Loading…
Loading…
13,974 results • Best match
Construction of Meter Room and Transformer Footing, Lighting Arrangement, Pumping Machinery, Painting, Distempering and Snowcem, Head Work Pipe Line, Laying of Distribution Pipe Line
Galauli Gram Panchayat, Replacement of existing A.C/P.V.C pipe line to D.I pipe line in Habitation Mansapur, Block Jagadhri, Constituency Sadhaura, District Yamuna Nagar
Kharak Ramji Estimate for providing and laying of DI pipe line in place of damaged pipe line and balance street in village Kharak Ramji.
Laying of shifting of 150 mm id DI pipe line 366 mtr Laying of shifting of 250 mm id S. pipe line 366 mtr.
SARASWATI KHERA Providing Functional House Hold Tap connection Laying of D.I Pipeline in balance streets Repair of Pump chamber, Boundary wall at Village Saraswati Khera and all other works contingent thereto
Shifting of existing 100 mm id 150 mm id and 200 mm id Di water supply pipeline from Hisar Rohtak old NH10 road with CI DI specials sluice valves etc. Kharkara
REPAIR AND MAINTENANCE OF EXTERNAL WATER SUPPLY DISTRIBUTION SYSTEM, SLUICE/AIR RELEASE VALVES, PIPE LINES, VALVE PIT CHAMBER, FIRE FINGHTING PUMPS, FIRE PIPE LINE SYSTEM VALVES AND CONNECTED WORKS AT DOMESTIC SWS AND ETF COMPLEX ZONES AREA AT TBRL R
Nahri Estimate for FHTC Pipe line Acq of land and water works under JJM Preparation of Detailed estimate for Aug Canal based Ws scheme Nahri Aug Tw based water supply scheme in village Jakholi Kheri Manajat Kishora Kumaspur Malha Majra Aterna
Laying of 200mm DI pipe line in village Raipur
Laying of D.I Water supply Pipe line 3000 mtr.
installation of 01 no Twell and connecting pipe line
CHLORINATION SYSTEM CONNECTIONG PIPE LINE PUMP CHAMBER BOUNDARY WALL
LAYING OF 100 MM D.I. PIPE LINE - 440 MTR.
Installation of one no Tubewell and connecting pipe line
VILL- THANA- Laying of DI Pipe Line for Pond
Cleaning of 400 mm i/d sewer pipe line
Paplotha village, estimate laying of water supply pipe Line
Replacement of Distribution Pipe Line and Restored Tap Connection
installation of new tube well and connecting pipe line
Laying of 100mm i/d DI Pipe Line and
Replacement of Distribution Pipe Line and Restored Tap Connection
CONNECTING PIPE LINE CONSTRUCTION OF PUMP CHAMBER CHLORINATION SYSTEM
Laying of D.I Water supply pipe line 1510 mtrs.
Laying of 110mm PVC pipe line in village Sisai
Laying of DI pipe line and providing of FHTC
Const. of Structures, laying of balance pipe line etc.
Drilling of one no tubewell and connecting pipe line
Laying of DI pipe line and providing of FHTC
Laying of DI water supply pipe line 1075 mtrs.
Construction of Boosting Station and Replacement of Pipe Line
Connecting pipe line and Installation of New Electric Connection
Laying of DI water supply pipe line 2560 mtr.
LAYING OF 100 MM D.I. PIPE LINE - 1384 MTR.
LAYING OF D.I. PIPE LINE 100 MM - 1020 MTR.
Installation of 1 no tubewell and connecting pipe line
Renovation of existing structures, Laying of D.I. pipe line
Installation of 01 no tubewell and connecting pipe line
Laying of 100mm i/d DI distribution pipe line
Laying of HDPE Pipe line 4050Mtr. FHTC 86 Nos.
Providing laying jointing of 100mm 250m DI pipe line
CONNECTING PIPE LINE CONSTRUCTION OF PUMP CHAMBER CHLORINATION SYSTEM
Construction of SBS and Laying of connecting pipe line
Providing and laying DI pipe line 100 mm id
Atail Providing Functional Household Tap Connections FHTC Laying the balance Pipeline renovation of existing structure of water works in village Atail Distt Rohtak Under JJM Providing and Fixing of Gaseous type chlorination systemplant wit
Madanpur Providing Functional House Hold Tap connection and Laying of DI pipeline in balance streets, repair of Pump chamber Boundary wall at village Madanpur and all other works contingent thereto under Jal Jeevan Mission
Shifting 700mm i/d DI pipeline at Sector-57 T point and 400mm i/d DI pipeline in front of Presidium School, replacement and dismantling of old/damage specials/pipes at Hilton Hotel Red Light Sec-47 and near HDFC School Sec-57, Gurugram
Providing and fixing of Functional Household Tap Connection (FHTC) , Laying of balance distribution pipe line and all other works contingent thereto in village Biwan Block FP Jhirka Distt. Nuh ( Category - II under JJM)
Drilling of two no Tubewell and two no pumping machinery
BAGRU DNIT for the work of laying of distribution pipeline Const. of sluice valve haudi Providing FHTC... 1 No. WTP and OM for 12 months during defect liability period after trial run of 3 month and 5 year Name of Work as Per CBD Attached
Kasandi - DNIT for the work of laying of distribution pipeline, Const. of sluice valve hodi, Providing FHTC, Const. of toilet, Const. of septic tank, White wash WW, Light system at WW, repair of 4 Nos. FB and repair of PC at WW in Village Kasandi