Providing 110mm dia HDPE pipe line from Vavilala Samstha Grandalayam towards north up to Donka Road (east side) at Arundalpeta 3rd cross road in Div. No.45 under AE-6 Section
Providing 200 mm dia HDPE pipe line from GB Complex to BN Talkies back side in ward No.28 in Adoni Municipality under 15th Fc TIED Grants 2020-21(4th Call)
Providing 110mm dia HDPE pipe line from Sri Satti Srinivas house D No 6-1-6/1 to Sri Pinisetti Apparao huose D No. 6-1-5/5 in 9th ward
Replacement and shifting of various 100mm dia G.I distribution Pipe Line passing across the culverts and drains Avoid Contamination at Maddilapalem (Big Well) in Wards No.23 Under A.E - 15 Section.
Providing HDPE water supply distribution pipe line in Dharmapuri Colony Main Road to Kalyanapuri Colony 5th Line Shaik Vali House in 1st ward of Vinukonda Municipality. (Under 15th Finance Commission Grant)
Replacement of 110mm and 160 MM Dia HDPE pipe line From D No.1-2-1 H/o D Durga Bhavani to KNF Road in Govvalavari street, Ravulacheruvu at 30th ward
PROVIDING 110MM DIA HDPE PIPE LINE INTERCONNECTION AND TAP SHIFTINGS TO EXISTING LINE IN MEDARIVARI STREET AND CHANDAMAMA HOSPITAL ROAD ALONG CINEMA ROAD FOR IMPROVEMENT OF WATER SUPPLY IN 33RD DIVISION.
Punganur Municipality -General funds -Laying of 110 mm dia PVC pipe line from D.No:31-1/18-2 to D.No:31-1/2-3 at Hidayath Nagar in ward No:01
Construction of Retaining Wall, Relaying of 200 mm dia UGD Sewer pipe Line and Providing CC Road to Attuluri Paramatma street hill area Mogalrajpuram in 7th division.1st Call General Funds
Providing 1200mm Dia RCC Pipe line to East side and West side of RUB for Diversion of Katcha Drain obstructing the alignment of proposed RUB at Vambay Colony in 60th Division
Proddatur Municipality - Laying of 110 mm dia HDPE Pipe line from D No 6/257 to 6/269 in Arts College Road in 33rd Election ward (Opp Devanga Kalyana Mandapam Street)
Providing G I Pipe line from D NO 4 45 3 in Lalitha nagar street to Bharathi chattu house D no 3 46 1 in ward no 8 in kondapalli municipality
Providing 110mm dia HDPE Pipe line and Shifting of House tap connections to Sarada colony 6th,8th,10th,12th,13th lines (South Side) In Div No.50 under AE-6 Section.
General Funds 2023-24 Providing 110mm Dia HDPE Pipe line at Shashank Goyal Colony to Bhanu Prasad Colony Main Road and Cross Road in Div No.21 Under AE-4 Section.
REPAIRS OF EXISTING OLD SANITARY PIE LINE REMOVAL AND REFIXING OF NEW PIPE LINE TO T.B. HOSPITAL BACKSIDE COMMUNITY TOILETS IN VENKATESWARA COLONY AND YATIGATTU TOILETS IN 37TH DIVISION. (RECALL-2)
Providing H.D.P.E. Water Supply Distribution Pipe line from Sitharama Nagar near Kanaka Durga Nagar Main Road in 3rd Division. (AE 8 Section) at Works Division 3 area. 2nd Call General Funds
Laying of 110 mm HDPE Pipe Line From d.no 1-49 in mangala veedhi in Vizianagaram Municipal Corporation Under 14th Fc 2019-20 BG . (Est.cost : 10.00 Lakhs). (Supply Delivery of Specials)
Providing 110mm dia HDPE pipe line from Sri Satti Srinivas house D No 6-1-6/1 to Sri Pinisetti Apparao huose D No. 6-1-5/5 in 9th ward
Laying of 160 mm dia HDPE Pipe line from Maremma temple to 69/1-C-6 (Vijaya talkies) at Telugu Geri, Joharapuram ward no.17 in Kurnool Municipal CorporationF (4th CALL)
Providing 110mm dia HDPE pipe line from Sri Satti Srinivas house D No 6-1-6/1 to Sri Pinisetti Apparao huose D No. 6-1-5/5 in 9th ward
PRoviding 200mm dia HDPE pipe line improvement of water Supply from GVS Apparao street D.No. 86-10-10/1, to 86-18-57/1, VL Puram Aksharasri School in 11th division.
