Loading…
Loading…
10,769 results • Best match
DEPOSIT CSME GCDA Providing water supply connection to Food street of GCDA at Kasturba Nagar in Division 27 old of Cochin Corporation Pipeline Work
Jal Jeevan Mission (JJM)-Thalakulathur grama panchayath-providing FHTCs by extending existing lines at Nadathuruthi and thalakulathur bazar in Thalakulathur grama panchayath-pipeline work
Jal Jeevan Mission (JJM)-Water supply to Vazhayur Grama Panchayath-Phase II-Providing Balance Distribution and FHTC Including LSGD Road Restoration Charges-Pipeline Work
Jal Jeevan Mission (JJM)-JJM 2022-23- POOTHAKKULAM PANCHAYATH PHASE 2 (PART)-Jal Jeevan Mission Phase- I- Balance work in Poothakkulam Panchayath.-Pipeline Work
TVM CORP Deposit work Harbor TVM CORP DEPOSIT WORK Pipeline replacement and extension work at various places of Harbor ward under WW section Vandithadam
KIIFB-JJM - WSS to Ala, Puliyoor, Budhanoor, Pandanad, Mulakuzha, Venmony, Cheriyanad Panchayaths - Phase II - Providing FHTCs in Pandanad Panchayath in Alappuzha District-Pipeline Work
AMRUT-Laying 500 mm pipe from Thammanam to Kadavanthra - Railway crossing at Km 4/300-400 near Ponnurunni by Push through method- Pipeline Work
AMRUT AMRUT 2.0 Floating Incentive Fund Replacing old frequent bursting pipe with PVC pipe in Anoor Thirumala Rose garden in Thrikannapuram ward Pipeline Work
E1-10541/23, Ward 03, Thrikkakara Municipality-Construction of drain at pipeline road retarring at M G Nagar road,star line road, Amritha lane
KIIFB-JJM - WSS to Ala, Puliyoor, Budhanoor, Pandanad, Mulakuzha, Venmony, Cheriyanad Panchayaths - Phase II -Providing FHTCs in Venmony Panchayath in Alappuzha District -Pipeline Work
DEPOSIT WSS To N Paravur Municipality and adjoining panchayaths Disconnection of Existing Public tap 26 Nos in Various Wards in Ezhikkara Panchayath Pipeline Work
AMRUT-AMRUT 2.0 - PALAKKAD MUNICIPALITY-REPLACING OLD AC or GI PIPES AND PROVIDING PARALLEL DISTRIBUTION LINES -METTUPALAYAM AND NARIKUTHI AREA-PART 5-Pipeline Work
DEPOSIT - THRIKKAKARA MUNCIPALITY WARD No.4 -Providing Water Supply distribution line at SH minor seminary road and Vallathol TVS Showroom to culvert-Pipeline Work
MP LADS 17th LS 2019 20 Sri N.K.Premachandran MP LS Pipeline extension from Kanjuvayal to Laksham veedu colony of Yeroor Panchayath in Punalur Municipality
Deposit work MLA SDF Fund Laying new 90 mm pvc pipeline at Poonkulam Channel road Kulavarambu road in Kalliyoor GramaPanchayath Under Vandithadam Mace Section
DEPOSIT Judicial Department CSME Laying 90mm PVC pipe along KK road Kadavanthra for providing water connection to Judges quarters and allied works Pipeline Work
KDP 2019-20 (SCP) (Pandalam Block Pt.) - Extension of pipeline from Devaru Temple to Vadasseri Illam in ward No.1 of Pandalam Thekkekkara Panchayath
Deposit Work Anchal Block Panchayth 2019_20 Extension of pipeline to Ayur Jawahar HS Akamon Laksham veedu Colony Edayilappura_ in ward no13 of Edamulakkal Panchayath
Jal Jeevan Mission 2022 24 CWSS to Peringamala Grama Panchayath in Thiruvananthapuram district Estimation of 2.5 LLGLSR and pump house at madathara Pipeline Work
Adoor Muncipality planning section 2019-20 - UWSS to Adoor and Adjoining Panchayat- Extension of pipeline at various places in Ward 13 of Adoor Muncipality
Deposit Work Kaduthuruhty Block Panchayath Mulakkulam Grama Panchayath Extension of Pipeline in towards Thattarkkunnu Colony road in ward no 14 of Mulakkulam Grama Panchayath
DEPOSIT Restoration works due to laying KWA pipeline in Kayamkulam Thiruvalla Road from Km 19/500 to 20/000 Parumalakkadavu junction to Pannai Bridge
DEPOSITSOUPARNIKA APARTMENT AT KUNNAMANGALAM CHERINJAL ROAD DEPOSIT WORK FOR NEW WATER CONNECTION TO SOUPARNIKA HIGHRISE APARTMENT 76 UNITS AT KUNNAMANGALM CHERINJAL ROAD Pipeline Work
DEPOSIT-DEPOSIT WORK 2021-22 ROAD RESTORATION ESTIMATE DUE TO LAYING WATERSUPPLY PIPELINE THROUGH EZHUKONE NEDUMONKAVU ROAD-DEPOSIT WORK EZHUKONE NEDUMONKAVU-General Civil Work
Annual Plan-Uzhavoor BP S056/26 -Pazhamala Division - Installation of Tank Well Motor and pipeline for Palliyampuram DWSS in Ramapuram GP-General Civil Work
