Loading…
Loading…
10,763 results • Best match
DEPOSIT-Deposit work Karunagappally Municipality-CWSS to Oachira, Karunagappally, Alappad and Clappana - Extension and interconnection of distribution pipe line with 75 mm PVC CL3 pipe from Padipura Jn to Kochalumoodu Jn amp in the North side of On
Deposit work - PWD roads Budget work 2019-20 Mararikkulam Railway station Thumpoly, Thumpoli Railway station road Phase I- Relaying 110 mm PVC pipe line at east side of Thumpoly railway cross to Poonkavu railway cross in Aryad Panchayat.
S 342/23- Construction of drain and covering slab in pipe line road from Samskara junction, Chakkunkal lane at the entrance of St. Martin road, Indria road By lane ( SNDP bilane, Thaniparambil Sree bhadrakali kshethram lane)-Div.44
Name of Work Deposit Work 2020 21 Madappally Block Panchayath R W S S to Madappally Vakathanam Karukachal Panchayath Interconnection work at Pulimalakunnu Thadathilpoyika in Ward No 4 13 and pipe line extension Thanakulam in ward No III
Deposit Work 2020-21 - Ramankary Grama panchayath- Pipe line extension in various Wards - from Aganvadi to Sarppakkavu Ward 01 Mukkam to Left of Manalady Jetty Ward 2 Homiyo Hospital to Pakkalli Bridge Ward 11 Pallikuttumma Puthuval Maniyan Hous
Annual Plan-Annual Plan 2022-23-Proj. no 713/23-TCR CORP OLK ZONAL-Re tarring of pipe line road snehapalam road mannuthy by lane road and drain maintenance near mannuthy by pass-Div 16-General Civil Work
J J M 2020 21 Supplying laying commissioning and maintenance of distribution system providing FHTCs 1678 Nos and supply and erection of electromagnetic flow meter in Vellinezhy Panchayath phase II Balance work for completing FHTCS-Pipe line work
Jal Jeevan Mission RWSS to Karukutty and Mookkannoor Multi Village Scheme Extension of Pipe Line and Providing Functional House Hold Tap Connections FHTC to Rural House Holds in various Wards of Karukutty Panchayath and Allied Works Part 1
Deposit Work 2021-22 - District Panchayath Alappuzha - Pipe line extension in Palapparambu Palam and Velamparambu to South Up to Vazhakkuttam in ward of 04 of Ramankary and Wyshyam Bhagom manapra road of ward 12 in Nedumudy Grama Panchayath
JJM-WSS to MCTV GPS in Malppuram District - Package II- Supply Laying CWTM Construction of Pipe line Bridge across River -Rail cross via HDD Construction of Service reservoirs including supply laying distribution system with FHTC for Vallikkunnu GP
DEPOSIT-Kottakkal Ambara Kadampuzha road Restoration-Restoration due to KWA pipe line work - Reformation of shoulder of Kottakkal Ambara Kadampuzha road in between km 3/495 to 3/995 and 5/550 to 6/080-General Civil Work
Deposit work 2021-2022 - Block Panchayath Koippuram - Pipe line extension in ward 13 Kizhakkel Padi -Mundackal Padi Road in Ward No. 08 of Puramattom Grama Panchayath and Muttumon-Kandam Road in ward No.15 of Koipuram Grama Panchayath
Deposit Work 2017-18 - Ramankary grama Panchayath - Laying 90mm PVC pipe line from K.K. Varki to Kangayathodu palam in Ward No. 9 Narakathara to Thenginal and Kottayil Appu Nivas to Kizhakke Muttathil Sosamma Nivas in Ward No. 11
Restoration due to pipe line cutting Urgent reformation of damaged shoulder and BM BC road surface works to Malappuram Prappangadi road Km 12 475 to 15 000 and Athikarathodi Koottalur road 2nd reach 4 780 to 5 660
JAL JEEVAN MISSION -Construction of open well cum pump house, distribution system in Rosemala ward in Kulathupuzha panchayath and pipe line extension in various wards of Kulathupuzha panchayth for last mile connectivity and for providing FHTC in o
DEPOSIT- Deposit work- RWSS to KEEZHMADU-RWSS to Keezhmadu Panchayath-Providing new water connection to Anganvady no-51 and renovating existing connection pipe line of Anganvady no-24 in ward no-2 of Keezhmadu Panchayath-General Civil Work
Deposit work 2019-20 - Madappally Block Panchayath - Pipe line extension and providing street tap in Mulakkamthuruthy Vechuthara Madam - Parathodu road and Nathanadichira bridge of ward No.1 MC road to Akathepallom and MC road to Kalluthara road of
Jal Jeevan Mission (JJM)-JJM-Edayur Functional house hold tap connections (FHTC) in Edayur GP (WSS to Irimbiliyam GP,Valancheri Municipality ,and WSS to Edayur GP -Phase II Providing additional Functional house hold connections (FHTC) with Pipe line
DEPOSIT-Renewal of pipeline at Kalabhavan road-Replacing of old damaged pipes in Kalabhavan road and Old St. Augustin road with new 110 mm and 63 mm PVC pipes in div 66 (new), 41(old) of Kochi Corp. -Pipeline Work
Jal Jeevan Mission (JJM)-KWA JJM-Hiring of a vehicle with driver with valid license having cubic capacity between 1000cc and 1500cc,7-seater for KWA, Project Division, Nattika -Hiring of a Vehicle-Pipeline Work-Hiring of a vehicle-Pipeline Work
