Annual Maintenance work of D.I. Pipe Line i/c Specials Submersible motor pump, Starter at Industrials area Sirgitti, Tifra, Silpahri, selar Bilaspur, Kapan, Jangir-Champa, Rajgamarg road Korba, Anjani Pendera Road, Gangapur Khurd, Ambikapur, Nayanpur- Girvarganj Surajpur, Siyarpali Raigarh & Khamhariya Mungeli (C.G.)
PROVIDING AND LAYING WATER SUPPLY PIPE LINE 100 MM (DI) K-7 and 150MM, 200MM, 250MM (DI) K-9 PIPE INCLUDING DRILLING OF TUBEWELLS, CONSTRUTION OF 2 NO. U.G.T. AND PUMPING MACHINERY FOR FIROJPUR JHIRKA TOWN, DISTRICT NUH, HARYANA (UNDER AMRUT 2.0)
PROVIDING AND LAYING WATER SUPPLY PIPE LINE 100 MM (DI) K-7 and 150MM, 200MM and 250MM (DI) K-9 PIPE INCLUDING DRILLING OF TUBEWELLS, CONSTRUTION OF 4 NO. U.G.T. AND PUMPING MACHINERY FOR NUH TOWN, DISTRICT NUH, HARYANA (UNDER AMRUT 2.0)
Custom Bid for Services - Non comprehensive AMC of Coriant SDH installed along Natural Gas Auraiya Phulpur Pipeline FOR WHICH BIDDER HAVE TO QUOTE TOTAL AMOUNT FOR ALL QUANTITIES INCLUSIVE OF ALL CHARGES TAXES AND DUTIES Similar Category MULTI-PROTOCOL LABEL SWITCHING SERVICE(MPLS SERVICE) Customized AMC/CMC for Pre-owned Products Operation & Maintenance of Data Centre Assets Repair, Maintenance and Installation of Plant Systems/Equipments
TN 04 - 01 /2026-27 Extension of Pipeline from Boothanatham Anchaneyar Kovil near Existing Borewell to OHT H/O Boothanatham)
Restoration of MS pipeline in AJI-4 Dam river Section at sampar village Under Morbi-Maliya-Jodiya RWSS M & R
Laying of PE Pipeline Network, Last Mile Connectivity (LMC) and DMA works for PNG connections in Coimbatore GA (Tamil Nadu)
Relaying of pipeline at Kanpur village of Kanpur Water Supply Scheme Under Arambagh Sub-Division under Hooghly Division,P.H.E. Dte.
Relaying of pipeline at Madanpur village of Tantisal Water Supply Scheme Under Arambagh Sub-Division under Hooghly Division,P.H.E. Dte .
Custom Bid for Services - Hiring of services for preparing and updating various Surface plans, Key Plans and detailed layout plans of all pipelines and power cables for Surface Installations at Rajahmundry Similar Category GIS related Survey Services
Custom Bid for Services - Painting work of Oxygen Gas, Natural Gas and Compressed Air pipelines inside the Foundry and Forge area at HEEP, BHEL Haridwar Similar Category Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2)
Road restoration work for laying of DI and HDPE Pipe line for water supply scheme of PHED on Dumdum - Lauhati Road from 7.50 km.(Anjana Sofa Center) to 8.50 km (Lotus Hospital) under Barasat Highway Division No. - I in the District of North 24 Parga
Replacement of the damaged insulation over FG Ducts, steam pipe line, around boiler Ist & II nd pass & Replacement of Refractory at various locations of Boiler of Unit-I & II as and when required for the period from 01.10.2026 to 31.03.2027 including in Annual Overhauling works.
Providing New Sintex and 2HP Motor at Irular Paguthi, Providing Pipeline Main Road New OHT to Old OHT in Kurur Panchayat
Providing Pipeline Connection between Tank Karuru Schemes OHT to Existing Distribution System at Krishnapuram,Bharathinagar, Anandhapuram, Ammankovil kudiyiruppu at Alagankulam Panchayat
Laying of 110mm dia GI pipeline from TGP gate to Shiva temple in ward no 23 in Srikalahasti municipality(10th Call)
Extention of Pipeline at Ward No 1 Teachers Nagar, Dharmapuri Main Road and Ward 10 Sevvai Sandhai in Omalur Town Panchayat
Installation of damaged copper pipeline of AC machines of TTI, Grouping Labs and other 2 nos. rooms of IBTM IH, Maniktala