Loading…
Loading…
10,771 results • Best match
Jal Jeevan Mission (JJM)-Chelannur grama panchayath-providing FHTCs by laying PVC pipes , gap closings and leak rectification work in Athiyanathil thazham and adjoining areas-pipeline work
Deposit work Providing sub main to Naduvilkuttipuram area in ward 18 Medical College area Laying 110 mm PVC pipe in Ward 18 Medical College area Pipeline work
DEPOSIT-Pipe Replacement as part of the construction of Chirayinkeezhu railway overbridge-Replacing the old damaged distribution line of KWA near the railway gate Chirayinkeezhu-Pipeline Work
Jal Jeevan Mission JJM WSS to Kanjoor Sreemoolanagaram Chengamanad Nedumbassery and Parakkadavu Panchayaths Providing Distribution Network Providing FHTCs and Road Restoration Works in Parakkadavu Panchayath Pipeline Work
DEPOSIT-KWA/DW/2022 -2023 WSS to TKK in division 31.-DW-Providing water supply distribution lines at Kattamattom and Eramath road in Thrikkakara Muncipality-Pipeline Work
OandM Water Supply Schemes AMC CWSS to Palakkad Muncipality Ward41 52 Repair of various pipe lines and allied works for the year 2023 2024 AMC Pipeline Work
Jal Jeevan Mission WSS to Ala, Puliyoor, Budhanoor, Pandanad, Mulakkuzha, Venmony Panchayaths Chengannur Municipality- Venmony Panchayath-Supplying and Laying Distribution system Venmony Panchayath Zone 6-Pipeline Work
Others-PWD Road Cutting -JJM- Marakkara Pt Phase II,PWD Road Cutting - Moodal kavumpuram kadampuzha , kanjippura kottaramadam pallikkandam , kottakkal ampara kadampuzha , vattaparamb kadampuzha .Vettichira Anakkuzhiyal - Pipeline Work
Annual Plan-Pr no 181/24-Maintenance works of Pipeline road,StAntonys road and Menachery garden road in Division 15- Ollukkara zonal-Thrissur corporation-General Civil Work
O and M Water Supply Schemes-Annual Maintenance of Various size of Pipe lines WSS to Thiruvaniyoor Panchayat for the period of 2023 24 Pipeline Work 1
TENDER-Annual Plan-54/23 Marayoor GP Ward 7 Karimutty melkarimutty kudi paipeline extension and tank construction-54/23 pipeline extension and tank construction.-General Civil Work
JJM 2021 24 POTHENCODE PANCHAYATH PACKAGE II Augmentation of Existing Distribution network and providing new FHTCs to all households in Pothencode Grama panchayath Part 2 Pipeline Work
OandM - Water Supply Schemes-Annual maintenance of distribution system in RWSS to Nedumpuram and Peringara Grama Panchayaths -for the year 2024-25 -Pipeline Work-General Civil Work
O and M - Water Supply Schemes-AMC - WSS to N. Paravur Municipality and adjoining panchayaths-Annual maintenance of Chendamangalam panchayath for the year 2023-24 -Pipeline Work
AMRUT 2.O Providing FHTCs by augumentation /retrofitting of existing water supply schemes to Thrissur Corporation(8000 nos) Division 25 and Division 30 (Balance FHTC) Pipeline Work
Jal Jeevan Mission JJM- JJM-2022-23-WSS To Pananchery Puthur and Madakathara Panchayaths in Thrissur District - Providing Distribution network and FHTC to Pananchery Panchayath - Pipeline Work
Jal Jeevan Mission JJM Kannur District Vengad Panchayath WSS to Anjarakandy Peralassery and Adjoining Panchayaths Phase II (Balance Work) Laying distribution main and providing FHTC Pipeline Work
AMRUT North Paravur Municipality Providing 1309 nos Household connections and Street main extension in various wards of North Paravur Municipality in Ernakulam District Part 1 Pipeline Work
Deposit Work Kannur Corporation Public tap disconnection WSS to Kannur and adjoining panchayaths Public tap disconnection in Kannur Elayavoor and Edakkad Zones in Kannur Corporation Pipeline Work
KIIFB-KIIFB 2017 18 Muringoor Ezhattumugham road Replacement of PVC pipe lines from Muringoor Junction to Ezhattumugham Utility Shifting Balance Work at Muringoor Ezhattumugham road Pipeline Work
O and M - Water Supply Schemes-AMC - WSS to N. Paravur Municipality and adjoining panchayaths-Annual maintenance of Kottuvally panchayath for the year 2023-24-Pipeline Work
State Plan 2019-20 Extension from JICA distribution network Laying 110mm 970m PVC Gravity pipeline from Puthoormadam to the proposed sump site at Kolachippara in Perumanna GP
GENERAL-ANNUAL PROJECT 2025-26- PROJECT NO 384/26 PATHUVEEDU SC COLNY DRINKING WATER PROJECT TANKEXTENSION OF PIPELINE PURCHASE OF MOTOR AND RELATED WORKS-General Civil Work