CWSS to Nattika Firka -Annual maintenance of 500mm Premo Gravity main From CV Centre to Agastheswaram Temple Mathilakam section for the year 2021-2022
KIIFB 2017 2018 WRD 025 026 DRINKING WATER PROJECT IN ETTUMANOOR IN KOTTAYAM DISTRICT URGENT PIPE LAYING WORKS ALONG NH ROADS AND ADJOINING BRANCHES DUE TO NH ROAD RECONSTRUCTION SUPPLYING,LAYING,TESTING AND COMMISSIONING OF 150 MM DI CONVEYANCE MAIN
Jal Jeevan Mission (JJM)-Additional pipe laying for last mile connectivity and supply and erection of 5HP CF pump set at Anchal OHSR for supplying water to high elevated areas at Pinnacle view point-Suppy and erection of 5HP Pumpset
GENERAL-DEPOSIT-Restoration work in PWD roads due to Pipe Laying Project of KWA in connection with AMRUTH Scheme of Alappuzha Municipality --Re-Construction of Drain in Nethaji Subhash Chandra bose Road Ch (0/000 to 0/460)-General Civil Work
O M Water Supply Schemes Mace of UWSS to Piravom Municipality West Zone Repairs to pipelines and taps for one year period in Piravom Municipality Pipeline Work
O M Water Supply Schemes Mace of UWSS to Piravom Municipality Central Zone Repairs of pipelines and taps for one year period in Piravom Municipality Pipeline Work
Relaying pumping main and distribution lines due to the Road Renovation works under PWD (KIIFB)
AugmentationofRWSStoElanji Panchayath SurveyInvestigationconstructionof 9 LL OHSR atKoorumalaSupplyingandlaying250mm pumping main from KakkadWTPto KoorumalaOHSRandSupplyingandlaying distributionlineandgivinghouseconnectionsand providing FHTCs.Part1
Cheethappatt Kudivella WSS Completion work General Civil Work- Pump house construction, pumping main, distribution main
Restoration work on Kovoor-Palazhi Old MLA road -between Ch 0/000- Ch 2/000
Urgent maintenance works
DEPOSIT project noSO 51525Laying new PVC line at various places under Arannoor ward of Thiruvananthapuram Corporation Pipeline Work
DEOSIT Kalamassery Municipality Extension of PVC and GI pipes at various places of Ward No 38 Pipeline Work
MLA-SDF-2023-24-Pipeline Extension In Kanjookkadu Road in Ward 7 of Udayamperoor Panchayath.-General Civil Work
Others-DRW-2023-24 - Supplying, Installation and Commissioning of Backwash Air Valve- For WTP, Mudavannur-Pipeline Work
DEPOSIT Elanthoor Block Panchayath 2022 23 Panchayat Puthenpeedika Thaanimoottilpadi drinking water project Project no.S0077 22 Pipeline Work
DEPOSITPothencode Grama Panchayath Permanent disconnection of existing public taps in various wards of Pothencode Panchayath Pipeline Work
Deposit Work Kottayam Municipality Ward 14 Shifting pipeline and Connection in Millenium Road while Constructing Darinage Channel
Deposit Work UWSS to Kottayam Municipality Replacing old and damaged pipeline in Ward 17 of Kottayam Municipality
Fabrication, Dismantling and Erection of underground pipe lines for repair/ replacement of damaged pipelines / installing new lines / modification / re-routing etc. at various locations in Hyam and Utilities in PETRO Plants UC.
DEPOSIT- Deposit work of Thiruvananthapuram Corporation - Project No. SO 1981/26 - Replacement, Extension of damaged pipelines and allied works in various wards - Construction of valve chambers along Thirumala Thrikanapuram road - Package 1
DEPOSIT- Deposit work of Thiruvananthapuram Corporation - Project No. SO 1981/26 - Replacement, Extension of damaged pipelines and allied works in various wards - Construction of valve chambers along Thirumala Thrikanapuram road - Package 2
DW 2018 2019 WORKS AFTER LAYING U G CABLES AND PIPELINES ALONG PALA KOZHA ROAD BETWEEN CH 0 000 TO 2 000 AND NELLIYANI PENDANAM VAYAL CH 0 0000 TO 1 700
Replacement of Cooling Water Outlet Pipelines with Seamless Carbon Steel pipes and UGB CW pipes with Seamless Stainless Steel pipes at Idamalayar Power House, including Dismantling, Supply, Fabrication, Erection, Installation, Testing, Commissioning
O and M Water Supply Schemes Replacing damaged portion of 800 mm MS pipe near Thampanoor bus terminal Thampanoor Pipeline Work
CIVIL, MECHANICAL, STRUCTURAL & PIPING FABRICATION JOBS INCL. SUPPLY OF REQUISITE MATERIALS AT CCKPL PIPELINE LOCATIONS -KOCHI (LOT 1) AND KARUR (LOT2)
Road work including excavation for roadwork , Pothole filling,GSB ,WMM,bitumen leveling coarse,BM ,BC ,Reflective road studs etc
Jal Jeevan Mission-Kasaragod District Ajanur Panchayath -BRDC WSS to Ajanur phase IIKollavayal Adimayil Temple pipeline extension and providing FHTC
JJM Koovapady Ernakulam District Koovapady Panchayath Phase III Part IV Extension of Pipe line in Ward 13 14 15 16 and Providing Functional House hold Tap Connections Balance work Pipeline Work