Loading…
Loading…
10,769 results • Best match
Deposit Work -using balance fund 2018 -19 Nilambur Municipality Pipeline extension to Ramankuth Smashanam road and Concreat path near Ramankuth anganavadi in ward No.20
DRW 2022-23 Thakazhy pachayathu - Relaying 90mm PVC line at Kunnumma east of muslim church - in front of seminary building to pulimugham jetty-Pipeline Work
Jal Jeevan Mission-WSS to Cheekode and Adjoining Villages--Providing balanceDistribution with FHTC including PWD and LSGD Road restoration in Cheekode Grama Panchayath-Pipeline Work
O M Water Supply Schemes Mace of ARWSS to Thalayazham and adjoining villages Thalayolaparambu Panchayath Maintenance of various distribution system for one year Pipeline Work
JAL JEEVAN MISSION (JJM)-PERUVAYAL GRAMA PANCHAYATH -PROVIDING FHTCs BY LAYING PVC PIPES, GAP CLOSING WORK, ROAD RESTORATIONS AND ALLIED WORKS - REACH 3-Pipeline Work
Jal Jeevan Mission JJM Jal Jeevan Mission phase II 2022-2023 - WSS to Kadangode Panchayath Providing Distribution Network and FHTC to Kadangode Panchayath-Pipeline Work
Others-Drought 2023-24 -Desilting well and Renovation of the pump house and supply of 10HP motor pump set at Kundazhiyur pump house-Pipeline Work
Deposit work - (Adoor Muncipality - Planning section 2019-20) UWSS to Adoor and adj. Pts. Extension of pipeline at various places ward 26 in Adoor Municpality
KDP 2018-19 (Parackode Block) - Extension of pipeline to Nilackal colony, Pandimalappuram colony and to Parankimamvila colony in ward No. 12 of Kadampanadu Grama Panchayath
Restoration due to pipeline cutting - Urgent reformation of damaged BT road surface works to Kottakkal - Chappangadi road b/w km 0/000 to 3/100.
Annual Plan-KVPDY 21/2025-2026 Completion of Pipeline extension of Drinking water project near Ilambillichal canal palam link road in -Vengoor GP ward 7
Annual Plan Vandazhy 2023 24 Proj No 292 Paakkad Charkka class DWSS Motor installation and Pipeline laying in Ward III of Vandazhy GP Re Tender
DEPOSIT-Deposit Work (2023-24) - TDO(SBY) Drinking water project for Mullankolly GP-Providing Storage facility and allied structures in in Edamala Colony - Pipeline Work
MLA SDF_2018_19_Sri K Raju MLA Punalur constituency Pipeline extension from Govt high school Jn to Nettayam west and Nettayam South in Yeroor Panchayath ward (18)
DEPOSIT-DW - Karumalloor panchayath-Laying 63 mm PVC line in Ansarul Islam Sangham road and mannanthara road of ward 2 in karumalloor panchayath-Pipeline Work
DEPOSIT-Njarakkal Panchayath-Laying 63mm PVC Pipe at Smashanam road in ward 1 and laying 90mm PVC Pipe at Valiyavattom in ward 7 -Pipeline Work
O and M Water Supply Schemes-RWSS TO MYNAGAPALLY ANNUAL MAINTENANCE OF RWSS TO MYNAGAPALLY GRAMA PANCHAYATH FOR THE YEAR 2024 and 2025 Pipeline Work
Jal Jeevan Mission JJM WSS to Kanjoor Sreemoolanagaram Chengamanad Nedumbassery and Parakkadau Panchayaths Road restoration in Parakkadavu Panchayath part II PWD and LSGD Pipeline Work
AMRUT 2.0 -Last mile connectivity- Laying Pipe Lines at Various Wards in Old Municipal Area in Kollam Corporation for Providing House Connection(FHTCs)-Pipeline Work
CWSS to Perumatty, Pattanchery, Elapully and Nallepilly Panchayaths - Pipeline Extension for providing Water Supply for Ambalapparamb (Ward 14) and Nellimedu (Ward 10) in Pattanchery GP
Jal Jeevan Mission JJM WSS to Vengoor Asamannoor and Mudakkuzha panchayaths Providing Distribution Networks Providing FHTCs and Road restoration works in Mudakkuzha Panchayath Pipeline Work
DEPOSIT WORK -Laying 110 mm PVC pipeline near Upadeshikadavu in Kadapra Panchayath as part of Utility shifting by PWD bridges division Thiruvalla under Nedumpuram Section
Palakkad municipality deposit 20-21 pipeline extension to municipality W No 26 near fire ststion and D block Santhasundaram house to house No D 22B
JJM -5th SLSSC- Providing 2617 FHTCs and Pipeline extensions in all wards of Kunnamthanam Panchayath including supply and erection of pumpset and road restoration works.