-Annual maintenance of RWSS to Pandikkad for the year 2022 - 23-Annual maintenance of RWSS to Pandikkad for the year 2022 - 23-Pipeline Work
OandM Water Supply Schemes Annual Mace 2023 24 RWSS to Ranni Perunadu Leak rectification works of pipe lines in Perunad Grama Panchayath Pipeline Work
Annual Plan-2024-25/Kadukutty GP,S.O.0270/25, Renovation of thuruth road cut for GAIL pipeline at ward 12 of Kadukutty GP(Retender)
RWSS to Choornikkara Panchayath Deposit work Extension or Replacing of pipeline to varies places in Ward VIII IX XI XII XVI in Choornikkara Panchayath
EYE1/6628366/25 -Desilting of Kareethodu from Pipeline to Medical centre in Div 36(Old Div 43), Edappally zonal, Kochi Corporation-General Civil Work
DEPOSIT-RWSS to Puthanvelikkara Panchayath- Annual Project 2024-25-Replacing of 150mm AC pipe with 160mm PVC pipe at Kodikuthikunnu to Elanthikkara -Pipeline Work
Jal Jeevan Mission (JJM)-WSS to Kavannur Panchayath-JJM- Kavanur-Phase II- Providing Balance distribution system to Kavanur and Providing Balance FHTCs-Pipeline Work
DEPOSIT Ranni Angadi Grama Panchayath KDP 2023 24 Project no 199 WSS to Chavarumplavu Extension of pipe in WSS to Chavarumplavu scheme Pipeline Work
Deposit work Punalur Municipality Extension of pipeline in Vazhapalli Madom to Nethaji in Nethaji Ward and Sevakendram area at Vettipuzha Jaladhara road Powerhouse ward
KIIFB- Utility shifting-KIIFB funded project of PWD road-WSS to East Eleri Panchayath-Replacing pipline along Nallompuzha-Palavayal-Odakolly PWD road-pipeline work
DEPOSIT KIIFB Muzhapilangad WSS to Anjarakandy Peralassery and adjoining panchayath water supply arrangement to sump at KTDC beach resort in Muzhapilangad panchayath Pipeline Work
OandM Water Supply Schemes Annual Mace 2025 26 RWSS to Ranni Perunadu Leak rectification works of pipe lines in Perunad Grama Panchayath Pipeline Work
PWD Deposit work KIIFB Budget work 2016 17 Improvements to Mannoor Ponjassery Road Utility shifting Replacing pipeline in Mannoor Airapuram road in Mazhuvannoor Panchayath
DEPOSIT-Urban Agglomeration-Laying Distribution pipes and Reinstating House Connections from AC pipes to Newly laid PE pipes along Nellikave Road Eranhippalam-Pipeline Work
O and M - Water Supply Schemes- RWSS TO VEEYAPURAM - Anual maintenance of water supply system in Veeyapuram panchayath for the year 2023-Pipeline Work
Jal Jeevan Mission (JJM)-WSS to Cheekode and Adjoining Villages-Phase II-Providing Balance distribution and Road restoration in Kuzhimanna Grama Panchayath-Pipeline Work
JJM 3rd SLSSC Eraviperoor Grama Panchayath Functionality Improvement Replacing old damaged AC pipeline along Nannor Thottappuzha road during BM BC renovation work by PWD
JJM -WSS TO Thripangode Mangalam Purathur Thalakkad and Vettom GPs-Providing Distribution Network and FHTCs -in Thalakkad Grama Panchayath Low Level Zone-Pipeline Work
Annual Plan-DEVIKULAM GP 2025-26 - WARD 6 - ELLAPPETTY CENTRAL DIVISIONWATER TANK CONSTRUCTION AND MALLIKA HOUSE PIPELINE - 181/26- Water Supply-General Civil Work
GENERAL-Annual Plan-Poonjar Thekkekara Grama Panchayat 69/2024-25 Pipeline Maintenance of Edamala DRrinking Water Project in ward-7 (Single Year Project)-2,50,000
DEPOSIT-Deposit work Annual plan 2024-25 -ThakazhiGramapanchayath (RO Plant)- Renovation of RO Plant in ward no.1 ofThakazhy near KarumadiGovt school Pipeline Work
KDP 2020-2021 Pandalam Block Panchayat(General) - Extension of Pipeline from Kizhackekkarappadi to Charuvilaputhenpadi in ward no.10 of in Pandalam Thekkekkara Grama Panchayat
Laying and construction of 8 and 4 Steel pipeline network along with associated work from Chitari IOCL to BSNL Uduma under Kannur Kasaragod GA
DEPOSIT PWD Ranni Sabarimala Festival 2020 21 Improvements to Chethomkara Athikkayam road Utility shifting of 40mm GI pipe near Anchukuzhy Divyakarunya Ashramam-Pipeline Work
O and M - Water Supply Schemes-CARWSS to Kulathupuzha-MACE of various distribution lines in Alayamon panchayath for a period of 1 year-Pipeline