DEPOSIT Thrikkakara Municipality Providing water supply line at Karimakkad Chalipparambu road to improve water supply at Thoppil Thayankeri lane in Ward 34 of Thrikkakara municipality Pipeline Work
Jal Jeevan Mission (JJM)-Chelannur grama panchayath-providing FHTCs by laying PVC pipes , gap closings and leak rectification work in Ambalappad, Palath and adjoining areas-pipeline work
AMRUT Anganvadi Amrut 1.0-Kozhikode water supply project - Providing water connections for anganavadi(Arunodhayam, Ambadi and Aswathi) and Providing water connections at Kundooparamba - Mokavoor road-Pipeline Work
O and M - Water Supply Schemes-AMC - WSS to N. Paravur Municipality and adjoining panchayaths-Annual maintenance of Ezhikkara panchayath for the year 2023-24 -Pipeline Work
DEPOSIT Deposit work of Thiruvananthapuram Corporation-Improving water supply towards Doosiyoorkonam areas in Cheruvaikkal Ward by laying 90mm PVC pipeline from Bapuji Nagar lane under Pongummoodu section
Integrated Water Supply Scheme Malappuram MWSS to Panakkad and Melmuri Villages Pipeline extension and replacement works in various wards of Panakkad and Melmuri Villages in Malappuram Municipality
DEPOSITCARWSS to Kozhinjmapara and Adjoining Villages - Project No.199/2025 Vadakarapathy Grama Panchayath-Supplying and Laying distribution main (140mm PVC) from Chunnambukalthode to Sorapara Jn-Pipeline Work
Annual Plan Kuzhalmannam GPt -2023-24 KOZHINJAMPARAMB WATER SUPPLY SCHEME MAINTENACE PELACHIRAMKAD PIPELINE INSTALLATION 2023-24 in Ward .07 - Project no. 85 /2023-2024-General Civil Work
Deposit work CWSS to Vengola Pipeline extension to Millumpady Hycount Road,Soubhagya Nagar Road and Mecherimattam LP school Road in Ward No I of Vengola Grama Panchayath
MLA-SDF-Njarakkal Panchayath-Laying 160 mm PVC Pipe along the side of VP road in connection with the construction of drain near Appangad Bridge-Pipeline Work
DRW 2019 Unique ID KDY M SPLAN 19 20 DRW IC 041 ARWSS to Kidangoor Interconnection of Pipeline between Kidangoor Church and Koodalloor road in Kidangoor Panchayath
AMRUT_Shifting of service connections_ providing scour valves_ control valves and interlinking of new lines with old lines_Package V _Additional work. Providing FHTCs_350Nos and related pipeline works_Pipeline Work
DEPOSIT-DEPOSIT- Inland Navigation-Mahi canal--KWA Utility Shifting at kaliyamvallli bridge -Supply Laying Testing and Commissioning of 355mm HDPE Pipe across Badagara mahe canal -Pipeline Work
State Plan 2022 23 OPTIMIZATION OF PRODUCTION AND TRANSMISSION WSS to Anjarakandy Peralassery and adjoining Panchayath Replacing AC Distribution with DI K9 pipe at Muzhappilangad Panchayath Pipeline
AMRUT 2.0 - PALAKKAD MUNICIPALITY-REPLACING OLD AC/GI PIPES AND PROVIDING PARALLEL DISTRIBUTION LINES - IN WARDS 28, 29, 30, 31 , 32 - REACH 2- Part 8-Pipeline Work
Jal Jeevan Mission JJM WSS to Kanjoor Sreemoolanagaram Chengamanad Nedumbassery and Parakkadau Panchayaths Providing distribution network Providing FHTCs and Road restoration works in Kanjoor Panchayath Pipeline Work
Jal Jeevan Mission (JJM)-Jal Jeevan Mission 2021-22 - Augmentation of Water Supply Scheme toThekkumkara Grama Panchayat and Providing FHTCs - Fifth SLSSC -Balance work -2-Pipeline Work
DEPOSIT-CSME-Providing water connection to G Sankara Kurup gallery-By laying CSME from Abraham Madamakkal road in Div. No. 40 (old) of Kochi Corp. -Pipeline Work
Deposit work of Thiruvananthapuram Corporation - Improving Water Supply by Laying 90mm PVC pipe towards Surabhi Gardens and Vrindavan lane in Akkulam Ward under Pongumoodu Section-Pipeline Work
SO 64/26-27, Ward 9-Vidakuzha AKG nagar main road and byelanes , Laksham veedu Hussain road byelanes tile laying drain construction , pipeline road byelane tile relaying
DEPOSIT-CSME-Laying of new 63 mm PVC pipe (6kg) on private earth road for Mr. Anwar K.H and others at Kariparambu road, Kottuvally Panchayath-Pipeline Work
DEPOSIT CSME Laying of new 63 mm PVC pipe on private road for Nishab V A and others near Thathapilly Karthikeyan road at Kottuvally Panchayath Pipeline Work
DEPOSIT CSME Laying of new 63 mm PVC pipe on private road for Deepa P and Santosh Pai near Thonniyakavu Thrikeapuram PWD at Kottuvally Panchayath Pipeline Work
AMC 2026 27 UWSS to Shoranur and Vaniyamkulam Leak Rectification works of various pipe lines and allied works in Vaniyamkulam Grama Panchayath for one year Pipeline Work
refer tender documents
Please refer tender document