Deposit Attukal Pongala 2023 Providing temporary tap shower arrangements and improving water supply at Fire Hydrants in Attukal area Under WW Section Kuriathy Pipeline Work
O M Water Supply Schemes Maintenance of ARWSS to Thalayazham and adjoining Villages Maravanthuruth Panchayath Maintenance of various Distribution system for one year Pipeline Work
AMRUT- 2.0- UWSS to Changanassery Municipality- Laying Distribution Main (Phase 2) from Proposed 15 LL OHSR at Perunna to Market Area- Balance Work- Pipeline Work
Water Supply Schemes-DRW - Njarakkal Panchayath-Laying 75 mm HDPE Pipe and 75 mm PVC Pipe at Sagar Rani road in ward 1-Pipeline Work
Kochi Municipal Corporation S.845/22 Construction of Side Protection Wall at Kareeppilly thodu from Pipeline road to Western side Thodu in DIV NO 41
Jal Jeevan Mission (JJM)-JJM - Providing FHTC and Platforms in Kayakodi GP-JJM - Additional providing FHTC and Platforms in Kayakodi GP part 2-Pipeline Work
DEPOSIT Replacement of 500mm DI pipe with 500mm MS pipe due to widening of culvert near Subhash Chandra bose road at Kadavanthra Kadavanthra Pipeline Work
Deposit work REBUILD- RKI - Rebuild Kerala Initiative -Shifting utilities from Kottangal Jn. to Chunkppara road -C.K Road - due to PWD Road Renovation Work-Pipeline Work
DEPOSIT Steel Authority of India Replacing damaged inside installed 63mm PVC connection pipe and tapping from 200mm PVC main at SAIL Warehouse Tripunithura Pipeline Work
Deposit work- using balance fund 2018-19 -Nilambur Municipality -Pipeline extension through alungal pallipadi road and ummer road in ward No.12 of Nilambur Municipality
KDP 2019-20(PANDALAM BLOCK PANCHAYATH)-EXTENSION OF PIPELINE TO KADUVATHUKKAL kIZHACKETHIL GRACE VILLA-PRASANTH BHAVANAM IN WARD NO.2 OF THUMPAMON GRAMA PANCHAYATHU (SC)
AMRUT Providing Scour Line Isolating the Existing Line and Extension of Pipeline Inter connection work at Various Locations around Kuttanellur OHSR Tank GENERAL CIVIL WORKS
O and M - Water Supply Schemes- Periodic Washing of the GLSR and OHSR at PTP - under PTP Subdivision for the year 2025 - 26-Pipeline Work
KPIP-AM-Upkeeping of masonry dam, turfing control room and dam premises jungle clearance including maintenance of pump, pipeline etc for the year 2021- 22.
KDP 2021 2022 Pandalam Block Panchayat General Extension of Pipeline from Polytechnic Junction to Pandianvila road in ward no III of Pandalam Thekkekkara Grama Panchayat
Minority 2019-20 - Pipeline extension to Mannarpadi Sadham Colony (Padinjarekara area) in ward No. 4 of Kuruva Panchayath from CARWSS to Moorkanad and adjoining villages
Deposit work Kollam Jilla panchayat Pipeline extension by using 65mm GI pipe and providing house connections in Irumpanangadu Leksham veedu coloney in Ezhukone Grama panchayat
DEPOSIT Cherukole Grama Panchayathu Letter No S C 2430 2024 RWSS to Cherukole 2024 25 Disconnection of public tap in Cherukole Grama Panchayath Pipeline Work
MLA SDF 2020 Extension of pipeline at Noolampara in Kumily Grama Panchayath and providing water connection with bulk meter to Block Panchayath tank in Noolampara
O M Water Supply Schemes Maintenance of ARWSS to Thalayazham and adjoining Villages Chempu Panchayath Maintenance of various distribution system for one year Pipeline Work
Vadakarapathy Gramapanchayat deposit work 2018-19-Pipeline extension at Parassikkal SC Colony ward no.12 and Kinarpallam SC colony ward no. 9 in Vadakarapathy GPt
KDP 2019-20(PANDALAM BLOCK PANCHAYATH)-EXTENSION OF PIPELINE TO WARD 4 and 5 OF PANDALAM THEKKEKKARA PANCHAYATHU -(1)from Paikkattupadi to southwards Thengum thondalilpadi
DEPOSIT-Deposit Work - Public Tap Disconnection in Various Scheme in Cheruvathur Panchayath-Deposit Work - Public Tap Disconnection in Various Scheme in Cheruvathur Panchayath-Pipeline Work
Deposit work-2019-2020 Anakkara Panchayath PipeLine Extension in various placed in ward 4, 5, 8 and9 of Anakkara Grama Panchayath. (General Pro No.11)
Annual Plan-2024-25/Kadukutty GP,S.O.0271/25, Renovation of parayam link road cut for GAIL pipeline at ward 11 of Kadukutty GP(Retender)
DEPOSIT Utility shifting For Construction and Reconstruction of drain and road at Mettupalayam Diara street Narikuthi road PAJ Masjid to Flower Market road Pipeline Work