Punganur Municipality - 14th FCG 2016-17 PG - Laying of 110 mm dia HDPE pipe line from Amaranatha Reddy Petrol Bunk to D.No:31-118 at Marks Nagar in ward No:22
Laying of 100 mm dia A.C Pipe Line from Kunchala Chalapathi house to Vengamamba Cool Drink Shop at Maruthi Apartment back side in Dharavari Thota in Division No.21 (2nd call)
Laying of HDPE Distribution Pipeline from Happy Apartment to 60 feet road, in Ward No.09.in Guntakal Municipality under 15th FC Grant 2025-26 (1st Installment) Untied Grant in S No 2
Puttur Municipality - Scheduled Caste Sub Plan (SCSP)-2024-2025 Grant - Laying of Pipeline from Existing Bore Well Near Burrial Ground to Nandimangalam Sachivalayam at Nandimangalam Harijanawada in 13th Ward of Puttur Municipality.
15th FC 2020-21 (2nd installment)-Laying of new GI pipeline and PVC pipeline and Drilling of borewell at Guruswamy Naidu Colony and Kannaiah Naidu Colony in Division No.33 & 34.
Laying of CI Pipeline with AC pipeline from D. No. 2-2-189 to 2-2-280/1 at Thahasildar Road 26th and 27th ward under 14th FC Grant 2015-2016
Replacement of damaged water supply pipeline with 200mm Dia HDPE Water Supply pipeline from R&B Colony Road to IRR along Nandamuri Nagar main road 58th Division Works Division-II Area
Replacement of damaged water supply pipeline with 200mm Dia HDPE Water Supply pipeline from R&B Colony Road to IRR along Nandamuri Nagar main road 58th Division Works Division-II Area
Replacement of Old Damaged 200 mm dia HDPE pipeline with New 160mm and 110mm dia HDPE pipeline at Narayanapuram beside FCI Food Godowns Road in 2nd division of Rajamahendravaram Municipal Corporation
Upgradation of PVC Pipeline with New HDPE Pipeline at Danyampakalu School Street from D.No.40-11-5 to 40-11-30 in 28th division of RMC (Under Gadapa Gadapaku Mana Prabhutvam)
Replacement of damaged water supply pipeline with 200mm Dia HDPE Water Supply pipeline from R&B Colony Road to IRR along Nandamuri Nagar main road 58th Division Works Division-II Area
15th FC 2020-21 (2nd installment)-Laying of new GI pipeline and PVC pipeline and Drilling of borewell at Guruswamy Naidu Colony and Kannaiah Naidu Colony in Division No.33 & 34.
Providing HDPE water supply pipe line from 1)D.No.30-4-16/2 to 30-4-12/1 2)30-4-16/2to 30-4-13/6 3) 30-4-13/1A to 30-4-13 Providing 110 & 160mm Dia HDPE water supply distribution pipe line from 4)30-3-8 to 30-5-14 5)30-5-14 to 30-5-16 at Dhanakoti layout, in Ward no.11
Laying of 200mm Dia HDPE Pipe line at South Side of NRT Main Road From AMC Main Gate to Durga Nagar Vijag Steel and Laying of 110mm Dia HDPE Pipe line and Interconnection at Durga Nagar Main Road 1st Cross Road to lakhsmi Nagar 1st Line,2nd line, 3rd Line and 4th Line and Sai Nagar Tirupatamma Talli Temple Road in Div No.25 Under AE 3 Section.
Laying of 160 mm dia HDPE pipe line from 49-50-a-67a to 49/50-A-12-B & laying of 110 mm dia HDPE pipe line from H.NO 49-1-87A to 49-1-88A , 49/50-A-49-B to 49/50-A-42-A, D,No.49-50A-87F-12-A2 to D.No.49/50A-87-A1 at Laxmi Nagar, Ward No.24 in Kurnool Municipal Corporation.
Laying of 160 mm dia HDPE pipe line from 49-50-a-67a to 49/50-A-12-B & laying of 110 mm dia HDPE pipe line from H.NO 49-1-87A to 49-1-88A , 49/50-A-49-B to 49/50-A-42-A, D,No.49-50A-87F-12-A2 to D.No.49/50A-87-A1 at Laxmi Nagar, Ward No.24 in Kurnool Municipal Corporation.
Clearing of accumulated ash at bottom ash area, ESP area, along and surroundings of the ash conveying pipe line from buffer hoppers to intermediate silos and along the ash conveying pipe line from intermediate silos to remote silos (except under the silos) of Stage-II and loading it to the tractors and transporting to ash pond for a period of one year (i.e. from April 24 to Mar 25)
Clearing of accumulated ash at Bottom ash area, ESP area, along and surroundings of the ash conveying pipe line from Buffer hoppers to intermediate silos and along the ash conveying pipe line from intermediate silos to Remote Silos (except under the Silos) of Stage-II and loading it to the tractors and transporting to ash pond for a period of one year (i.e. from April 2023 to March 2024)
Supply& Laying of 110mm Dia HDPE Pipe Line in jenda chettu line (D r No:1-16-15 To D r No: 1-1-72 ,Ration shop line (Dr nO:2-12-3 To D R no:2-12-1/1)&160mm Dia HDPE Pipe Line in mudu bavula center (D r No:1-1-1/A/20 To shaik allbakshu House) in Ward No: 32 of Narasaraopet Municipality.
Construction of 1000 Ltrs capacity of Syntax tanks Completion of electrical works in Class Rooms, Dormitory, Dinning Hall, Development of infrastructure in dormitory, Reconstruction of water pipe line etc to Dr.B.R.Ambedkar Gurukulamat Malugur (V) Hindupur (M) in Sri Sathya Sai District. Est.Cost Rs.16.00Lakhs. (3rd Call)
Shifting of HDPE Pipe line From Elite Homes Apartments to Ele Pole No:SN-9/16 And From Ele Pole NO:PL/42 to Ele Pole No:ATL/6 (Near Skanda Harmony Apartments) in ward no :41 And Laying of 6" HDPE Pipeline from weaker section colony Auto Stand to All India Radio Station Compound Wall in Ulchala road In Weaker Section Colony in ward no:37 in Kurnool Municipal Corporation.
Shifting of HDPE Pipe line From Elite Homes Apartments to Ele Pole No:SN-9/16 And From Ele Pole NO:PL/42 to Ele Pole No:ATL/6 (Near Skanda Harmony Apartments) in ward no :41 And Laying of 6" HDPE Pipeline from weaker section colony Auto Stand to All India Radio Station Compound Wall in Ulchala road In Weaker Section Colony in ward no:37 in Kurnool Municipal Corporation.
Construction of temporary bund to restoration pipeline at titli cyclone in Ichapuram Municipality
Providing Water Sump and Pipeline at TidCo Housing Colony in Bodaskurru, Amalapuram municipality.
Providing of 100mm dia AC Pipeline at kanaka Durga Plastics in Industrial Estate.
Providing storm water drainage pipeline in Arjun street in 25th division. (Devasthanam Funds)
providing 110mm Dia HDPE pipeline in Urimila Nagar 1st cross road 1st division
Providing cc road, drain and pipeline in Atchyuta Ramayya street in 21st ward
Rectification of Pipeline repairs of water supply in Tadepalli area in Tadepalli Municipality